The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Khayega/Malimili Spot Murram
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Grading & 7KM murraming
- output
- Passable road
- implementation status
- Completed
- total cost
- Ksh 7,747,858
- estimate
- Ksh 12,500,000
Mukhonje Iyenga Malimili Electric.
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2003
- action
- Construction of lab
- output
- Power supply
- implementation status
- paid but KPLC delayed
- total cost
- Ksh 6,997,654
- estimate
- Ksh 9,000,000
Mukumu-shisasari road
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2009
- action
- Dozzi/grade/murramm/culverts
- output
- Passable road
- implementation status
- complete
- total cost
- Ksh 5,815,000
- estimate
- Ksh 6,800,000
Lirhanda Girls secondary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- Build 2 Classes/dormitory
- output
- Complete /
- implementation status
- In use
- total cost
- Ksh 5,400,000
- estimate
- Ksh 800,000
Shiyuli Bridge
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Construction of bridge
- output
- Passable Bridge
- implementation status
- Completed
- total cost
- Ksh 4,700,000
- estimate
- Ksh 5,200,000
Lihranda- shisasri road
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2008
- action
- Grade
- output
- Passable
- implementation status
- Fully
- total cost
- Ksh 4,300,000
- estimate
- Ksh 4,900,000
Shibuye/Shanjero/ Elect
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Electricity Supply
- output
- Electricity Supply
- implementation status
- complete by REA
- total cost
- Ksh 3,150,000
- estimate
- Ksh 3,150,000
Mukumu-Mugomari Electr. Proj.
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- REA
- output
- electricity
- implementation status
- Not started
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,050,000
Muraka electricity
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Electrification
- output
- Power Supply
- implementation status
- Paid but KPLC delayed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Khayega Likhovero Elec.
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Elect frication
- output
- Supply power
- implementation status
- Complete –REA Funded
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Bulobi Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- 4 complete Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 2,750,000
- estimate
- Ksh 900,000
Khayega – Mukumu Shitochi Rd
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2008
- action
- Gravel road
- output
- clean water
- implementation status
- complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 4,000,000
St. Pauls Shibuye
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 2,200,000
- estimate
- Ksh 900,000
Murhanda Virhembe Sport Gravelling
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Grading of 5km road
- output
- Passable road
- implementation status
- Done
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,700,000
Shiswa Bridge
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- Build footbridge
- output
- Connect locations
- implementation status
- Completed
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,100,000
Shidodo secondary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build science lab/2 Classrooms
- output
- Improve results
- implementation status
- BuildingS ongoing
- total cost
- Ksh 1,900,000
- estimate
- Ksh 2,000,000
Mukhuru Water Project
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Lay pipes
- output
- Clean Water Supply
- implementation status
- piping ongoing
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,600,000
Musembe road
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Grading 5km
- output
- Passable road
- implementation status
- Done
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,000,000
Bukhaywa Secondary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Construction of Lab/2 claasrooms
- output
- Improve results
- implementation status
- Building completed
- total cost
- Ksh 1,700,000
- estimate
- Ksh 800,000
Magale secondarySchool
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Construction of Lab
- output
- Improve results
- implementation status
- Building complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 800,000
Shanjero Sec
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Lab construction/buy land
- output
- Operational Lab
- implementation status
- roof done/plastred
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,000,000
Mukhuvistu Culverts
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Install 16 culverts
- output
- Passable crossing
- implementation status
- Completed
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
Mukhonje secondary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Build complete library
- output
- Usable Library
- implementation status
- Library building complete but
- total cost
- Ksh 1,550,000
- estimate
- Ksh 800,000
Kambiri –Gravity Water Project
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Clean Piped water
- output
- Clean water
- implementation status
- 90% complete
- total cost
- Ksh 1,491,991
- estimate
- Ksh 1,491,991
Irobo Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 5 Classrooms
- output
- Expand the school
- implementation status
- 5 classes, roof, walls plastered
- total cost
- Ksh 1,400,000
- estimate
- Ksh 900,000
Musembe Dispensary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Working Disp
- output
- Working Disp\wiring
- implementation status
- roofed and plaster finished
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,000,000
Maluna primary School (New)
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Build 1 Classes/purchase land
- output
- Ensure enrollment
- implementation status
- Land purchased
- total cost
- Ksh 1,400,000
- estimate
- Ksh 700,000
Mukumu G. secondary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build canteen &Classrooms
- output
- Serve the students
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 800,000
Kambiri –Magale School Electricity
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2007
- action
- Power Supply
- output
- Power Supply
- implementation status
- To be carried out this year
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,000,000
Shamiloli secondary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Musingu Primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4classes roofed, walls plastered
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,700,000
Lirhanda Community Water
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Supply water
- output
- Clean water to locals
- implementation status
- On-going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Singila Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Buy land and build 2 classes
- output
- Enroll new students
- implementation status
- Land purchased 4 class build /renovation ongoing
- total cost
- Ksh 1,140,000
- estimate
- Ksh 900,000
Shakungu Sec
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Build office block/wiring
- output
- Staffroom for teachers
- implementation status
- Staff room completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 700,000
Lugala/Madioli/Elect.proj.
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2007
- action
- Supply power
- output
- Lighting
- implementation status
- Reallocated after REA took over
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Shamakhubu/Mukulusu/ Shiswa Elec.
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2007
- action
- Power Supply
- output
- Power to community
- implementation status
- Reallocated after REA took over
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
St. Phillips Mukomari secondary School-lab
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2005
- action
- Build lab
- output
- Improve studies
- implementation status
- 60% Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,400,000
Ikuywa secondary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 classes
- output
- Congestion
- implementation status
- Construction on lintel
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Mukhuru Youth Poly.
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2006
- action
- Construction of Workshop
- output
- Train students
- implementation status
- Finishing not done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Friends secondary School Handidi-Lab
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Construction of lab
- output
- Operational lab
- implementation status
- Building Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Kambi Mwanza –Vihiga Rd
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Passable Road
- output
- Passable Road
- implementation status
- murraming 6km done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Mukumu B. secondary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build computer lab
- output
- Expand the school
- implementation status
- Ongoing - Cofunded PTA
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Lugala secondary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Computer Lab
- output
- Computer Lab
- implementation status
- Building complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Solyo secondary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
St. Agnes secondaryShibuye
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Complete Office Block
- output
- Complete Office Block
- implementation status
- To be carried out this year
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Navangala primary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 1,000,000
- estimate
- Ksh 900,000
Mukhuru secondary School Lab
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build Lab
- output
- Improve studies
- implementation status
- Building incomplete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Lunyu secondary School Lab
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Construction of lab
- output
- Improve results
- implementation status
- Construction complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Shihuli Kwirenyi Road
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Grading&2km murraming
- output
- Passable road
- implementation status
- Completed -300,000 reallocated
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Mukulusu secondary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build New lab
- output
- Operational lab
- implementation status
- Complete in use
- total cost
- Ksh 900,000
- estimate
- Ksh 800,000
Shamakhubu Health Centre Ward
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build staff house
- output
- Houses staffs
- implementation status
- Roof, walls plastered
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Shipalo secondary Lab
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build science lab
- output
- Improve results
- implementation status
- Building complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Lugala Polytechnic
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Renovation
- output
- Renovation
- implementation status
- Good buildings
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Kambiri Health Centre (Ward)
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2003
- action
- Power Installed
- output
- Lighting
- implementation status
- Electric installation 50%
- total cost
- Ksh 880,000
- estimate
- Ksh 1,100,000
Shitsava Nursery
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 2 classes
- output
- Increase enrollment
- implementation status
- 2 classes, one office plastered
- total cost
- Ksh 850,000
- estimate
- Ksh 650,000
Ivakale primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- 4 complete Classrooms
- output
- expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ingolomosio Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- 4 complete Classrooms
- output
- expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mashindu Primary
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shanderema Primary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shikusa GK Prison primary
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ikuywa Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Vikusa Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
St. Phillips Mukomari primary
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lukusi Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Chilovani Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lunyu Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Ileho Primary School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lukusi Sec
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- Roof done
- total cost
- Ksh 800,000
- estimate
- Ksh 120,000
Ikuywa dispensary
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Build wards
- output
- Treat patients
- implementation status
- Construction ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Mukhonje primary
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 class/purhase of land
- output
- Ensure enrollment
- implementation status
- Building ongoing /land bouight
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Shamiloli Water pro
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2007
- action
- Sink borehole
- output
- Provide clean water
- implementation status
- Delayed by PMC
- total cost
- Ksh 800,000
- estimate
- Ksh 2,300,000
Malimili Secondary -Lab
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Lab constriction
- output
- Operational Lab
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Busulwa Primary School
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Iyenga Primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Buy land & build 2 class
- output
- Playing Ground/Classes
- implementation status
- Land purchased & 2 class build
- total cost
- Ksh 800,000
- estimate
- Ksh 1,800,000
Ivona Nursery
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Build 6 Classrooms
- output
- Expand the school
- implementation status
- 2 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 1,300,000
Bukusi Primary School
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mugomari primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Muraka primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Munasio primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Build Lab
- output
- Expand the school
- implementation status
- Lab completed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Isukha W. Polythenic
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Usable classrooms
- implementation status
- construction of 2 classrooms
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
Shirulu Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed , walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Khayega Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 3 Classrooms
- output
- Expand the school
- implementation status
- 3 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lugose Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shikusi Health C.
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build maternity wing
- output
- Attend delivery
- implementation status
- Walls and roof done
- total cost
- Ksh 800,000
- estimate
- Ksh 1,500,000
Shidodo Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lugango Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shilalyo primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mundulu Primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Museno secondary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build science lab
- output
- Improve results
- implementation status
- roofing and plaster complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Kwirenyi Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lugango secondary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build 3 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Shihuli primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 3 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Museno primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shikalakala primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Mukumu Boys primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 2 classes completed
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Sigalagala Technical
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Install water tanks
- output
- Provide water
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Walubengo River crossing
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- River crossing construction
- output
- passable bridge
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mwilitsa primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Wanzalala primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Iloro primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Secheno primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Madala primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Likhovero primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shanjero primary
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shabwali primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Muleche primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Kisaina primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shikulu primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes, roof, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Solyo Primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 classes
- output
- 4 Complete Classes
- implementation status
- 4 classes build upto roof
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Shamiloli Primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classroomsms
- output
- Enough classes
- implementation status
- 4 classes, roofed walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Shilanga Cattle Dip
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Renovate dip
- output
- Assist farmers
- implementation status
- Rehabilitation done
- total cost
- Ksh 800,000
- estimate
- Ksh 200,000
Itenyi Primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes roofed , walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Madioli primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes, roofed , walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Shiswa Primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Lirhanda Mixed primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms/renovation
- output
- Enough classes
- implementation status
- 4 classes roofed, walls plastered/renovation done
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Injira primary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lwanda secondary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes roofed walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Mukulusu primary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Lirhanda Girls primary Boarding
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classes/renovations
- output
- Expand school
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Shavirotsi primary School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- Build 2 C
- output
- Enough classes
- implementation status
- Ongoing/renovation done
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Shamakhubu road
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2007
- action
- 5 km murraming
- output
- Passable road
- implementation status
- Done not paid /coffunded
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Buyangu Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- 4 complete Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Magale Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- 4 complete Classrooms
- output
- Increase enrollment
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
St..Monica secondary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Construction of Lab
- output
- Operational lab
- implementation status
- Construction complete
- total cost
- Ksh 800,000
- estimate
- Ksh 900,000
Bukhaywa Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- 4 complete Classrooms
- output
- Expand school
- implementation status
- 4 classes ,roofed, walls plastered
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Mukhonje primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 755,000
- estimate
- Ksh 900,000
Shing’odo Water Proj.
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Lay pipes
- output
- Provide clean water
- implementation status
- 2 km completed
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Ivuyi Primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 classes
- output
- Increase enrollment
- implementation status
- 4 classes ,roof, walls plastered
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Lugala Primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Build staffroom
- output
- teachers offices
- implementation status
- roofing done
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Shijendilova River Bridge
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build river crossing
- output
- Passable bridge
- implementation status
- Completed
- total cost
- Ksh 750,000
- estimate
- Ksh 2,000,000
Shiina Primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4Classes roofed, walls plastered
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
St.Kizito Shihingo Primary
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- 4 complete Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Lirhanda community Dispensary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2006
- action
- Build sick bay
- output
- Attend to patients
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Isenyende primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes roofed walls plastered
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Shabwali secondary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2007
- action
- Build science lab
- output
- Improve results
- implementation status
- Building at ring beam
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Muhonjia River
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Install culverts
- output
- Passable crossing
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 800,000
Isukha Youth Poly
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 Classrooms
- output
- Expand the school
- implementation status
- 2 classes complete
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Mugomari sec
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 650,000
- estimate
- Ksh 900,000
Handidi Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Expand school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 650,000
- estimate
- Ksh 900,000
Ingolomosio sec
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 classes
- output
- Increase enrollment
- implementation status
- 2 classes roofed
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ihondolo Nursery School
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2005
- action
- Build 2 Classrooms
- output
- Enough classes
- implementation status
- 2 classes, roofed, walls plastered
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Munyanda primary School
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
New Shivagala primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2004
- action
- Build 4 Classroom
- output
- Enough classes
- implementation status
- 4 classes, roofed, walls plastered
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Muleche Nursery
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Build 2 classes
- output
- Ensure new enrollment
- implementation status
- 2 classes roofed & plaster
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Mukango Primary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Build 2 classes
- output
- Ensure new enrollment
- implementation status
- 2 classes completed
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Likhovero secondary
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2007
- action
- build toilets $ partition
- output
- Increase enrollment
- implementation status
- toilet build and partining done
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Mundulu dispensary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- Buy land & build ward
- output
- health care
- implementation status
- Bought .\0.5 acres, building on
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Mukumu Girls primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2006
- action
- Build 2 Classrooms
- output
- Expand the school
- implementation status
- 2 classes complete
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Buhunyilu primary
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Build 5 Classrooms
- output
- New school
- implementation status
- 2 classrooms completed
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Ikuywa cattle Dip
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2006
- action
- Construction of new dip
- output
- Working Dip
- implementation status
- 50% done
- total cost
- Ksh 550,000
- estimate
- Ksh 350,000
Shilolavakhali poly.
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2006
- action
- Equip Workshop/wiiring
- output
- Equip Workshop
- implementation status
- Tolls bought /wiring done
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Shanyinya Primary
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2005
- action
- Build 4 Classrooms
- output
- Expand the school
- implementation status
- 4 classes roofed, walls plastered
- total cost
- Ksh 550,000
- estimate
- Ksh 900,000
Ileho Health Centre-Mate
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2006
- action
- Construction of maternity ward
- output
- Attend to delivery
- implementation status
- Walls and plaster done
- total cost
- Ksh 500,000
- estimate
- Ksh 130,000
Shanderema secondarySchool
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Power Supply
- output
- Lighting
- implementation status
- Electricity supply complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Navangala Road
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2007
- action
- Spot patching 3km
- output
- passable road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 650,000
Ilesi water project
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2007
- action
- Lay pipes
- output
- Clean Water
- implementation status
- To be implemented next year
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Lubao Primary School
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Renovation of Classrooms
- output
- Give school face …..
- implementation status
- Outsider plaster done
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Shibuye Dip
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2004
- action
- Build cattle dip
- output
- Operational Dip
- implementation status
- structure completed
- total cost
- Ksh 480,000
- estimate
- Ksh 420,000
Ilesi APs Residence
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2003
- action
- Build 4 AP houses
- output
- Improve security
- implementation status
- Finishing ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Shibuye Girls Prim.
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2007
- action
- Renovate 8 classes
- output
- quality classes
- implementation status
- Roofing complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Shitochi sec
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 classes
- output
- ensure enrollment
- implementation status
- 2 classes roofed
- total cost
- Ksh 400,000
- estimate
- Ksh 1,200,000
Shiswa Sec
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2007
- action
- Build 2 classes
- output
- Ensure enrollment
- implementation status
- Building at lintel
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
Murhanda primary
- location
-
Muhanda
(in Shinyalu)
- year first funded
- 2007
- action
- Build 4 Classrooms
- output
- Enough classes
- implementation status
- 4 classes ,roofed walls plastered
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Ikuywa community Water Project
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2005
- action
- Lay pipes
- output
- Clean Piped Water
- implementation status
- Stalled
- total cost
- Ksh 350,000
- estimate
- Ksh 1,500,000
Ivihiga /Kisia /vikutsaRoad
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Spot patching/grading/murraming
- output
- Passable road
- implementation status
- Complete and usable
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Kambiri Electricity
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2008
- action
- install transformer
- output
- power
- implementation status
- not done
- total cost
- Ksh 300,000
- estimate
- Ksh 2,400,000
Shihilila Bridge
- location
-
Ilesi
(in Shinyalu)
- year first funded
- 2006
- action
- Construction of foot bridge
- output
- Passable Bridge
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Shamakhubu Health Centre
- location
-
Shibuye
(in Shinyalu)
- year first funded
- 2003
- action
- wiring of H. Centre
- output
- supply to ward
- implementation status
- Complete
- total cost
- Ksh 237,760
- estimate
- Ksh 237,760
Mutuli Nursery School
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2007
- action
- Build 1 class
- output
- Ensure enrollment
- implementation status
- Yet to start
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Mukhonje Cattle Dip
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Construction of dip
- output
- -
- implementation status
- On-going
- total cost
- Ksh 120,000
- estimate
- Ksh 250,000
Buyangu Cattle Dip
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Renovation dip
- output
- Operational dip
- implementation status
- Rehabilitation complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Ivakale Cattle Dip
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Renovation dip
- output
- Operational dip
- implementation status
- Rehabilitation complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Chilovan Cattle Dip
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Renovate dip
- output
- Working Lab
- implementation status
- Rehabilitation Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Ivihiga Cattle Dip
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2004
- action
- Renovate dip
- output
- Working Dip
- implementation status
- Rehabilitation Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Lwanungu Dip
- location
-
Khayega
(in Shinyalu)
- year first funded
- 2004
- action
- Renovate dip
- output
- Curb ticks
- implementation status
- Rehabilitation done
- total cost
- Ksh 120,000
- estimate
- Ksh 200,000
Kambiri Cattle Dip
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2004
- action
- Renovation dip
- output
- Operational dip
- implementation status
- Rehabilitation complete
- total cost
- Ksh 120,000
- estimate
- Ksh 150,000
Kambiri Water
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2008
- action
- sink borehole
- output
- clean water
- implementation status
- not done
- total cost
- Ksh 100,000
- estimate
- Ksh 1,500,000
Ivihiga water
- location
-
Ivihiga
(in Shinyalu)
- year first funded
- 2008
- action
- Build water tank
- output
- Provide water
- implementation status
- Yet to start
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Bukhaywa Water Project -2
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2006
- action
- Install pump
- output
- Clean Water
- implementation status
- To be carried out this year
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Bukhaywa Community Water Proj
- location
-
Kambiri
(in Shinyalu)
- year first funded
- 2005
- action
- Borehole Water
- output
- Borehole Water
- implementation status
- 50% complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000