The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Sigor
Cheptulel Boys Secondary School
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Domitory / Classrooms
- output
- Domitory / Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 4,400,000
- estimate
- Ksh 1,000,000
Fr Leo Secondary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Building Of Domitories
- output
- Domitories
- implementation status
- Ongoing
- total cost
- Ksh 3,800,000
- estimate
- Ksh 2,000,000
Kayemit Bridge
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Bridge
- implementation status
- Ongoing
- total cost
- Ksh 3,500,000
- estimate
- Ksh 20,000,000
Tamkal Secondary School
- location
-
Muino
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 3,180,000
- estimate
- Ksh 2,000,000
Sigor Cdf Office
- location
-
Weiwei
(in Sigor)
- year first funded
- 2003
- action
- Build Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 3,100,000
- estimate
- Ksh 2,000,000
Chesta/ Chemorlokotia/Kokworitit Road
- location
-
Lomut
(in Sigor)
- year first funded
- 2003
- action
- Road Constructions
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 3,000,000
Sina Ptop Road
- location
-
Tapach
(in Sigor)
- year first funded
- 2007
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 2,310,000
- estimate
- Ksh 2,310,000
Chesta Secondary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 500,000
Parua Secondary School
- location
-
Parua
(in Sigor)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 2,250,000
- estimate
- Ksh 700,000
Umpogh Water Project
- location
-
Muino
(in Sigor)
- year first funded
- 2007
- action
- Piping Of Water
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,000,000
Wakor Road
- location
-
Kopro
(in Sigor)
- year first funded
- 2003
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 1,850,000
- estimate
- Ksh 3,000,000
Soka Primary School
- location
-
Kopro
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 1,760,000
- estimate
- Ksh 100,000
Kaptabuk Secondary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Buying School Bus/Classroom
- output
- School Bus
- implementation status
- Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,400,000
Holy Rosary Secondary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,700,000
- estimate
- Ksh 2,000,000
Kapulwo-Solion Road
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Road Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,200,000
Masol Road
- location
-
Masol
(in Sigor)
- year first funded
- 2004
- action
- Bush Clearing
- output
- Road
- implementation status
- Accessible
- total cost
- Ksh 1,300,000
- estimate
- Ksh 200,000
Tamkal Dispensary
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,100,000
Parua Ptop Road
- location
-
Tapach
(in Sigor)
- year first funded
- 2007
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 1,290,000
- estimate
- Ksh 1,290,000
Orwo Ap Camp
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Put Up Buildings For Ap'S
- output
- Ap'S Houses
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Lokarkar Primary
- location
-
Masol
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 250,000
Ortum Secondary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 500,000
Kabich Bich Cdf Office
- location
-
Lelan
(in Sigor)
- year first funded
- 2003
- action
- Build Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Tapach Divadjudication
- location
-
Tapach
(in Sigor)
- year first funded
- 2004
- action
- Land Adjudication
- output
- Surveyed Land
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Sina / Kachemogen Road
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 3,000,000
Lokiriama Sub-SeRoadam
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Sub Surface Dam Construction
- output
- Sub Surface Dam
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 4,000,000
Kamanau/ Sekerot Water
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Piping
- output
- Pipe Water
- implementation status
- Ongoing
- total cost
- Ksh 1,080,000
- estimate
- Ksh 2,000,000
Lomut Water
- location
-
Lomut
(in Sigor)
- year first funded
- 2007
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Ortum Boys Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 300,000
Kabich Bich -Kapkunyuk Road
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2009
- action
- Roads Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Anet Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Dormitory / Renovation Of Classes
- output
- Renovated Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 965,000
- estimate
- Ksh 200,000
Nasolot Taloon Road
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 3,000,000
Cheptamas Borehole
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Sinking Of A Borehole
- output
- Bore Hole
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Mochowon-Chepokoriong Road
- location
-
Parua
(in Sigor)
- year first funded
- 2003
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Chepkoghin Road
- location
-
Sekerr
(in Sigor)
- year first funded
- 2003
- action
- Digging Road Side
- output
- Paved And Spacious Road
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 10,000,000
Ipeet-Sangat- Sigor Road
- location
-
Weiwei
(in Sigor)
- year first funded
- 2009
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 2,000,000
Kopro/Weiwei Water
- location
-
Kopro
(in Sigor)
- year first funded
- 2004
- action
- Construction And Piping
- output
- Pipe Water
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Runo Primary
- location
-
Weiwei
(in Sigor)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 875,000
- estimate
- Ksh 600,000
Kokwo Meses Primary
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 865,000
- estimate
- Ksh 200,000
Chesupet Dispensary
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 400,000
Takaywa Dispensary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 3,000,000
Tamkal Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 500,000
Lomut/ Chepkokogh Road
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2003
- action
- Road Constructions
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Lomut Health Centre
- location
-
Lomut
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Health Centre
- output
- Health Centre
- implementation status
- Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 720,000
Samakituk Drift
- location
-
Masol
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Drift
- output
- Drift
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Stelizas Secondary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 3,000,000
Mrikisian Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 300,000
Parkino Primary
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Renovated Classrooms
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 150,000
Weiwei Secondary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 800,000
- estimate
- Ksh 2,000,000
Ptokou Primary
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 780,000
- estimate
- Ksh 500,000
Chesekon Primary
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 500,000
Nasolot Dispensary
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2004
- action
- Build Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 50,000
Mokoyon Dispensary
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 1,000,000
Sekerr Mixed Secondary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 2,000,000
Kapsangar Secondary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 3,000,000
Kanyalitin Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 100,000
Paroo Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 350,000
Sebit Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 100,000
Cheratak Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2004
- action
- Construction Oftwo Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 200,000
Sina Dispensary
- location
-
Tapach
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 200,000
Chepkalit Secondary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Toosikirio Primary
- location
-
Kopro
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Parek Primary
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Koposes Primary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 200,000
Sigor Mix Primary
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 3,000,000
Kabich Water
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Mrel Furrow
- output
- Farrow
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Tapach Heath Centre
- location
-
Tapach
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Cheptya Dispensary
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Yayau Primary
- location
-
Kopro
(in Sigor)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 500,000
Kokworitit Primary School
- location
-
Mosop
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 200,000
Kariamakitei Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Completion Of Classrooms
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 100,000
Sengelel Dispensary
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 550,000
Rorok Chepserum Road
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Bushes & Stamps Clearing
- output
- Rural Road
- implementation status
- New Project
- total cost
- Ksh 632,134
- estimate
- Ksh 2,000,000
Sukuk Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 615,000
- estimate
- Ksh 150,000
Stanthony Sina Secondary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Kokwotendwo Primary School
- location
-
Kopro
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Kokwositet Primary
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Two Classes
- output
- Renovated Classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 150,000
Paroo / Kakechewa Road
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Road Constructions
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Kapsait Dispensary
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 3,000,000
Parua Dispensary
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 200,000
Arpolo Dispensary
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Annet Dispensarychepkokogh
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 200,000
Paroo Secondary School
- location
-
Muino
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 5,000,000
Lomut Boys Secondary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 6,000,000
Sigor Health Centre
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Renovation
- output
- Renovation
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 500,000
Sarmach Primary School
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 2,000,000
Embo Nokowo Water
- location
-
Lomut
(in Sigor)
- year first funded
- 2006
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 500,000
Ptulungwo Primary
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Renovated Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 200,000
Chemurlokotio Primary School
- location
-
Mosop
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 100,000
Mbara Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Cheptem Primary
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 300,000
Chepserum Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 200,000
Kaporowo Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 200,000
Kaporo Road
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2003
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 530,000
- estimate
- Ksh 1,000,000
Ptirap Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 515,000
- estimate
- Ksh 200,000
Tuwayoi Dip
- location
-
Kopro
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Lotupoi Water
- location
-
Parua
(in Sigor)
- year first funded
- 2005
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Nasolot Borehole
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2006
- action
- Sinking Of A Borehole
- output
- Bore Hole
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Dc Office Extension
- location
-
Weiwei
(in Sigor)
- year first funded
- 2008
- action
- Building Office
- output
- Office Building
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sositin Road
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
MaricHealth Centrehesogon Road
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Passable
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Nyanyaita Dispensary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2006
- action
- Adjudication
- output
- -
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Morpus Tree Nursary
- location
-
Batei
(in Sigor)
- year first funded
- 2007
- action
- Soil Conservation
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Tilakai Tree Nurseries
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2009
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tapach Mixed Day Secondary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 4,000,000
Lomut Primary
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 350,000
Nyangaita Primary School
- location
-
Sekerot
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Tapach Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2008
- action
- Construction Of One Class
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Endow Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Sostin Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Murpus Group Ranch
- location
-
Batei
(in Sigor)
- year first funded
- 2007
- action
- Planting Trees
- output
- Completing Classroom
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Akiriamet Primary School
- location
-
Masol
(in Sigor)
- year first funded
- 2005
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Sororo Primary School
- location
-
Mosop
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,200,000
Murpus Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 490,000
- estimate
- Ksh 200,000
Kamanau Primary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 473,405
- estimate
- Ksh 350,000
Onoch Dispensary
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Supukwo Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 400,000
Pitpagh Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Sangat Primary
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 300,000
Cherelyo Primary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Taloon Primary
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 300,000
Solion Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 300,000
Otiot Primary School
- location
-
Mosop
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Wakor Primary
- location
-
Kopro
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 250,000
Cheptokol Primary
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Renovated Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Kopro Dispensary/Kokwotendwo Dispensary
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Kabichbich Health Centre
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Wiring Of Buildings
- output
- Lighting H Centre
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 150,000
Sostin Water
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Intake Construction & Piping
- output
- Pipe Water
- implementation status
- Ongoing
- total cost
- Ksh 440,000
- estimate
- Ksh 800,000
Akiriamet Ap Post Fencing
- location
-
Masol
(in Sigor)
- year first funded
- 2008
- action
- Fencing Ap Post
- output
- Fenced Ap Post
- implementation status
- Complete
- total cost
- Ksh 426,426
- estimate
- Ksh 300,000
Ptokou Furrow Irrigation
- location
-
Weiwei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Furrows
- output
- Water Furrows
- implementation status
- Ongoing
- total cost
- Ksh 425,000
- estimate
- Ksh 100,000
Parayon Water Project
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2008
- action
- Pipe Laying
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Murpus Girls Secondary School
- location
-
Batei
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- One Class
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 6,000,000
Chesta Primary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kapsait Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Two Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Onoch Primary School
- location
-
Kopro
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kokwososion Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Penon Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Temogh Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Ngoyomwo Primary
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Chepkondol Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 250,000
Kokwopsis Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Ipeet Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Takar Primary
- location
-
Weiwei
(in Sigor)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Cheptongoghio Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Kaptabuk Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Domitories
- output
- Renovated Domitories
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 150,000
Stulumba Secondary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 7,000,000
Aic Kapsait Secondary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 3,000,000
Kamanau Dispensary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kapkaremba Dispensary
- location
-
Parua
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Tikit Dispensary
- location
-
Masol
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Adjudication Survey Morpus
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Land Adjudication
- output
- Surveyed Land
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Kamonmon Water Project
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Water Intake Construction
- output
- Water Intake
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Pitpagh Water Project
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2004
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Korosion Water Projects
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2008
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Stalled
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Murlem W
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2005
- action
- Piping
- output
- Water Source
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Takar Water Project
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Construttion Of Water Tiers
- output
- Water Tiers
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Mochowon Tokoch Fur Irg
- location
-
Weiwei
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Furrows
- output
- Construction Of Furros
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 150,000
Psirwo Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Psiywo Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,300,000
Taloon Water Project
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2005
- action
- Construttion Of Water Tiers
- output
- Tree Planting
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Parek Dispensary
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Chepkaitit Dispensary
- location
-
Sondany
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kokwokochi Primary School
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Renovated Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 300,000
Sekerot Primary School
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Sopowen Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 150,000
Korosion Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Kaptum Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Plalang Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- -
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 1,400,000
Arpolo Primary School
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kerelwa Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Sigor Youth Polytechnic
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Classes Construction
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 340,000
- estimate
- Ksh 0
Chesegon / Annet Road
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2007
- action
- Road Constructions
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 330,000
- estimate
- Ksh 500,000
Kapkanyar Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Two Rooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Chebon Water
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Water Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Likwon Road
- location
-
Weiwei
(in Sigor)
- year first funded
- 2009
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Sukut Dispensary
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Poito Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Ptarkong Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Psamar Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Slip Primary School
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
Marich Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Simama Livestock Farmers
- location
-
Masol
(in Sigor)
- year first funded
- 2009
- action
- Livestock Improvement & Demo
- output
- Better Breeds
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Arua Livestock Farmers
- location
-
Parua
(in Sigor)
- year first funded
- 2009
- action
- Livestock Breeding Demonstration
- output
- Beter Breeds
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Ptulungwo Cip
- location
-
Lomut
(in Sigor)
- year first funded
- 2007
- action
- Construction Of C.Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ortum Girls
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kapkunyuk Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kotopnguny Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2005
- action
- Completion Of Classrooms
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Ptarkong Cip
- location
-
Parua
(in Sigor)
- year first funded
- 2007
- action
- Construction Of C.Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Runo Cattle Dip
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Renovation Of Cattledip
- output
- Renovated C. Dip
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kamokotei Cdip
- location
-
Batei
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kapsoo Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Kangisia Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 270,000
- estimate
- Ksh 1,200,000
Chemolo Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 800,000
Tamkal Dip
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
Chepkokogh Women Bee Keeping
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Sample High Quality Bee Hives
- output
- Bee Hives
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Tapach Cattle Dip
- location
-
Tapach
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Empoghat Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
Kapusen Road
- location
-
Tapach
(in Sigor)
- year first funded
- 2004
- action
- Bush Clearing
- output
- Road
- implementation status
- Accessible
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
Seretow Cheptya Road
- location
-
Batei
(in Sigor)
- year first funded
- 2007
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 200,000
Taloon Dispensary
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kaptabuk Dispensary
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
Kalotwari Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2003
- action
- Constructinon Two Classrooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Imonponhet Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kochii Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
Kachemogen Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,200,000
Sina Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 100,000
Saya Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,400,000
Iyon Cattle Dip
- location
-
Batei
(in Sigor)
- year first funded
- 2008
- action
- Construction Of C.Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 400,000
Mrel Irrigation
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Construction And Piping
- output
- Pipe Water
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Chesilkich Cdip
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 150,000
Mochowon Water
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Sekerot Livestock Farmers
- location
-
Sekerot
(in Sigor)
- year first funded
- 2009
- action
- Livestock Improve & Demo Project
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Imonpoghet Dip
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Muruny Cattle Dip
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Renovation Of Cattledip
- output
- New Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Sina Polytechnic
- location
-
Chebon
(in Sigor)
- year first funded
- 2006
- action
- Building Construction
- output
- -
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Chupaghagh Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kaproch Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Samor Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Construction Of Classroom
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Ngerel Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2009
- action
- Construction Of A Class
- output
- One Class
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Sukonu Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Koghot Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kapsangar Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Chepkukui Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Sigor Girls Primary School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kapusien Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Chemalei Primary School
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kamelei Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of One Class
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Parua Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kapkaremba Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Emposimotwo Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Ptimorwo Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Chepokoriong Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 3,000,000
Emboghat Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Samich Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Marus Primary School
- location
-
Mosop
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Dungdung Primary School
- location
-
Masol
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 5,000,000
Iyoon Primary School
- location
-
Kopro
(in Sigor)
- year first funded
- 2006
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kokokwoblekwa Ri School
- location
-
Lelan
(in Sigor)
- year first funded
- 2009
- action
- Painting Of Five Rooms
- output
- Five Painted Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 100,000
Kabich Bich Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Domitories
- output
- Renovated Domitories
- implementation status
- Congoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Komugh Pre School
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Chesiryony Primary School
- location
-
Muino
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,200,000
Wakor Dispensary
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Purchasing/Repairs Med. Equ.
- output
- Repairs Of Equp.
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 50,000
Parua Gange
- location
-
Parua
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kapara-Ortum Road
- location
-
Batei
(in Sigor)
- year first funded
- 2009
- action
- Road Construction
- output
- Road
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 3,000,000
Ptimorwo Road
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Tamkals Chiefs Office
- location
-
Muino
(in Sigor)
- year first funded
- 2009
- action
- Building Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Wakor Chiefs Office
- location
-
Kopro
(in Sigor)
- year first funded
- 2009
- action
- Building Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Weiwei Chiefs Office
- location
-
Weiwei
(in Sigor)
- year first funded
- 2009
- action
- Building Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Nyangaita Chiefs Office
- location
-
Sekerot
(in Sigor)
- year first funded
- 2009
- action
- Building Office
- output
- Office Building
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Ptirap Water Project
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Olwo Wroj
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Construttion Of Water Tiers
- output
- Water Tiers
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kaporo Water
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Pusol Water Project
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Tangasia Dip
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyarpat / Waiwai Water
- location
-
Muino
(in Sigor)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,000,000
Ewan Wroj
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Cheptuya Catle Dip
- location
-
Batei
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kaipamayos Water Project
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 800,000
Chorok Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Domitories
- output
- Renovated Domitories
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ring Ring Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Chorwai Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2003
- action
- Construction Of Two Classrooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kamsiywon Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Chorok Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,200,000
Kapakepot Primary School
- location
-
Parua
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Chirkil Primary
- location
-
Sekerot
(in Sigor)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Renovated Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Seretow Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Renovation Two Classrooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Cheptya Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Renovation Oftwo Rooms
- output
- Two Classrooms
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Monjorwa Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Kapara Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- -
- implementation status
- To finish ground floor
- total cost
- Ksh 150,000
- estimate
- Ksh 1,300,000
Kabichbich Polytechnic
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Equipments Purchase
- output
- Poly Equipments
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
Annet Cattle Dip
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Catle Dip
- output
- Catle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Chesta Cattle Dip
- location
-
Lomut
(in Sigor)
- year first funded
- 2009
- action
- Construction Of C.Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Ptop Cattle Dip
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of C.Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Sangat Cattle Dip
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Cheptulel Cattle Dip
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2008
- action
- Construction Of A Cattle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Murpus Cattle Dip
- location
-
Batei
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 126,426
- estimate
- Ksh 0
Parua Pre School
- location
-
Parua
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kapchesich Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Kamugh Primary School
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2009
- action
- Construction Of New Class
- output
- One Class
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
Psukuno Primary School
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2009
- action
- Renovation Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
Chebon Primary School
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of One Class
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 3,000,000
Orwo Primary School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
Surumben Pre School
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classes
- output
- Classrrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Simbol Primary School
- location
-
Masol
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Chepkoghin Primary School
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Completion Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kaitongong Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Muruny Primary School
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Construction Of Classes
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,200,000
Parsonga Primary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kosholol Primary School
- location
-
Lomut
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Emmanuel Pre School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Likwon Pre School
- location
-
Weiwei
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Aic Tapach Pre School
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Chirkil Pre School
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Psamar Pre School
- location
-
Parua
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Muyokok PreSchool
- location
-
Mosop
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Marus Pre School
- location
-
Mosop
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Tarak Nursery School
- location
-
Tapach
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Korora PreSchool
- location
-
Lomut
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Kapusien Tree Nursery
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Tapach Tree Nursery
- location
-
Tapach
(in Sigor)
- year first funded
- 2009
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Porowo Dispensary
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Dispensary Building
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nasolot G Camp
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2006
- action
- Camp Construction
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Tamkal Foot Bridge
- location
-
Muino
(in Sigor)
- year first funded
- 2009
- action
- Construction Of Ft Bridge
- output
- Foot Bridge
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kwokwomeses Water
- location
-
Cheptulel
(in Sigor)
- year first funded
- 2004
- action
- Piping
- output
- Piped Water
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Karapogh Water Project
- location
-
Muino
(in Sigor)
- year first funded
- 2006
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,400,000
Soka Well
- location
-
Kopro
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Water Well
- output
- Water Well
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Chemorkos Water Project
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Furrows
- output
- Water Tiers
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chesilkich Water
- location
-
Lelan
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Chepkieny Water Project
- location
-
Lelan
(in Sigor)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Cherelyo Water Project
- location
-
Lomut
(in Sigor)
- year first funded
- 2005
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Sekerot Cattle Sprayers
- location
-
Sekerot
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Chepkokogh Bee Keeping
- location
-
Chepkokogh
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Sample High Quality Bee Hives
- output
- Bee Hives
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Psukuno Kapailel Cip
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- New Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Nasolot Cattle Dip
- location
-
Porkoyo
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Building
- output
- New Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Penon Cattle Dip
- location
-
Parua
(in Sigor)
- year first funded
- 2007
- action
- Renovation Of Cattledip
- output
- New Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sebit Cattle Dip
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Construction Of Classes
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Lonyamuruk Dip
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Cheparten Dip
- location
-
Kaptabuk
(in Sigor)
- year first funded
- 2004
- action
- Construction Of Dip
- output
- Dip
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sessimwo Primary School
- location
-
Chebon
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Baraka Tree Nursery
- location
-
Weiwei
(in Sigor)
- year first funded
- 2008
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 75,000
- estimate
- Ksh 2,000,000
Kopro Tree Nursery
- location
-
Kopro
(in Sigor)
- year first funded
- 2008
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 75,000
- estimate
- Ksh 100,000
Kachesium Tree Nurseries
- location
-
Muino
(in Sigor)
- year first funded
- 2008
- action
- Tree Seedlings Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 75,000
- estimate
- Ksh 200,000
Marich Emgergency
- location
-
Sekerr
(in Sigor)
- year first funded
- 2006
- action
- Stop Cholera Spread
- output
- -
- implementation status
- Complete
- total cost
- Ksh 70,000
- estimate
- Ksh 0
Lemlem Water Project
- location
-
Lelan
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Melewa Water Project
- location
-
Lelan
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Kamsiywon Water
- location
-
Lelan
(in Sigor)
- year first funded
- 2006
- action
- Piping
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Kamsis Water Project
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Laying Pipes
- output
- Piped Water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 2,000,000
Krikat Road
- location
-
Parua
(in Sigor)
- year first funded
- 2006
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Kisonowon Road
- location
-
Mosop
(in Sigor)
- year first funded
- 2007
- action
- Bush Clearing
- output
- Clear Road
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 1,000,000
Chorok Road
- location
-
Lelan
(in Sigor)
- year first funded
- 2004
- action
- Road Construction
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Korengoi Road
- location
-
Lelan
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Tangasia Road
- location
-
Chebon
(in Sigor)
- year first funded
- 2004
- action
- Bush Clearing
- output
- Road
- implementation status
- Accessible
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Kanyaltin Tree Nurery
- location
-
Lelan
(in Sigor)
- year first funded
- 2008
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Sengelel Pre School
- location
-
Sekerr
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 400,000
Chesupet Cattle Dip
- location
-
Lelan
(in Sigor)
- year first funded
- 2008
- action
- Construction Of Catle Dip
- output
- Cattle Dip
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Dungdung Pre-School
- location
-
Mosop
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Classroom
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 300,000
Mukurus Tree Nursery
- location
-
Mosop
(in Sigor)
- year first funded
- 2006
- action
- Soil Conservation
- output
- Tree Nursery
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Orolwo Primary School
- location
-
Batei
(in Sigor)
- year first funded
- 2004
- action
- Renovation Two Classrooms
- output
- Two Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Kokworitit Tree Nursary
- location
-
Mosop
(in Sigor)
- year first funded
- 2006
- action
- Soil Conservation
- output
- Tree Nursery
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Tanyngwan Tree Nursary
- location
-
Mosop
(in Sigor)
- year first funded
- 2006
- action
- Soil Conservation
- output
- Tree Nursery
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Sakat Tree Nursery
- location
-
Mosop
(in Sigor)
- year first funded
- 2006
- action
- Soil Conservation
- output
- Tree Nursery
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Chepkondol Tree Nursary
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Tree Seedlings Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Mtelo Tree Nursery
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Tree Seedlings Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Mbara Tree Nursary
- location
-
Sekerr
(in Sigor)
- year first funded
- 2005
- action
- Tree Nurseries Planting
- output
- Tree Nursery
- implementation status
- Ongoing
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Chirkit Foot Bridge
- location
-
Sekerot
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Complete
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Cheporomu Foot Bridge
- location
-
Sekerot
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Complete
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Cheworony Foot Bridge
- location
-
Weiwei
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Foot Bridge
- implementation status
- Ongoing
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Chesta Food Bridge
- location
-
Lomut
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Complete
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Iyion Foot Bridge
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Ongoing
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Kukugho Foot Bridge
- location
-
Kopro
(in Sigor)
- year first funded
- 2007
- action
- Construction Of Ft Bridge
- output
- Footbridge
- implementation status
- Ongoing
- total cost
- Ksh 15,000
- estimate
- Ksh 150,000
Cheptulele Primary School
- location
-
Cheptulel
(in Sigor)
- action
- n/a
- output
- -
- implementation status
- A newly initiated project
- total cost
- Ksh 0
- estimate
- Ksh 300,000
Kakitongin Primary School
- location
-
Lomut
(in Sigor)
- action
- Construction Of Classroom
- output
- Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 0
- estimate
- Ksh 500,000