The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Sirisia

Sirisia Water Tank

location
Sirisia (in Sirisia)
year first funded
2005
action
Water Tank
output
Closer Access To Water
implementation status
Tank Complete But Pipes Being Laid
total cost
Ksh 4,200,000
estimate
Ksh 5,000,000

Kisiwa Politechnic

location
Kabuchai (in Sirisia)
year first funded
2008
action
Wiring Of Adm Block & Tuition Block
output
Lighting
implementation status
To Be Started
total cost
Ksh 4,038,747
estimate
Ksh 400,000

Lurende/Khachonge Bridge

location
North Bukusu (in Sirisia)
year first funded
2006
action
Construction Of Bridge
output
Improve On Infrastructure
implementation status
Complete And In Use
total cost
Ksh 3,682,000
estimate
Ksh 1,182,000

Marobo/Luuya

location
Luuya (in Sirisia)
year first funded
2004
action
Construction Of Bridge
output
Improve Infrastructure
implementation status
Complete And In Use .
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Old Kibichori Water

location
Chwele (in Sirisia)
year first funded
2008
action
Construction Of Tank
output
Closer Water Access
implementation status
Funds Reallocated To Nakayonjo Water Project
total cost
Ksh 3,000,000
estimate
Ksh 500,000

Kisiwa Y/Polytechnic

location
Kabuchai (in Sirisia)
year first funded
2003
action
Equipments/Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovated Currently Technical Equipment Bought
total cost
Ksh 2,681,800
estimate
Ksh 0

Kibichori- Sichei Road Gravelling

location
Chwele (in Sirisia)
year first funded
2008
action
Road Grading, Gravelling, Muraming And Putting Culverts
output
Easy Access By Farmers And General Travelling
implementation status
Completed
total cost
Ksh 2,500,000
estimate
Ksh 2,500,000

Kikai-Binyenya Bridge

location
Namwela (in Sirisia)
year first funded
2006
action
Construction Of Bridge
output
Improve On Infrastructure
implementation status
Complete
total cost
Ksh 2,418,000
estimate
Ksh 2,418,000

Busakala Water Tank

location
Chwele (in Sirisia)
year first funded
2005
action
Tank Construction
output
Closer Access To Clean Water
implementation status
Completed
total cost
Ksh 2,270,000
estimate
Ksh 2,000,000

Nakayonjo Milembe Bridge

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Construction Of Bridge
output
Improve Infrastructure
implementation status
Completed
total cost
Ksh 2,200,000
estimate
Ksh 2,200,000

Chebukutumi Dispensary

location
Sirisia (in Sirisia)
year first funded
2004
action
Construction Of New Disp
output
Closer Medical Services
implementation status
On Going
total cost
Ksh 2,160,000
estimate
Ksh 2,000,000

Chwele Medical Training College

location
Chwele (in Sirisia)
year first funded
2009
action
Fencing Of 30 Acres Of Land Purchased
output
-
implementation status
On Going
total cost
Ksh 2,000,000
estimate
Ksh 0

River Mayayi Bridge

location
Sirare (in Sirisia)
year first funded
2005
action
Construction Of Bridge
output
Improve Infrastructure
implementation status
Complete And In Use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kaptanai Dispensary

location
Namwela (in Sirisia)
year first funded
2004
action
Construction
output
Closer Medical Services
implementation status
On-Going
total cost
Ksh 1,960,000
estimate
Ksh 0

Chwele Friends Dispensary

location
Namwela (in Sirisia)
year first funded
2004
action
Construction
output
Closer Medical Services
implementation status
Complete And In Use, Maternity Wing To Be Painted And Internal Fitting
total cost
Ksh 1,468,000
estimate
Ksh 2,500,000

Madisi Secondary School

location
Chwele (in Sirisia)
year first funded
2004
action
Construction Of A Laboratory (Twin)
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed, One Part Completed
total cost
Ksh 1,460,000
estimate
Ksh 1,500,000

Khachonge Girls

location
North Bukusu (in Sirisia)
year first funded
2005
action
Construction Of A Dining Hall And Roofing
output
Provision Of Conducive Environment For Good Performance
implementation status
2 Acre Of Land Bought Roofed Adm Block.
total cost
Ksh 1,440,000
estimate
Ksh 1,500,000

Lwakhakha Dispensary

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Construction Of Dispensary
output
Closer Medical Services
implementation status
Roofed, Shuttered, Plastered Not Floored And Painted
total cost
Ksh 1,410,000
estimate
Ksh 2,500,000

Bukokholo Dispensary

location
Malakisi (in Sirisia)
year first funded
2004
action
Construction Of A Health Centre
output
Closer Medical Services
implementation status
Roofed, Plastered, Windows Fitted
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Luuya Dispensary

location
Luuya (in Sirisia)
year first funded
2006
action
Construction Of Health Centre
output
Closer Medical Services
implementation status
Completed
total cost
Ksh 1,400,000
estimate
Ksh 2,000,000

Lwandanyi Secondary School

location
Lwandanyi (in Sirisia)
year first funded
2004
action
Tuition Block/ 1 Classroom&Plastering,Flooring&Fixing Shutters
output
Increased Enrolment /Conducive Learning Environment
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

Namangogulo Secondary School

location
Sirisia (in Sirisia)
year first funded
2004
action
Dormitory
output
Increased Enrolment /Conducive Learning Environment
implementation status
Dining Hall Ongoing
total cost
Ksh 1,390,000
estimate
Ksh 2,500,000

Bukokholo Secondary School

location
Malakisi (in Sirisia)
year first funded
2004
action
Twin Dormitory & One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed Shuttered, Not Floored, Painted
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Chwele Health Centre

location
Chwele (in Sirisia)
year first funded
2004
action
Maternity Wing Power House
output
Closer Medical Services
implementation status
Power Connected, Wiring Ongoing
total cost
Ksh 1,299,747
estimate
Ksh 1,500,000

Sikulu Dispensary

location
Chwele (in Sirisia)
year first funded
2004
action
Residential House And Dispensary Complete
output
Closer Medical Services
implementation status
Roofed
total cost
Ksh 1,273,600
estimate
Ksh 1,013,600

Kimalewa Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Construction Of A Dormitory
output
Increased Enrolment /Conducive Learning Environment
implementation status
At Wall Plate
total cost
Ksh 1,250,000
estimate
Ksh 2,000,000

Tamlega Secondary School

location
Malakisi (in Sirisia)
year first funded
2004
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 1,190,000
estimate
Ksh 1,000,000

Khachonge Dispensary

location
North Bukusu (in Sirisia)
year first funded
2005
action
Roofing The Maternity Wing
output
Closer Medical Services
implementation status
On Going
total cost
Ksh 1,143,600
estimate
Ksh 2,500,000

Lurende Primary School

location
North Bukusu (in Sirisia)
year first funded
2004
action
Construction Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
4 Classrooms Roofed With Old Iron Sheets, 8 Needs Steel Shutters 2 Classrooms Roofed ? Plastering, Flooring, Painting, Shutters
total cost
Ksh 1,104,500
estimate
Ksh 1,200,000

Kolani Dispensary

location
Namwela (in Sirisia)
year first funded
2005
action
Construction
output
Closer Medical Services
implementation status
Require Some Finishing
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Chwele Health Centre

location
Chwele (in Sirisia)
year first funded
2007
action
Purchasing Of Shutters, Plastering And Flooring Of Maternity Wing
output
Closer Medical Services
implementation status
Roofed One Part Plastered And Roofed
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Chekulo Secondary School

location
Luuya (in Sirisia)
year first funded
2004
action
4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
4 Classrooms Complete In Use. Adm Block Foundation Laid -1.2M
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Nangwe Secondary School

location
Sirare (in Sirisia)
year first funded
2006
action
4 Classrooms& Buying Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
11/2 Ha Bought At 2 Classroom Complete One Classroom Roofed Used As Offices Requires Plastering, Window Panes, Painting,. Kitchen Needs Roofing, Plastering, Shutters And Veranda.
total cost
Ksh 1,094,545
estimate
Ksh 1,200,000

Kuywa Girls Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Admin Block&Renovation Of 7 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Almost To The Lintel
total cost
Ksh 1,086,266
estimate
Ksh 1,086,266

Sirare Yourth Polytechnich

location
Sirare (in Sirisia)
year first funded
2006
action
Construction Of 1 Classroom
output
Self Employment
implementation status
Ongoing
total cost
Ksh 1,081,800
estimate
Ksh 600,000

Malakisi Health Centre

location
Malakisi (in Sirisia)
year first funded
2007
action
Construction Of Maternity Wing
output
Closer Medical Services.
implementation status
To Be Painted And Doors Fitted
total cost
Ksh 1,074,570
estimate
Ksh 1,000,000

Namilama Secondary School

location
North Bukusu (in Sirisia)
year first funded
2004
action
Dining Hall
output
Increased Enrolment /Conducive Learning Environment
implementation status
Generator Bought, 2 Classroom Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,500,000

Lwandanyi Dispensary

location
Lwandanyi (in Sirisia)
year first funded
2004
action
Construction Of Dispensary
output
Closer Medical Services
implementation status
Complete
total cost
Ksh 1,013,600
estimate
Ksh 900,000

Khachonge Girls Secondary School

location
North Bukusu (in Sirisia)
year first funded
2009
action
Drilling And Construction Of Water Tank
output
Closer Access To Water
implementation status
On Going
total cost
Ksh 1,000,000
estimate
Ksh 0

Malakisi Piped Water

location
Malakisi (in Sirisia)
year first funded
2008
action
Construction Of Water Tank
output
Closer Access To Clean Water
implementation status
More Pipes Laid For More Users .
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Mabanga Water Tank Pipes

location
North Bukusu (in Sirisia)
year first funded
2007
action
Water Tank And Renovation
output
Closer Access To Clean Water.
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Chebukaka Girls Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Borehole Drilling, One Classroom
output
Conducive Learning Environment
implementation status
2 Classroom To Wall Plate
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Nalondo Water Tank

location
North Bukusu (in Sirisia)
year first funded
2005
action
Construction of Water Tank
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 970,000
estimate
Ksh 970,000

Kimalewa Health Centre

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Solar Installation
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 963,000
estimate
Ksh 1,000,000

Nalondo Health Centre

location
Kabuchai (in Sirisia)
year first funded
2005
action
Wards And Purchase Of Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 1,500,000

Cbm Nalondo Dispensary

location
Kabuchai (in Sirisia)
year first funded
2004
action
Construction
output
Closer Medical Services
implementation status
Complete But Not In Use.
total cost
Ksh 950,000
estimate
Ksh 2,500,000

Kaburwet Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Adm. Bloc
output
Increased Enrolment /Conducive Learning Environment
implementation status
Not Painted 4 Classrooms Walled & Roofed, Shuttered, Floored, Plastered.
total cost
Ksh 900,000
estimate
Ksh 1,400,000

Namangofulo Dispensary

location
Sirisia (in Sirisia)
year first funded
2007
action
Plastering And Flooring The Nurse House
output
Closer Medical Services.
implementation status
Roofed, Plastered, Floored Painted Fix In Doors And Windows
total cost
Ksh 900,000
estimate
Ksh 0

Sikusi Sec

location
Kabuchai (in Sirisia)
year first funded
2005
action
PurchaseOf Land, Classroom And Dining Hall
output
Increased Enrolment /Conducive Learning Environment
implementation status
1 Classroom Is Complete. 1 Ha Of Land Bought.
total cost
Ksh 900,000
estimate
Ksh 1,200,000

Nalondo Secondary School

location
Sirare (in Sirisia)
year first funded
2004
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Bwake Secondary School

location
Luuya (in Sirisia)
year first funded
2005
action
Construction Of A Dormitory & Kitchen
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of P.H Completed 4 Classrooms .Requires: Painting, Window Pane.
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Toloso Secondary School

location
Namwela (in Sirisia)
year first funded
2004
action
Wiring And Paying Kplc
output
Provision Of Light
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 900,000

Binyenya Secondary School

location
Namwela (in Sirisia)
year first funded
2006
action
Construction Of A Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Flooring, Plastering, Roofing, Shutters And Painting
total cost
Ksh 890,000
estimate
Ksh 750,000

Musokho Sec

location
Kabuchai (in Sirisia)
year first funded
2006
action
Construction Of 5 Classrooms And Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
Land 2 Acre Was Bought. 3 Classroom In Use But Requires Plastering& Painting.
total cost
Ksh 880,000
estimate
Ksh 700,000

Chemwa Bridge Dispensary

location
Sirare (in Sirisia)
year first funded
2008
action
Buying Land
output
Closer Medical Services
implementation status
Land Purchased
total cost
Ksh 873,000
estimate
Ksh 263,000

Bisunu Dispensary

location
Sirisia (in Sirisia)
year first funded
2005
action
Flooring, Plastering And Painting Of Nurses Staff House
output
Closer Medical Services
implementation status
Ongoing
total cost
Ksh 863,630
estimate
Ksh 1,063,630

Marobo Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
Adm Office \And 2 Class
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms Roofed &Almost Complete. Adm Block On Wall Plate.
total cost
Ksh 853,600
estimate
Ksh 550,000

Chebukuyi Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Construction Of Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Walled, Roofed, Plastered, Shuttered, Not Painted
total cost
Ksh 850,000
estimate
Ksh 770,000

Bisunu Secondary School

location
Sirisia (in Sirisia)
year first funded
2004
action
Plastering, Flooring And Painting
output
Increased Enrolment
implementation status
Admin Block Complete, I Classroom Ongoing
total cost
Ksh 835,000
estimate
Ksh 1,000,000

Ack Butonge Secondary School

location
Malakisi (in Sirisia)
year first funded
2007
action
Construction Of A Dormitory
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed, Plastered Not Floored And Painted
total cost
Ksh 804,545
estimate
Ksh 1,200,000

Sichei Dispensary

location
Chwele (in Sirisia)
year first funded
2007
action
Construction Of A Health Centre
output
Closer Medical Services
implementation status
Roofed, Plastered But Needs Painting
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Mabanga Girls Secondary School

location
Luuya (in Sirisia)
year first funded
2004
action
Dormitory & Lab, Plastering, Flooring, Fixing Windows Panes
output
Increased Enrolment /Conducive Learning Environment
implementation status
Dormitory Complete Laboratory Requires Plastering, Painting.
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Kaptanai Sec

location
Namwela (in Sirisia)
year first funded
2005
action
1 Classroom Renovation
output
Provision Of Conducive Learning Environment
implementation status
Plastering, Flooring, Trenching, Shutters, Painting Needed
total cost
Ksh 800,000
estimate
Ksh 700,000

Londo primary School

location
Malakisi (in Sirisia)
year first funded
2004
action
Adm. Block 2
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed
total cost
Ksh 800,000
estimate
Ksh 800,000

Bukokholo Water Tank

location
Malakisi (in Sirisia)
year first funded
2005
action
Construction Of Tank
output
Closer Access To Clean Water
implementation status
Complete In Use
total cost
Ksh 770,000
estimate
Ksh 770,000

Chebusitati Primary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Construction Of Adm. Block 2 Classrooms
output
Conducive Learning Environment For Teachers And Students
implementation status
2 Classroom Sunk In The Ground And Cracked All Over
total cost
Ksh 755,450
estimate
Ksh 10,000,000

Lukhome Dispensary

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Residential Dispensary Completion
output
Closer Medical Services
implementation status
Expansion Ongoing
total cost
Ksh 750,000
estimate
Ksh 1,500,000

Luuya Girls School

location
Luuya (in Sirisia)
year first funded
2004
action
Renovation &Construction Of I Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovated Classrooms And Library. 1 Classroom Complete
total cost
Ksh 750,000
estimate
Ksh 750,000

Karibuni Gsec

location
Sirisia (in Sirisia)
year first funded
2004
action
Construction Of A Twin House
output
Enhance Increased Enrolment
implementation status
Complete And In Use
total cost
Ksh 750,000
estimate
Ksh 800,000

Chebukwa Secondary School

location
Kabuchai (in Sirisia)
year first funded
2006
action
Adm.Block And One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
1 Classroom Completed And In Use. D.H-Roofed ?Kitchen Floored, Plastered
total cost
Ksh 750,000
estimate
Ksh 650,000

Kiboochi Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
5Classroom Roofed
total cost
Ksh 750,000
estimate
Ksh 500,000

Ndakaru Secondary School

location
Sirisia (in Sirisia)
year first funded
2004
action
Adm. Block&Plastering, Flooring Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed But Not Plastered
total cost
Ksh 740,000
estimate
Ksh 940,000

Namwela Secondary School

location
Namwela (in Sirisia)
year first funded
2007
action
Wiring Of 4 Classrooms
output
Lighting
implementation status
Wiring Done, Power Connected
total cost
Ksh 738,747
estimate
Ksh 1,000,000

Kuywa Girls Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
Buying Underground Cables, Wiring Of Classrooms & Ad Block
output
Lighting
implementation status
Wiring On
total cost
Ksh 738,747
estimate
Ksh 1,000,000

Komiriai Primary School

location
Lwandanyi (in Sirisia)
year first funded
2004
action
8 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 722,611
estimate
Ksh 1,500,000

Kuywa Primary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Construction Of 4
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed
total cost
Ksh 705,450
estimate
Ksh 700,000

Nangwe Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classroom Completed
total cost
Ksh 704,545
estimate
Ksh 900,000

Khachonge Borehole

location
North Bukusu (in Sirisia)
year first funded
2004
action
Drilling
output
Closer Access To Clean Water
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 700,000

St. Monica Girls Sec

location
Malakisi (in Sirisia)
year first funded
2006
action
Construction Of Dormitory And Classrooms
output
Provision Of Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 700,000
estimate
Ksh 900,000

Sichei Secondary School

location
Chwele (in Sirisia)
year first funded
2006
action
3 Classrooms&Roofing Of 2 Classrooms, Plastering Of 5 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classrooms To Be Plastered
total cost
Ksh 700,000
estimate
Ksh 900,000

Mukhweya Dispensary

location
North Bukusu (in Sirisia)
year first funded
2008
action
Buying Land
output
Closer Medical Services
implementation status
Constructed Up To Roofing Level.
total cost
Ksh 693,600
estimate
Ksh 263,600

Makhonge Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Renovation Of Adm. Block And 2 Classrooms, Plastering Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Roofed
total cost
Ksh 690,000
estimate
Ksh 550,000

Busakala Secondary School

location
Chwele (in Sirisia)
year first funded
2005
action
Completion Of Dormitory (Topping)
output
Increased Enrolment /Conducive Learning Environment
implementation status
Completed
total cost
Ksh 690,000
estimate
Ksh 500,000

Lwandanyi Polytechnic

location
Lwandanyi (in Sirisia)
year first funded
2003
action
Renovation & Equipment
output
Create Self Employment
implementation status
Equipments Bought, More Needed
total cost
Ksh 681,800
estimate
Ksh 800,000

Sichei Polytechnic

location
North Bukusu (in Sirisia)
year first funded
2008
action
Buying Land
output
Create Employment
implementation status
Purchase Of Land
total cost
Ksh 681,800
estimate
Ksh 800,000

Mukuyuni Polytechnic

location
Mukuyuni (in Sirisia)
year first funded
2008
action
Construction Of A Classroom
output
Create Employment
implementation status
At Wall Plate Roofing Timbers Available
total cost
Ksh 681,800
estimate
Ksh 1,000,000

Kiboochi Polytechnic

location
Luuya (in Sirisia)
year first funded
2008
action
Buying Of Land
output
Create Employment
implementation status
Purchase Of Land
total cost
Ksh 681,800
estimate
Ksh 500,000

Munyanganyi Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Adm. Block/1 Classroom
output
Increased Enrolment/ Conducive Learning
implementation status
Complete One Side Of The Structure
total cost
Ksh 650,000
estimate
Ksh 0

Sirare Ngalasia Dispensary

location
Sirare (in Sirisia)
year first funded
2005
action
Staff Houses
output
Closer Medical Services
implementation status
Complete And In Use
total cost
Ksh 650,000
estimate
Ksh 650,000

Sikusi Dispensary

location
Kabuchai (in Sirisia)
year first funded
2006
action
Construction Of Health Centre
output
Closer Medical Services
implementation status
Complete And In Use
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Musokho Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
4 Classrooms Were Constructed And Need Painting, Plastering, Flooring, Veranda 5Th Class Foundation Made.
total cost
Ksh 650,000
estimate
Ksh 600,000

Walukaya Primary School

location
North Bukusu (in Sirisia)
year first funded
2008
action
Buying Land
output
Increased Enrolment
implementation status
Land Purchased And Processing Of Land Title Deed
total cost
Ksh 640,000
estimate
Ksh 240,000

Kabuchai H/ Centre

location
Kabuchai (in Sirisia)
year first funded
2004
action
Renovation
output
Closer Medical Services
implementation status
Renovation Done
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Ack Butonge Dispensary

location
Malakisi (in Sirisia)
year first funded
2007
action
Construction Of A Health Centre
output
Closer Medical Services
implementation status
Roofed But Not Plastered
total cost
Ksh 600,000
estimate
Ksh 800,000

Marobo Secondary School

location
Luuya (in Sirisia)
year first funded
2004
action
Renovation/One & Construction Of A Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of Classroom Done Construction 1 Classroom Require Flooring, Plastering Shutters.
total cost
Ksh 600,000
estimate
Ksh 600,000

Kabuchai S Sec

location
Kabuchai (in Sirisia)
year first funded
2007
action
Construction Of 1 Classroom And Lab
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of 3 Classroom And An Office Done.
total cost
Ksh 600,000
estimate
Ksh 300,000

Nairumbi Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms Constructed, Bought ? Acre At 120,000/=. Processing Of Title Deed Is On
total cost
Ksh 600,000
estimate
Ksh 700,000

Chemwa Primary School

location
Sirare (in Sirisia)
year first funded
2004
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms On Adm Block Require Veranda, Window Panes, Painting And Roughcasting.
total cost
Ksh 600,000
estimate
Ksh 850,000

Namakhele Primary School

location
North Bukusu (in Sirisia)
year first funded
2004
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classrooms Completed. Bought 1/2Acre Of Land But Processing Of Title Deed Not Complete.
total cost
Ksh 570,000
estimate
Ksh 870,000

Sirisia Township Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
Plastering, Flooring Of One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
One Classroom Roofed But Not Floored &Not Plastered
total cost
Ksh 550,000
estimate
Ksh 450,000

Sibumba Primary School

location
Namwela (in Sirisia)
year first funded
2006
action
Construction of Of 5 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Built 3 Classrooms. Plastering Of 5 Classrooms, Flooring, Fitting Windows, Frame Door And Painting Needed
total cost
Ksh 550,000
estimate
Ksh 750,000

Pongola Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
2 Classrooms & Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Complete And Land Bought. Renovation Of 4 Classroom Done.
total cost
Ksh 550,000
estimate
Ksh 650,000

Nakitumba Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Completed
total cost
Ksh 550,000
estimate
Ksh 600,000

Korosiandeti Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
On-Going
total cost
Ksh 550,000
estimate
Ksh 700,000

Chwele Boys Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Construction Of 4 Classrooms And A Dormitory
output
Increased Enrolment /Conducive Learning Environment
implementation status
Plastering, Flooring, Window And Door Frame, Painting
total cost
Ksh 550,000
estimate
Ksh 750,000

Lwandanyi Dispensary

location
Lwandany (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 538,765
estimate
Ksh 500,000

Namwela Secondary School

location
Namwela (in Sirisia)
year first funded
2004
action
Dormitory And One Classroom/Electricity
output
Increased Enrolment/ Conducive Learning
implementation status
Plastering, Painting Ongoing
total cost
Ksh 526,000
estimate
Ksh 526,000

Makhonge Health Centre

location
Mukuyuni (in Sirisia)
year first funded
2008
action
Buying Of Land
output
Construction
implementation status
To Be Started
total cost
Ksh 510,000
estimate
Ksh 50,000

Samita Primary School

location
Chwele (in Sirisia)
year first funded
2005
action
Adm. Block & 1 Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Roofed 1 Acre Of Land Bought
total cost
Ksh 502,272
estimate
Ksh 600,000

Kuafu Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
8 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Construction Of 7 Classrooms Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Sitila Primary School

location
Sirare (in Sirisia)
year first funded
2004
action
Construction of Of 6 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom And Office Needs Painting. Renovated 2 Classrooms Complete Only Painting Needed
total cost
Ksh 500,000
estimate
Ksh 700,000

Malakisi Muslim Primary School

location
Malakisi (in Sirisia)
year first funded
2006
action
4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
One Classroom Roofed But Not Plastered And Windows Not Fitted Floored, Painted.
total cost
Ksh 500,000
estimate
Ksh 1,200,000

Mikayu Primary School

location
Luuya (in Sirisia)
year first funded
2004
action
Construction Of 6 Classrooms & Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
6Classroom Were Put Up 5Requres Flooring, Shutters, Painting, Window And Door. 6Th Lintel Level, 4Th Roofed With Old Iron Sheets.
total cost
Ksh 500,000
estimate
Ksh 600,000

Sawali Primary School

location
Sirare (in Sirisia)
year first funded
2008
action
Buying Of Land
output
Increased Enrolment/Conducive Learning Environment
implementation status
Land Purchase On The Process (1Ha)
total cost
Ksh 500,000
estimate
Ksh 430,000

Sengeteti Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Admin Block&2 Classrooms & Administration Block
output
Increased Enrolment /Conducive Learning Environment
implementation status
Plastering, Flooring, Painting Is Needed
total cost
Ksh 500,000
estimate
Ksh 600,000

Lwandanyi Water Tank

location
Lwandanyi (in Sirisia)
year first funded
2008
action
Construction Of Tank
output
Closer Access To Clean Water
implementation status
Tank Installed
total cost
Ksh 500,000
estimate
Ksh 500,000

Korosiandeti Dispensary

location
Lwandanyi (in Sirisia)
year first funded
2004
action
Ward Construction
output
Lighting
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Sibumba Girls Secondary School

location
Namwela (in Sirisia)
year first funded
2006
action
1 Acre Of Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
Land Bought
total cost
Ksh 500,000
estimate
Ksh 300,000

Malakisi Ack Secondary School

location
Malakisi (in Sirisia)
year first funded
2007
action
One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 200,000

Chwele GPrimary School

location
Namwela (in Sirisia)
year first funded
2006
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Needs Flooring, Window Frame And Door& Painting
total cost
Ksh 500,000
estimate
Ksh 600,000

Khalaba Primary School

location
Kabuchai (in Sirisia)
year first funded
2004
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Constructed And Requires Final Finishing
total cost
Ksh 500,000
estimate
Ksh 650,000

Namaondo Cbm Primary School

location
Chwele (in Sirisia)
year first funded
2005
action
Purchase Of Land 1
output
Increased Enrolment /Conducive Learning Environment
implementation status
Purchase Of One Acre Of Land
total cost
Ksh 490,000
estimate
Ksh 600,000

Misiri Primary School

location
North Bukusu (in Sirisia)
year first funded
2003
action
8 Classrooms & Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
8 Classrooms 4 Complete 4 Needs Final Finishing Adm Half Way Roofed With Old Iron Sheets. Flooring Painting Inside, Shutters For 8 Classrooms Are Needed.
total cost
Ksh 458,160
estimate
Ksh 600,000

Lukhome Primary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed, Floor &Plastering
total cost
Ksh 455,450
estimate
Ksh 600,000

Toloso Sec

location
Namwela (in Sirisia)
year first funded
2007
action
2 Classrooms
output
Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 450,000

Lurare Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
Construction O2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
On-Going
total cost
Ksh 450,000
estimate
Ksh 600,000

Matibo Rc Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Now Plastering Inside, Flooring &Painting
total cost
Ksh 450,000
estimate
Ksh 500,000

Khatiri Primary School

location
Luuya (in Sirisia)
year first funded
2004
action
3 Classrooms & Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classes Complete And In Use Land 11/4 Acre Bought.
total cost
Ksh 450,000
estimate
Ksh 450,000

Nabeki R Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Adm. Block
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 450,000
estimate
Ksh 550,000

Queen Of Angles

location
Lwandanyi (in Sirisia)
year first funded
2008
action
Construction Of A Dormitory
output
Good Environment For Learning
implementation status
Construction On Going
total cost
Ksh 450,000
estimate
Ksh 450,000

Sichei R Primary School

location
North Bukusu (in Sirisia)
year first funded
2005
action
Construction of Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of 2 Classrooms Complete. Constructed 2 Classrooms With Needs Plastering Out, Roughcasting Fascia Board
total cost
Ksh 410,000
estimate
Ksh 520,000

Wabukhonyi Primary School

location
Chwele (in Sirisia)
year first funded
2004
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 402,600
estimate
Ksh 590,000

Lukhuna Primary School

location
Chwele (in Sirisia)
year first funded
2006
action
Construction O1 Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom At Wall Plate Land Has Not Been Bought
total cost
Ksh 402,272
estimate
Ksh 300,000

Namunyu Primary School

location
Sirisia (in Sirisia)
year first funded
2006
action
4 Classrooms
output
4 Classrooms
implementation status
Plastering, Flooring, Painting, Windows And Door Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,200,000

Bukokholo Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms Roofed, But Not Plastered.
total cost
Ksh 400,000
estimate
Ksh 600,000

Kasosi Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
2 Classrooms & Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
1 Acre Bought , 2 Classroom Needs Flooring Painting Plastering Window Panes Roofing Adm Block On Going.
total cost
Ksh 400,000
estimate
Ksh 475,000

Kibeu Primary School

location
Malakisi (in Sirisia)
year first funded
2006
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed But Requires Final Finishing
total cost
Ksh 400,000
estimate
Ksh 800,000

Mabanga Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing Project
total cost
Ksh 400,000
estimate
Ksh 600,000

Menu Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Purchase 2Acres Of Land
output
Increased Enrolment/ Conducive Learning
implementation status
On Going
total cost
Ksh 400,000
estimate
Ksh 450,000

Milembe Primary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Purchase Of Land And Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Land Bought
total cost
Ksh 400,000
estimate
Ksh 400,000

Mwanda S Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
3 Classrooms
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 900,000

Nambuya Primary School

location
Malakisi (in Sirisia)
year first funded
2004
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use Not Painted
total cost
Ksh 400,000
estimate
Ksh 600,000

Sikata Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Constructed Requires Painting Flooring Shutters, Plastering And Veranda. 4 Are Roofed 5 More Classroom Walling Plate High.
total cost
Ksh 400,000
estimate
Ksh 600,000

Tamlega Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
Construction of Of Adm. Block
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 500,000

Wabukhonyi S Primary School

location
Chwele (in Sirisia)
year first funded
2006
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Construction At The Lintel
total cost
Ksh 400,000
estimate
Ksh 100,000

Wamono Primary School

location
Lwandanyi (in Sirisia)
year first funded
2006
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Needs Plastering And Painting
total cost
Ksh 400,000
estimate
Ksh 400,000

Kikai Sec

location
Namwela (in Sirisia)
year first funded
2005
action
Construction Of A Dormitory
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 900,000

Lurare Dispensary

location
Malakisi (in Sirisia)
year first funded
2007
action
Construction Of Health Centre
output
Closer Medical Services
implementation status
Roofed But Not Plastered
total cost
Ksh 400,000
estimate
Ksh 800,000

Nalondo Tank Pipes

location
Luuya (in Sirisia)
year first funded
2007
action
Wells Construction And Renovation
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 400,000

Marobo Sec

location
Luuya (in Sirisia)
year first funded
2004
action
Wiring
output
Lighting
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 400,000

Sikulu Dispensary

location
Chwele (in Sirisia)
year first funded
2006
action
Wiring Nurses Houses &Paying Kplc
output
Lighting
implementation status
Wired
total cost
Ksh 398,747
estimate
Ksh 400,000

Nalondo Secondary School

location
Sirare (in Sirisia)
year first funded
2006
action
Computer Installation
output
Computer Learning
implementation status
3 Classroom Completed, Renovation Of 8 Classroom Done. Dormitory Plastering Painting.
total cost
Ksh 389,000
estimate
Ksh 389,000

Chongoyi Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
Construction Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed But Not Plastered
total cost
Ksh 385,000
estimate
Ksh 585,000

Mayekwe primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Renovation And Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete But Requires Final Finishing
total cost
Ksh 380,000
estimate
Ksh 450,000

Nalondo Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
Wiring & Renovation
output
Lighting
implementation status
Wiring On Going
total cost
Ksh 375,107
estimate
Ksh 400,000

Katomei Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 375,000
estimate
Ksh 900,000

Baraki Primary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Completed
total cost
Ksh 355,450
estimate
Ksh 655,450

Lwandanyi Ecd St AquinaSecondary Schoold Primary School

location
Lwandanyi (in Sirisia)
year first funded
2007
action
Renovation And Construction Of A Class
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 650,000

Lukaala Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 300,000

Chebukaka Boys Primary School

location
Mukuyuni (in Sirisia)
year first funded
2004
action
2 Classrooms Construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Sikusi Secondary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Wiring And Power Connected
total cost
Ksh 350,000
estimate
Ksh 450,000

Nasaka Dispensary

location
Luuya (in Sirisia)
year first funded
2008
action
Buying Land
output
Closer Medical Services
implementation status
To Be Done
total cost
Ksh 350,000
estimate
Ksh 100,000

Lukhome Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2007
action
1 Classroom, Plastering, Flooring &Painting
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed
total cost
Ksh 350,000
estimate
Ksh 500,000

Sitabicha Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 450,000

Sirare Primary School

location
Sirare (in Sirisia)
year first funded
2006
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Land Bought, 2 Classrooms Being Constructed.
total cost
Ksh 350,000
estimate
Ksh 650,000

Musieba Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
2 Classrooms & Administration Block
output
2 Classrooms & Administration Block
implementation status
On-Going
total cost
Ksh 350,000
estimate
Ksh 6,000,000

Lwandanyi Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Construction Of Adm. Block
output
Conducive Learning Environment For Teachers And Students
implementation status
Roofed But Plastering Not Complete
total cost
Ksh 350,000
estimate
Ksh 350,000

Sirare Ngalasia Dispensary

location
Sirare (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Wiring Ongoing
total cost
Ksh 330,000
estimate
Ksh 400,000

Lwakhakha Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Construction Of 1 Classrooms
output
Increased Enrolment ./Conducive Learning Environment
implementation status
Complete But Needs Final Finishing.
total cost
Ksh 325,000
estimate
Ksh 325,000

Siumbwa Cattle Dip

location
North Bukusu (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete In Use
implementation status
in use
total cost
Ksh 320,000
estimate
Ksh 85,000

Chebukaka Girls primary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Construction Of 2 Classrooms & Installation Of Power
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed , Plastered Floored
total cost
Ksh 310,900
estimate
Ksh 310,900

Bwake Sec

location
Luuya (in Sirisia)
year first funded
2006
action
Wiring Of Adm Block & Paying Kplc
output
Lighting
implementation status
Wiring Done But No Power-Ongoing
total cost
Ksh 306,747
estimate
Ksh 350,000

Bukiabi Primary School

location
Lwandanyi (in Sirisia)
year first funded
2004
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed, Not Plastered, Not Floored, Not Painted
total cost
Ksh 300,000
estimate
Ksh 350,000

Yabeko Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
Wiring
output
Provision Of Light For Easy Study For Students
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 200,000

Sikata Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Nalondo Secondary School

location
Sirare (in Sirisia)
year first funded
2004
action
Wiring And Installation Of Power
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Lwandanyi Sec

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 300,000
estimate
Ksh 400,000

Luuya Girls Sec

location
Luuya (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Ongoing Project
total cost
Ksh 300,000
estimate
Ksh 400,000

Lukhome Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2007
action
Wiring 7 Classrooms
output
Lighting
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Busakala Secondary School

location
Chwele (in Sirisia)
year first funded
2004
action
Wiring Of Class And Dormitory
output
Lighting
implementation status
Wiring Has Been Done
total cost
Ksh 300,000
estimate
Ksh 400,000

Teremi Secondary School

location
Chwele (in Sirisia)
year first funded
2007
action
Construction Of A Classroom
output
Provision Of Conducive Learning Environment
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 300,000

Sikulu Secondary School

location
Chwele (in Sirisia)
year first funded
2006
action
1 Classroom Construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed
total cost
Ksh 300,000
estimate
Ksh 300,000

Chwele Girls Secondary School

location
Namwela (in Sirisia)
year first funded
2007
action
Construction Of A One Classroom
output
-
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 300,000

Nasaka Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms Require Window And Door, Started Administration Block 2Brick Wall.
total cost
Ksh 300,000
estimate
Ksh 600,000

Namilama D Primary School

location
North Bukusu (in Sirisia)
year first funded
2005
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of 4 Classroom &2 Office.
total cost
Ksh 300,000
estimate
Ksh 3,000,000

Malakisi A Primary School

location
Malakisi (in Sirisia)
year first funded
2006
action
Renovation Of Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Kolani Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete But Requires Plastering, Flooring& Painting
total cost
Ksh 300,000
estimate
Ksh 450,000

Chenjeni S Primary School

location
Sirisia (in Sirisia)
year first funded
2004
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Completed But Require Plastering, Window Pane, Painting,
total cost
Ksh 300,000
estimate
Ksh 400,000

Chekulo Fym Primary

location
Luuya (in Sirisia)
year first funded
2005
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classroom Requires Plastering& Shutters, Painting
total cost
Ksh 300,000
estimate
Ksh 600,000

Sikulu Primary School

location
Chwele (in Sirisia)
year first funded
2004
action
Construction Of 1 Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
1 Classroom Roofed Administration Block At Slab Level
total cost
Ksh 290,725
estimate
Ksh 350,000

Kabuchai Water Project

location
Kabuchai (in Sirisia)
year first funded
2004
action
Spring Well Protection
output
Closer Access To Clean Water
implementation status
Complete And In Use
total cost
Ksh 290,000
estimate
Ksh 290,000

Lukaala Cattle Dip

location
Sirisia (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete But Not In Use
implementation status
in use
total cost
Ksh 270,000
estimate
Ksh 27,000

Luuya Dispensary

location
Luuya (in Sirisia)
year first funded
2006
action
Wiring Of Adm. Block& Patients Reception Hall
output
Lighting
implementation status
Ongoing
total cost
Ksh 268,747
estimate
Ksh 4,000,000

Butonge Dispensary

location
Malakisi (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 268,747
estimate
Ksh 230,000

Bukokholo Dispensary

location
Malakisi (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 268,747
estimate
Ksh 230,000

Kibichori Primary School

location
Chwele (in Sirisia)
year first funded
2004
action
Construction Of 4 Classrooms And Store
output
Increased Enrolment /Conducive Learning Environment
implementation status
Completed
total cost
Ksh 265,000
estimate
Ksh 300,000

Korosiandet Cattle Dip

location
Lwandanyi (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete And In Use
implementation status
more funds required
total cost
Ksh 260,000
estimate
Ksh 260,000

Bukokholo Cattle Dip

location
Malakisi (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete
implementation status
in use
total cost
Ksh 260,000
estimate
Ksh 260,000

Bisunu Cattle Dip

location
Sirisia (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete But Not In Use
implementation status
in use
total cost
Ksh 260,000
estimate
Ksh 260,000

Mukhweya Primary School

location
Kabuchai (in Sirisia)
year first funded
2003
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of Adm Office Done.
total cost
Ksh 260,000
estimate
Ksh 260,000

Kimalewa Primary School

location
Mukuyuni (in Sirisia)
year first funded
2005
action
8 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed One Classroom Floored And Plastered
total cost
Ksh 255,450
estimate
Ksh 350,000

Toloso Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Renovation
output
Increased Enrolment/ Conducive Learning
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 350,000

Sirisia Mal Fym Primary School

location
Sirisia (in Sirisia)
year first funded
2006
action
Construction of Of A Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
On Ring Beam Level
total cost
Ksh 250,000
estimate
Ksh 560,000

Ndakaru Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
1 Classroom Construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed But Not Plastered
total cost
Ksh 250,000
estimate
Ksh 350,000

Nangili Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Roofed Require Plastering ,Shutters.
total cost
Ksh 250,000
estimate
Ksh 600,000

Namosi Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classrooms Require Final Finishing.
total cost
Ksh 250,000
estimate
Ksh 600,000

Namawanga S Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
At Lintel Level
total cost
Ksh 250,000
estimate
Ksh 600,000

Masaba Primary School

location
Namwela (in Sirisia)
year first funded
2006
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
In The Process Of Plastering And Roofing, Fitting Indoor And Windows
total cost
Ksh 250,000
estimate
Ksh 250,000

Malinda F Primary School

location
Namwela (in Sirisia)
year first funded
2006
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
To Be Plastered, Roofing Done
total cost
Ksh 250,000
estimate
Ksh 600,000

Kulisiru Primary School

location
Sirisia (in Sirisia)
year first funded
2006
action
2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 300,000

Kabuchai S Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classroom Require Painting, And Plastering
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Chekulo Fym School

location
Luuya (in Sirisia)
year first funded
2006
action
Construction Of 3 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing Project
total cost
Ksh 250,000
estimate
Ksh 450,000

Chebukwa Deb Primary School

location
Kabuchai (in Sirisia)
year first funded
2006
action
Construction Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Constructed 4 Classrooms, Roofed. Need Final Finishing,
total cost
Ksh 250,000
estimate
Ksh 250,000

Bwake Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classes Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 550,000

Butonge Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
Construction Of 1 Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed, Windows Fitted, And Plastered
total cost
Ksh 250,000
estimate
Ksh 300,000

Bisunu Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed , Windows Fitted, But Not Plastered
total cost
Ksh 250,000
estimate
Ksh 300,000

Binyenya S Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Renovation And Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Needs Plastering Flooring Of 2 Classroom, Painting
total cost
Ksh 250,000
estimate
Ksh 300,000

Sirisia Youth Politechnic

location
Sirisia (in Sirisia)
year first funded
2008
action
Wiring& Paying Kplc
output
Lighting
implementation status
To Be Started
total cost
Ksh 238,747
estimate
Ksh 200,000

Lukhome Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
Wiring Of 11 Classrooms
output
-
implementation status
Wiring Done
total cost
Ksh 238,747
estimate
Ksh 300,000

Namilama Secondary School

location
North Bukusu (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
To Be Done
total cost
Ksh 238,747
estimate
Ksh 300,000

Township Primary School

location
Sirisia (in Sirisia)
year first funded
2008
action
Wiring
output
Lighting
implementation status
To Be Started
total cost
Ksh 238,747
estimate
Ksh 200,000

Rehabilitation Of Spring Wells

location
Namwela (in Sirisia)
year first funded
2003
action
Renovation
output
Closer Access To Water
implementation status
Complete
total cost
Ksh 237,000
estimate
Ksh 237,000

Sirisia Cattle Dip

location
Sirisia (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete In Use
implementation status
more funds required
total cost
Ksh 226,360
estimate
Ksh 120,000

Mabanga Girls Sec

location
Luuya (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 226,000
estimate
Ksh 350,000

Kikai Cattle Dip

location
Namwela (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete And In Use
implementation status
in use
total cost
Ksh 225,902
estimate
Ksh 225,902

Sichei Secondary School

location
North Bukusu (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 222,221
estimate
Ksh 150,000

Sikulu Secondary School

location
Chwele (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 222,188
estimate
Ksh 150,000

Nangwe Secondary School

location
Sirare (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 222,188
estimate
Ksh 150,000

Busakala Primary School

location
Chwele (in Sirisia)
year first funded
2006
action
Construction Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Lwandanyi Primary School

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Renovation And Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Lukhome Dispensary

location
Mukuyuni (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Kimalewa Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 200,000
estimate
Ksh 300,000

Kikai Secondary School

location
Namwela (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Karibuni Gsec

location
Sirisia (in Sirisia)
year first funded
2005
action
Wiring
output
-
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 0

Kaptanai Secondary School

location
Namwela (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 200,000
estimate
Ksh 300,000

Chwele Girls Sec

location
Namwela (in Sirisia)
year first funded
2007
action
Wiring &Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 200,000
estimate
Ksh 400,000

Chwele Friends Dispensary

location
Chwele (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Not Completed ?Lighting On
total cost
Ksh 200,000
estimate
Ksh 200,000

Chebukaka Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 200,000
estimate
Ksh 300,000

Cdf Office

location
Chwele (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Wiring Has Been Odne
total cost
Ksh 200,000
estimate
Ksh 300,000

Busakala Primary School

location
Chwele (in Sirisia)
year first funded
2005
action
Wiring 11 Classrooms
output
Lighting
implementation status
Wiring
total cost
Ksh 200,000
estimate
Ksh 200,000

Binyenya Secondary School

location
Namwela (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Sirisia Secondary School

location
Sirisia (in Sirisia)
year first funded
2007
action
Construction Of A Classroom
output
Conducive Learning Environment
implementation status
Roofed But Not Plastered
total cost
Ksh 200,000
estimate
Ksh 300,000

Munyanganyi Fym

location
Namwela (in Sirisia)
year first funded
2007
action
Construction Of A Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed But Not Plastered, Floored Windows Not Fitted
total cost
Ksh 200,000
estimate
Ksh 300,000

Wanjoya Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
Construction of Of 2 Classrooms
output
Increased Enrolment/ Conducive Learning
implementation status
Plastering And Painting Needed
total cost
Ksh 200,000
estimate
Ksh 400,000

Teremi F primary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 350,000

Sichei F primary School

location
Chwele (in Sirisia)
year first funded
2004
action
Construction of Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed
total cost
Ksh 200,000
estimate
Ksh 450,000

Ngalasia Primary School

location
Luuya (in Sirisia)
year first funded
2006
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Roofed And Plastered, Shuttered, Floored
total cost
Ksh 200,000
estimate
Ksh 350,000

Namwesi Primary School

location
Malakisi (in Sirisia)
year first funded
2006
action
1 Classroom, Plastering And Painting
output
Increased Enrolment /Conducive Learning Environment
implementation status
Classroom Roofed Windows Fitted .
total cost
Ksh 200,000
estimate
Ksh 450,000

Nalondo Primary School

location
Sirare (in Sirisia)
year first funded
2005
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
Renovation Of 4 Classrooms Done.
total cost
Ksh 200,000
estimate
Ksh 200,000

Mutonyi Primary School

location
Namwela (in Sirisia)
year first funded
2006
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 600,000

Madisi Fym Primary School

location
Chwele (in Sirisia)
year first funded
2006
action
Construction Of One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Roofed And But Needs Final Finishin
total cost
Ksh 200,000
estimate
Ksh 300,000

Kisiwa R Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 356,000

Khachonge R Primary School

location
North Bukusu (in Sirisia)
year first funded
2006
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classrooms Completed By Kessp
total cost
Ksh 200,000
estimate
Ksh 650,000

Chenjeni F Primary School

location
Chwele (in Sirisia)
year first funded
2006
action
Construction Of 4 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Chekulo Baptist Primary School

location
Luuya (in Sirisia)
year first funded
2005
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
3 Classrooms Half Way Roofed With Old Iron Sheets. Requires Plastering, Flooring, Shutters, Walling Of Higher Side(Cape) Painting .Bought 1 Acre Of Land
total cost
Ksh 200,000
estimate
Ksh 300,000

Chebunyinyi Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
Construction Of 2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Classroom Contraction And Roofed But Require Final Finishing
total cost
Ksh 200,000
estimate
Ksh 300,000

Chebukutumi Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
3 Classroom construction
output
Increased Enrolment /Conducive Learning Environment
implementation status
Needs To Be Fitted With Windowpanes, Door& Plastering Flooring
total cost
Ksh 200,000
estimate
Ksh 550,000

Madisi Secondary School

location
Chwele (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Wired
total cost
Ksh 200,000
estimate
Ksh 0

Tamlega Secondary School

location
Malakisi (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Wiring In Process
total cost
Ksh 200,000
estimate
Ksh 300,000

Sirisia Su-District

location
Sirisia (in Sirisia)
year first funded
2005
action
Wiring
output
Provision Of Light For Easy Study For Students
implementation status
Wiring Complete
total cost
Ksh 200,000
estimate
Ksh 200,000

Sikusi Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Sibanga Primary School

location
Sirisia (in Sirisia)
year first funded
2005
action
Wiring
output
Provision Of Light For Easy Study For Students
implementation status
Wiring Done And Power Connected
total cost
Ksh 200,000
estimate
Ksh 300,000

Nalondo Health Centre

location
Luuya (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Mukhweya Primary School

location
Kabuchai (in Sirisia)
year first funded
2005
action
Wiring
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 300,000

Mabanga Primary School

location
Luuya (in Sirisia)
year first funded
2007
action
Wiring &Paying Kplc
output
Lighting
implementation status
Wiring Done
total cost
Ksh 198,747
estimate
Ksh 300,000

Khalaba Factory

location
Kabuchai (in Sirisia)
year first funded
2005
action
Power
output
Lighting
implementation status
Wiring Done
total cost
Ksh 190,000
estimate
Ksh 250,000

Sitabicha Cattle Dip

location
Malakisi (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete In Use
implementation status
in use
total cost
Ksh 190,000
estimate
Ksh 120,000

Ndakaru Cattle Dip

location
Sirisia (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete In Us
implementation status
in use
total cost
Ksh 190,000
estimate
Ksh 120,000

Nambuya Cattle Dip

location
Malakisi (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete And In Use
implementation status
more funds
total cost
Ksh 190,000
estimate
Ksh 120,000

Namangofulo Cattle Dip

location
Sirisia (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete But In Use
implementation status
plastering
total cost
Ksh 190,000
estimate
Ksh 120,000

Kabrwet Cattle Dip

location
Lwandanyi (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Renovation Complete But Not In Use
implementation status
in use
total cost
Ksh 190,000
estimate
Ksh 190,000

Sirisia Polytechnic

location
Sirisia (in Sirisia)
year first funded
2008
action
Flooring, Plastering And Shutters Of 2 Classrooms
output
Self Employment
implementation status
Construction Ongoing
total cost
Ksh 181,800
estimate
Ksh 1,000,000

Namwela Polytechnic

location
Namwela (in Sirisia)
year first funded
2008
action
Buying Land
output
Create Employment
implementation status
Money Has To Be Funded
total cost
Ksh 181,800
estimate
Ksh 700,000

Malakisi Polytechnic

location
Malakisi (in Sirisia)
year first funded
2008
action
Construction Of A Classroom
output
Create Employment
implementation status
Construction Ongoing
total cost
Ksh 181,800
estimate
Ksh 1,000,000

Chwele Polytechnic

location
Chwele (in Sirisia)
year first funded
2008
action
Plastering, Flooring And Shuttering
output
Create Employment
implementation status
1 Completed
total cost
Ksh 181,800
estimate
Ksh 500,000

Malakisi Ack Sec

location
Malakisi (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 166,833
estimate
Ksh 0

Sibumba Factory

location
Namwela (in Sirisia)
year first funded
2005
action
2 Classrooms
output
Lighting/Factory Use
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 160,000

Namaondo Primary School

location
Chwele (in Sirisia)
year first funded
2008
action
Wiring
output
Lighting
implementation status
Completed
total cost
Ksh 158,747
estimate
Ksh 120,000

Sirare Cattle Dip

location
Sirare (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Renovation Complete In Use
implementation status
more funds required
total cost
Ksh 156,360
estimate
Ksh 85,000

Mukuyuni Cattle Dip

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete And In Use
implementation status
KESP/CDF
total cost
Ksh 156,360
estimate
Ksh 85,000

Makhonge Primary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
2 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
Slab Level
total cost
Ksh 155,450
estimate
Ksh 600,000

Nanjikobe Cattle Dip

location
Namwela (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete And In Use
implementation status
final
total cost
Ksh 155,000
estimate
Ksh 85,000

Butunde Cattle Dip

location
Namwela (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete But Not In Use
implementation status
more funds required CDF
total cost
Ksh 155,000
estimate
Ksh 155,000

Chekulo Cattle Dip

location
Luuya (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Renovation Complete
implementation status
in use improvement
total cost
Ksh 155,000
estimate
Ksh 155,000

Khalaba

location
Kabuchai (in Sirisia)
year first funded
2004
action
Improved Livestock Production
output
Complete
implementation status
not known
total cost
Ksh 155,000
estimate
Ksh 155,000

Kimalewa Cattle Dip

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Increased Livestock Production
output
Complete And In Use
implementation status
more funds required
total cost
Ksh 155,000
estimate
Ksh 155,000

Menu Cattle Dip

location
Namwela (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete But Not In Use
implementation status
in use
total cost
Ksh 155,000
estimate
Ksh 85,000

Wapuka Cattle Dip

location
Namwela (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete But Not In Use
implementation status
in use
total cost
Ksh 155,000
estimate
Ksh 85,000

Namutokholo Primary School

location
Namwela (in Sirisia)
year first funded
2005
action
4 Classrooms
output
Increased Enrolment/ Conducive Learning
implementation status
Renovations Of 3 Classrooms Done.
total cost
Ksh 150,000
estimate
Ksh 1,200,000

Lwandanyi Primary School

location
Lwandanyi (in Sirisia)
year first funded
2006
action
Renovation
output
Increased Enrolment /Conducive Learning Environment
implementation status
On Going
total cost
Ksh 150,000
estimate
Ksh 250,000

Bukokholo Primary School

location
Malakisi (in Sirisia)
year first funded
2005
action
Wiring
output
Lighting
implementation status
Wiring Done
total cost
Ksh 150,000
estimate
Ksh 300,000

Wapukha Primary School

location
Namwela (in Sirisia)
year first funded
2006
action
1 Acres Land
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 200,000

Luuya Primary School

location
Luuya (in Sirisia)
year first funded
2006
action
Construction Of 8 Classrooms
output
Increased Enrolment /Conducive Learning Environment
implementation status
2 Offices And 8 Classrooms. Constructed But Require Roofing& , Plastering.
total cost
Ksh 150,000
estimate
Ksh 450,000

Kaptanai S Primary School

location
Namwela (in Sirisia)
year first funded
2007
action
Plastering And Flooring Of 2 Classrooms
output
Increased Enrolment
implementation status
Completion Of 2 Classrooms, Installed
total cost
Ksh 150,000
estimate
Ksh 350,000

Kasiamo Primary School

location
Sirisia (in Sirisia)
year first funded
2006
action
4 Classrooms
output
4 Classrooms
implementation status
Roofed Not Plastered
total cost
Ksh 150,000
estimate
Ksh 450,000

Sikusi Primary School

location
Kabuchai (in Sirisia)
year first funded
2006
action
Construction of Of One Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Ongoing
total cost
Ksh 150,000
estimate
Ksh 350,000

Rehabilitation Of Boreholes

location
Namwela (in Sirisia)
year first funded
2007
action
Renovation
output
Access To Water
implementation status
Complete And In Use
total cost
Ksh 147,000
estimate
Ksh 147,000

Korosiandet Dispensary

location
Lwandany (in Sirisia)
year first funded
2008
action
Wiring
output
Lighting
implementation status
To Be Started
total cost
Ksh 146,747
estimate
Ksh 120,000

Musokho Secondary School

location
Kabuchai (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 138,888
estimate
Ksh 150,000

Bishop Wabukala Malakisi Ack Secondary School

location
Malakisi (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Books Purchased For First Allocation
total cost
Ksh 138,888
estimate
Ksh 150,000

Kabuchai Secondary School

location
Kabuchai (in Sirisia)
year first funded
2007
action
Purchase Books
output
Improve Quality Of Education
implementation status
Books Purchased For First Allocation
total cost
Ksh 138,888
estimate
Ksh 150,000

Chekulo Secondary School

location
Luuya (in Sirisia)
year first funded
2008
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 138,855
estimate
Ksh 10,000

Chwele Boys Primary School

location
Chwele (in Sirisia)
year first funded
2008
action
Wiring &Paying Of Kplc
output
Lighting
implementation status
Ongoing
total cost
Ksh 138,747
estimate
Ksh 300,000

Malakisi Health Centre

location
Malakisi (in Sirisia)
year first funded
2008
action
Wiring The Theatre
output
Lighting
implementation status
Complete Not In Use
total cost
Ksh 138,747
estimate
Ksh 200,000

Namilama Primary School

location
North Bukusu (in Sirisia)
year first funded
2008
action
Wiring In Classroom
output
Lighting
implementation status
To Be Done
total cost
Ksh 138,747
estimate
Ksh 200,000

Ngalasia Dispensary

location
Sirare (in Sirisia)
year first funded
2008
action
Wiring Adm Block
output
Lighting
implementation status
To Be Done
total cost
Ksh 138,747
estimate
Ksh 150,000

Sitila Primary School

location
Sirare (in Sirisia)
year first funded
2008
action
Wiring Of 2 Classrooms
output
Lighting
implementation status
To Be Started
total cost
Ksh 138,747
estimate
Ksh 150,000

Baraki Primary School

location
Mukuyuni (in Sirisia)
year first funded
2008
action
Payment Of Kplc & Wiring
output
Lighting
implementation status
To Be Started
total cost
Ksh 138,747
estimate
Ksh 100,000

Chebukaka G Primary School

location
Mukuyuni (in Sirisia)
year first funded
2008
action
Wiring Of 4 Classrooms & Payment Of Kplc
output
Lighting
implementation status
Wiring Done
total cost
Ksh 138,747
estimate
Ksh 100,000

Khachonge G High

location
North Bukusu (in Sirisia)
year first funded
2008
action
Installation Of Power &Wiring Of Power House
output
Lighting
implementation status
Wiring To Be Done
total cost
Ksh 138,747
estimate
Ksh 200,000

Kimalewa Health Centre

location
Mukuyuni (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 130,000
estimate
Ksh 130,000

Dcs Residence

location
Chwele (in Sirisia)
year first funded
2007
action
n/a
output
Lighting
implementation status
Completed
total cost
Ksh 130,000
estimate
Ksh 130,000

Kabuchai Health Centre

location
Kabuchai (in Sirisia)
year first funded
2007
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 130,000
estimate
Ksh 130,000

Chwele Girls Primary School

location
Namwela (in Sirisia)
year first funded
2007
action
Electricity
output
Lighting
implementation status
Complete
total cost
Ksh 126,000
estimate
Ksh 126,000

Namwela Location

location
Namwela (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Lwandanyi Location

location
Lwandanyi (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Malakisi Location

location
Malakisi (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Chwele Location

location
Chwele (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Mukuyuni Location

location
Mukuyuni (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Luuya Location

location
Luuya (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

North Bukusu Location

location
North Bukusu (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Sirare Location

location
Sirare (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Kabuchai Location

location
Kabuchai (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Sirisia Location

location
Sirisia (in Sirisia)
year first funded
2008
action
A Ball & Game Uniforms Trophies & Shields
output
Nurturing Talents
implementation status
Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
total cost
Ksh 125,454
estimate
Ksh 50,000

Sikusi Cattle Dip

location
Kabuchai (in Sirisia)
year first funded
2005
action
Improved Livestock Production
output
Complete And In Use
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Luucho

location
Kabuchai (in Sirisia)
year first funded
2005
action
Improved Livestock Production
output
Complete And In Use
implementation status
not known
total cost
Ksh 120,000
estimate
Ksh 85,000

Mabanga Cattle Dip

location
Luuya (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Renovation Complete And In Use
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Makhonge Cattle Dip

location
Chwele (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Not Operating
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Maliki Cattle Dip

location
Chwele (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Not Operating
implementation status
KESSA/CDF
total cost
Ksh 120,000
estimate
Ksh 85,000

Milani Cattle Dip

location
Chwele (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Operating
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Mukhweya

location
Kabuchai (in Sirisia)
year first funded
2005
action
Improved Livestock Production
output
Not In Use
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Muyayi Cattle Dip

location
Kabuchai (in Sirisia)
year first funded
2005
action
Improved Livestock Production
output
Complete
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Nalondocattle Dip

location
North Bukusu (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete And In Use
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Namukongo Cattle Dip

location
Luuya (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete And In Use
implementation status
more funds required
total cost
Ksh 120,000
estimate
Ksh 85,000

Ndareti Cattle Dip

location
Mukuyuni (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Operating
implementation status
more funds required
total cost
Ksh 120,000
estimate
Ksh 85,000

Sanandiki Cattle Dip

location
Chwele (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete In Use
implementation status
in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Sikulu Cattle Dip

location
Chwele (in Sirisia)
year first funded
2005
action
Increased Livestock Production
output
Complete, In Using
implementation status
PTA/CDF in use
total cost
Ksh 120,000
estimate
Ksh 85,000

Nalondo Water Pump

location
Kabuchai (in Sirisia)
year first funded
2006
action
Spring Protection
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 113,000
estimate
Ksh 113,000

Khachonge Water Pump

location
North Bukusu (in Sirisia)
year first funded
2006
action
Installation Of Sub-Massive Pump
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 113,000
estimate
Ksh 113,000

Sango Pefa Primary School

location
Mukuyuni (in Sirisia)
year first funded
2008
action
Construction Of Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
Land Purchased
total cost
Ksh 110,000
estimate
Ksh 300,000

Namilama Secondary School

location
North Bukusu (in Sirisia)
year first funded
2008
action
Wiring
output
Lighting
implementation status
To Be Done
total cost
Ksh 100,000
estimate
Ksh 200,000

Teremi Secondary School

location
Mukuyuni (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 100,000

Namwela Secondary School

location
Namwela (in Sirisia)
year first funded
2008
action
Wiring Of 4 Classrooms
output
Lighting
implementation status
To Be Done
total cost
Ksh 100,000
estimate
Ksh 200,000

Matibo Friends

location
Chwele (in Sirisia)
year first funded
2008
action
1 Classroom
output
Good Performance For Students
implementation status
Bought Land
total cost
Ksh 100,000
estimate
Ksh 400,000

Lutaso Pefe Primary School

location
Sirisia (in Sirisia)
year first funded
2007
action
Renovation
output
Conducive Learning Environment.
implementation status
Plastering, Flooring
total cost
Ksh 100,000
estimate
Ksh 300,000

Sanandiki Primary School

location
Chwele (in Sirisia)
year first funded
2005
action
Construction Of 1 Classroom
output
Increased Enrolment /Conducive Learning Environment
implementation status
In Progress
total cost
Ksh 100,000
estimate
Ksh 680,000

Sibanga S Primary School

location
Sirisia (in Sirisia)
year first funded
2007
action
Construction of Of A Classroom
output
Improve Learning Enrolment
implementation status
Plastering, Flooring, Window Pane And Doors
total cost
Ksh 100,000
estimate
Ksh 400,000

St Anthony Sirisia Secondary School

location
Sirisia (in Sirisia)
year first funded
2008
action
Flooring,Plastering And Painting
output
Provision Of Conducive Learning Environment
implementation status
Complete And In Use
total cost
Ksh 100,000
estimate
Ksh 300,000

Bisunu Secondary School

location
Sirisia (in Sirisia)
year first funded
2006
action
Lighting
output
Provision Of Light For Efficient Study By Students.
implementation status
Wiring Done But No Power
total cost
Ksh 100,000
estimate
Ksh 100,000

Malakisi Muslim Primary School

location
Malakisi (in Sirisia)
year first funded
2006
action
Wiring
output
Lighting
implementation status
Wiring To Be Done
total cost
Ksh 100,000
estimate
Ksh 200,000

Namangofulo Sec

location
Sirisia (in Sirisia)
year first funded
2006
action
Wiring
output
Increased Enrolment /Conducive Learning Environment
implementation status
Wiring Done
total cost
Ksh 100,000
estimate
Ksh 200,000

Spring And Wells Chwele Nursery Borehole, Maliki And Samit

location
Chwele (in Sirisia)
year first funded
2003
action
Renovation And Construction Of Springs And Wells
output
Access To Water Services
implementation status
Complete And In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Spring And Wells

location
Mukuyuni (in Sirisia)
year first funded
2003
action
Renovation And Construction Of Springs And Wells
output
Access To Water Services
implementation status
Complete And In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Rehabilitation Of Spring Wells

location
Sirare (in Sirisia)
year first funded
2003
action
Wells Construction
output
Closer Water Services
implementation status
Complete
total cost
Ksh 90,000
estimate
Ksh 90,000

Rehabilitation Of Spring Wells

location
Luuya (in Sirisia)
year first funded
2003
action
Rehabilitation Of Wells
output
Close Access To Water
implementation status
Complete In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Rehabilitation Of Spring Wells

location
North Bukusu (in Sirisia)
year first funded
2003
action
Rehabilitation
output
Closer Access To Water
implementation status
Complete In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Rehabilitation Of Spring Wells

location
Malakisi (in Sirisia)
year first funded
2003
action
Well Construction
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Rehabilitation Of Spring Wells

location
Lwandanyi (in Sirisia)
year first funded
2003
action
Rehabilitation Of Wells
output
Closer Access To Water
implementation status
Complete And In Use
total cost
Ksh 90,000
estimate
Ksh 90,000

Kiboochi

location
Luuya (in Sirisia)
year first funded
2008
action
Wiring Of Adm Block & 1 Classroom
output
Lighting
implementation status
To Be Started
total cost
Ksh 88,747
estimate
Ksh 100,000

Sirisia Constituency Admin Police Sports

location
Sirisia (in Sirisia)
year first funded
2009
action
Purchase Of Uniforms And Equipment
output
-
implementation status
New
total cost
Ksh 80,000
estimate
Ksh 0

Saratuki Cattle Dip

location
Luuya (in Sirisia)
year first funded
2006
action
Increased Livestock Production
output
Renovation Complete And In Use
implementation status
need funds
total cost
Ksh 70,000
estimate
Ksh 85,000

Binyenye Secondary School

location
Namwela (in Sirisia)
year first funded
2008
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 55,555
estimate
Ksh 100,000

Sibunba Secondary School

location
Namwela (in Sirisia)
year first funded
2008
action
Purchase Books
output
Improve Quality Of Education
implementation status
Text Books Purchased
total cost
Ksh 55,555
estimate
Ksh 100,000

Malinda S Primary School

location
Sirisia (in Sirisia)
year first funded
2008
action
Construction Of Ecd Classroom
output
Increased Enrolment
implementation status
Ongoing
total cost
Ksh 54,500
estimate
Ksh 300,000

Luuya Primary School

location
Luuya (in Sirisia)
year first funded
2008
action
Wiring Of 1 Classroom
output
Lighting
implementation status
Ongoing
total cost
Ksh 50,000
estimate
Ksh 0

Masibo Biketi, Chetambe, Cheleni,Mukubale, Mutuba Bomboa,Lukhome

location
Mukuyuni (in Sirisia)
year first funded
2004
action
Renovation And Construction Of Springs And Wells
output
Access To Water Services
implementation status
Complete And In Use
total cost
Ksh 45,000
estimate
Ksh 45,000

Khachonge Dispensary

location
North Bukusu (in Sirisia)
year first funded
2009
action
n/a
output
Lighting
implementation status
in use
total cost
Ksh 38,747
estimate
Ksh 0