The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Sirisia Water Tank
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Water Tank
- output
- Closer Access To Water
- implementation status
- Tank Complete But Pipes Being Laid
- total cost
- Ksh 4,200,000
- estimate
- Ksh 5,000,000
Kisiwa Politechnic
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of Adm Block & Tuition Block
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 4,038,747
- estimate
- Ksh 400,000
Lurende/Khachonge Bridge
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improve On Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 3,682,000
- estimate
- Ksh 1,182,000
Marobo/Luuya
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- Complete And In Use .
- total cost
- Ksh 3,000,000
- estimate
- Ksh 3,000,000
Old Kibichori Water
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of Tank
- output
- Closer Water Access
- implementation status
- Funds Reallocated To Nakayonjo Water Project
- total cost
- Ksh 3,000,000
- estimate
- Ksh 500,000
Kisiwa Y/Polytechnic
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2003
- action
- Equipments/Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovated Currently Technical Equipment Bought
- total cost
- Ksh 2,681,800
- estimate
- Ksh 0
Kibichori- Sichei Road Gravelling
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- Road Grading, Gravelling, Muraming And Putting Culverts
- output
- Easy Access By Farmers And General Travelling
- implementation status
- Completed
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Kikai-Binyenya Bridge
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of Bridge
- output
- Improve On Infrastructure
- implementation status
- Complete
- total cost
- Ksh 2,418,000
- estimate
- Ksh 2,418,000
Busakala Water Tank
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Tank Construction
- output
- Closer Access To Clean Water
- implementation status
- Completed
- total cost
- Ksh 2,270,000
- estimate
- Ksh 2,000,000
Nakayonjo Milembe Bridge
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- Completed
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Chebukutumi Dispensary
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of New Disp
- output
- Closer Medical Services
- implementation status
- On Going
- total cost
- Ksh 2,160,000
- estimate
- Ksh 2,000,000
Chwele Medical Training College
- location
-
Chwele
(in Sirisia)
- year first funded
- 2009
- action
- Fencing Of 30 Acres Of Land Purchased
- output
- -
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
River Mayayi Bridge
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of Bridge
- output
- Improve Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kaptanai Dispensary
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Construction
- output
- Closer Medical Services
- implementation status
- On-Going
- total cost
- Ksh 1,960,000
- estimate
- Ksh 0
Chwele Friends Dispensary
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Construction
- output
- Closer Medical Services
- implementation status
- Complete And In Use, Maternity Wing To Be Painted And Internal Fitting
- total cost
- Ksh 1,468,000
- estimate
- Ksh 2,500,000
Madisi Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of A Laboratory (Twin)
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, One Part Completed
- total cost
- Ksh 1,460,000
- estimate
- Ksh 1,500,000
Khachonge Girls
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of A Dining Hall And Roofing
- output
- Provision Of Conducive Environment For Good Performance
- implementation status
- 2 Acre Of Land Bought Roofed Adm Block.
- total cost
- Ksh 1,440,000
- estimate
- Ksh 1,500,000
Lwakhakha Dispensary
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Roofed, Shuttered, Plastered Not Floored And Painted
- total cost
- Ksh 1,410,000
- estimate
- Ksh 2,500,000
Bukokholo Dispensary
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of A Health Centre
- output
- Closer Medical Services
- implementation status
- Roofed, Plastered, Windows Fitted
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
Luuya Dispensary
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of Health Centre
- output
- Closer Medical Services
- implementation status
- Completed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,000,000
Lwandanyi Secondary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- Tuition Block/ 1 Classroom&Plastering,Flooring&Fixing Shutters
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
Namangogulo Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Dining Hall Ongoing
- total cost
- Ksh 1,390,000
- estimate
- Ksh 2,500,000
Bukokholo Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- Twin Dormitory & One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed Shuttered, Not Floored, Painted
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
Chwele Health Centre
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Maternity Wing Power House
- output
- Closer Medical Services
- implementation status
- Power Connected, Wiring Ongoing
- total cost
- Ksh 1,299,747
- estimate
- Ksh 1,500,000
Sikulu Dispensary
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Residential House And Dispensary Complete
- output
- Closer Medical Services
- implementation status
- Roofed
- total cost
- Ksh 1,273,600
- estimate
- Ksh 1,013,600
Kimalewa Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of A Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- At Wall Plate
- total cost
- Ksh 1,250,000
- estimate
- Ksh 2,000,000
Tamlega Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 1,190,000
- estimate
- Ksh 1,000,000
Khachonge Dispensary
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Roofing The Maternity Wing
- output
- Closer Medical Services
- implementation status
- On Going
- total cost
- Ksh 1,143,600
- estimate
- Ksh 2,500,000
Lurende Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 4 Classrooms Roofed With Old Iron Sheets, 8 Needs Steel Shutters 2 Classrooms Roofed ? Plastering, Flooring, Painting, Shutters
- total cost
- Ksh 1,104,500
- estimate
- Ksh 1,200,000
Kolani Dispensary
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Construction
- output
- Closer Medical Services
- implementation status
- Require Some Finishing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Chwele Health Centre
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Purchasing Of Shutters, Plastering And Flooring Of Maternity Wing
- output
- Closer Medical Services
- implementation status
- Roofed One Part Plastered And Roofed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
Chekulo Secondary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 4 Classrooms Complete In Use. Adm Block Foundation Laid -1.2M
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Nangwe Secondary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2006
- action
- 4 Classrooms& Buying Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 11/2 Ha Bought At 2 Classroom Complete One Classroom Roofed Used As Offices Requires Plastering, Window Panes, Painting,. Kitchen Needs Roofing, Plastering, Shutters And Veranda.
- total cost
- Ksh 1,094,545
- estimate
- Ksh 1,200,000
Kuywa Girls Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Admin Block&Renovation Of 7 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Almost To The Lintel
- total cost
- Ksh 1,086,266
- estimate
- Ksh 1,086,266
Sirare Yourth Polytechnich
- location
-
Sirare
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Self Employment
- implementation status
- Ongoing
- total cost
- Ksh 1,081,800
- estimate
- Ksh 600,000
Malakisi Health Centre
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of Maternity Wing
- output
- Closer Medical Services.
- implementation status
- To Be Painted And Doors Fitted
- total cost
- Ksh 1,074,570
- estimate
- Ksh 1,000,000
Namilama Secondary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2004
- action
- Dining Hall
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Generator Bought, 2 Classroom Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,500,000
Lwandanyi Dispensary
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Closer Medical Services
- implementation status
- Complete
- total cost
- Ksh 1,013,600
- estimate
- Ksh 900,000
Khachonge Girls Secondary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2009
- action
- Drilling And Construction Of Water Tank
- output
- Closer Access To Water
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Malakisi Piped Water
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of Water Tank
- output
- Closer Access To Clean Water
- implementation status
- More Pipes Laid For More Users .
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Mabanga Water Tank Pipes
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2007
- action
- Water Tank And Renovation
- output
- Closer Access To Clean Water.
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Chebukaka Girls Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Borehole Drilling, One Classroom
- output
- Conducive Learning Environment
- implementation status
- 2 Classroom To Wall Plate
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Nalondo Water Tank
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Water Tank
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 970,000
- estimate
- Ksh 970,000
Kimalewa Health Centre
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Solar Installation
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 963,000
- estimate
- Ksh 1,000,000
Nalondo Health Centre
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Wards And Purchase Of Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 1,500,000
Cbm Nalondo Dispensary
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2004
- action
- Construction
- output
- Closer Medical Services
- implementation status
- Complete But Not In Use.
- total cost
- Ksh 950,000
- estimate
- Ksh 2,500,000
Kaburwet Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Adm. Bloc
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Not Painted 4 Classrooms Walled & Roofed, Shuttered, Floored, Plastered.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,400,000
Namangofulo Dispensary
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2007
- action
- Plastering And Flooring The Nurse House
- output
- Closer Medical Services.
- implementation status
- Roofed, Plastered, Floored Painted Fix In Doors And Windows
- total cost
- Ksh 900,000
- estimate
- Ksh 0
Sikusi Sec
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- PurchaseOf Land, Classroom And Dining Hall
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 1 Classroom Is Complete. 1 Ha Of Land Bought.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,200,000
Nalondo Secondary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2004
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Bwake Secondary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of A Dormitory & Kitchen
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of P.H Completed 4 Classrooms .Requires: Painting, Window Pane.
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Toloso Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Wiring And Paying Kplc
- output
- Provision Of Light
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Binyenya Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of A Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Flooring, Plastering, Roofing, Shutters And Painting
- total cost
- Ksh 890,000
- estimate
- Ksh 750,000
Musokho Sec
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 5 Classrooms And Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Land 2 Acre Was Bought. 3 Classroom In Use But Requires Plastering& Painting.
- total cost
- Ksh 880,000
- estimate
- Ksh 700,000
Chemwa Bridge Dispensary
- location
-
Sirare
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Closer Medical Services
- implementation status
- Land Purchased
- total cost
- Ksh 873,000
- estimate
- Ksh 263,000
Bisunu Dispensary
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Flooring, Plastering And Painting Of Nurses Staff House
- output
- Closer Medical Services
- implementation status
- Ongoing
- total cost
- Ksh 863,630
- estimate
- Ksh 1,063,630
Marobo Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Adm Office \And 2 Class
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Roofed &Almost Complete. Adm Block On Wall Plate.
- total cost
- Ksh 853,600
- estimate
- Ksh 550,000
Chebukuyi Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Walled, Roofed, Plastered, Shuttered, Not Painted
- total cost
- Ksh 850,000
- estimate
- Ksh 770,000
Bisunu Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Plastering, Flooring And Painting
- output
- Increased Enrolment
- implementation status
- Admin Block Complete, I Classroom Ongoing
- total cost
- Ksh 835,000
- estimate
- Ksh 1,000,000
Ack Butonge Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Plastered Not Floored And Painted
- total cost
- Ksh 804,545
- estimate
- Ksh 1,200,000
Sichei Dispensary
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Health Centre
- output
- Closer Medical Services
- implementation status
- Roofed, Plastered But Needs Painting
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Mabanga Girls Secondary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Dormitory & Lab, Plastering, Flooring, Fixing Windows Panes
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Dormitory Complete Laboratory Requires Plastering, Painting.
- total cost
- Ksh 800,000
- estimate
- Ksh 1,200,000
Kaptanai Sec
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 1 Classroom Renovation
- output
- Provision Of Conducive Learning Environment
- implementation status
- Plastering, Flooring, Trenching, Shutters, Painting Needed
- total cost
- Ksh 800,000
- estimate
- Ksh 700,000
Londo primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- Adm. Block 2
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bukokholo Water Tank
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of Tank
- output
- Closer Access To Clean Water
- implementation status
- Complete In Use
- total cost
- Ksh 770,000
- estimate
- Ksh 770,000
Chebusitati Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of Adm. Block 2 Classrooms
- output
- Conducive Learning Environment For Teachers And Students
- implementation status
- 2 Classroom Sunk In The Ground And Cracked All Over
- total cost
- Ksh 755,450
- estimate
- Ksh 10,000,000
Lukhome Dispensary
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Residential Dispensary Completion
- output
- Closer Medical Services
- implementation status
- Expansion Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 1,500,000
Luuya Girls School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Renovation &Construction Of I Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovated Classrooms And Library. 1 Classroom Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Karibuni Gsec
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of A Twin House
- output
- Enhance Increased Enrolment
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 800,000
Chebukwa Secondary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Adm.Block And One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 1 Classroom Completed And In Use. D.H-Roofed ?Kitchen Floored, Plastered
- total cost
- Ksh 750,000
- estimate
- Ksh 650,000
Kiboochi Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 5Classroom Roofed
- total cost
- Ksh 750,000
- estimate
- Ksh 500,000
Ndakaru Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Adm. Block&Plastering, Flooring Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 740,000
- estimate
- Ksh 940,000
Namwela Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Wiring Of 4 Classrooms
- output
- Lighting
- implementation status
- Wiring Done, Power Connected
- total cost
- Ksh 738,747
- estimate
- Ksh 1,000,000
Kuywa Girls Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- Buying Underground Cables, Wiring Of Classrooms & Ad Block
- output
- Lighting
- implementation status
- Wiring On
- total cost
- Ksh 738,747
- estimate
- Ksh 1,000,000
Komiriai Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- 8 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 722,611
- estimate
- Ksh 1,500,000
Kuywa Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 4
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed
- total cost
- Ksh 705,450
- estimate
- Ksh 700,000
Nangwe Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classroom Completed
- total cost
- Ksh 704,545
- estimate
- Ksh 900,000
Khachonge Borehole
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2004
- action
- Drilling
- output
- Closer Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
St. Monica Girls Sec
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of Dormitory And Classrooms
- output
- Provision Of Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Sichei Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- 3 Classrooms&Roofing Of 2 Classrooms, Plastering Of 5 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classrooms To Be Plastered
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Mukhweya Dispensary
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Closer Medical Services
- implementation status
- Constructed Up To Roofing Level.
- total cost
- Ksh 693,600
- estimate
- Ksh 263,600
Makhonge Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Renovation Of Adm. Block And 2 Classrooms, Plastering Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Roofed
- total cost
- Ksh 690,000
- estimate
- Ksh 550,000
Busakala Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Completion Of Dormitory (Topping)
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Completed
- total cost
- Ksh 690,000
- estimate
- Ksh 500,000
Lwandanyi Polytechnic
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2003
- action
- Renovation & Equipment
- output
- Create Self Employment
- implementation status
- Equipments Bought, More Needed
- total cost
- Ksh 681,800
- estimate
- Ksh 800,000
Sichei Polytechnic
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Create Employment
- implementation status
- Purchase Of Land
- total cost
- Ksh 681,800
- estimate
- Ksh 800,000
Mukuyuni Polytechnic
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- Create Employment
- implementation status
- At Wall Plate Roofing Timbers Available
- total cost
- Ksh 681,800
- estimate
- Ksh 1,000,000
Kiboochi Polytechnic
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- Buying Of Land
- output
- Create Employment
- implementation status
- Purchase Of Land
- total cost
- Ksh 681,800
- estimate
- Ksh 500,000
Munyanganyi Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Adm. Block/1 Classroom
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Complete One Side Of The Structure
- total cost
- Ksh 650,000
- estimate
- Ksh 0
Sirare Ngalasia Dispensary
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Staff Houses
- output
- Closer Medical Services
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Sikusi Dispensary
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of Health Centre
- output
- Closer Medical Services
- implementation status
- Complete And In Use
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Musokho Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 4 Classrooms Were Constructed And Need Painting, Plastering, Flooring, Veranda 5Th Class Foundation Made.
- total cost
- Ksh 650,000
- estimate
- Ksh 600,000
Walukaya Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Increased Enrolment
- implementation status
- Land Purchased And Processing Of Land Title Deed
- total cost
- Ksh 640,000
- estimate
- Ksh 240,000
Kabuchai H/ Centre
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2004
- action
- Renovation
- output
- Closer Medical Services
- implementation status
- Renovation Done
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Ack Butonge Dispensary
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Health Centre
- output
- Closer Medical Services
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Marobo Secondary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Renovation/One & Construction Of A Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of Classroom Done Construction 1 Classroom Require Flooring, Plastering Shutters.
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kabuchai S Sec
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of 1 Classroom And Lab
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of 3 Classroom And An Office Done.
- total cost
- Ksh 600,000
- estimate
- Ksh 300,000
Nairumbi Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Constructed, Bought ? Acre At 120,000/=. Processing Of Title Deed Is On
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Chemwa Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms On Adm Block Require Veranda, Window Panes, Painting And Roughcasting.
- total cost
- Ksh 600,000
- estimate
- Ksh 850,000
Namakhele Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2004
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classrooms Completed. Bought 1/2Acre Of Land But Processing Of Title Deed Not Complete.
- total cost
- Ksh 570,000
- estimate
- Ksh 870,000
Sirisia Township Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Plastering, Flooring Of One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- One Classroom Roofed But Not Floored &Not Plastered
- total cost
- Ksh 550,000
- estimate
- Ksh 450,000
Sibumba Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of 5 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Built 3 Classrooms. Plastering Of 5 Classrooms, Flooring, Fitting Windows, Frame Door And Painting Needed
- total cost
- Ksh 550,000
- estimate
- Ksh 750,000
Pongola Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms & Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Complete And Land Bought. Renovation Of 4 Classroom Done.
- total cost
- Ksh 550,000
- estimate
- Ksh 650,000
Nakitumba Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
Korosiandeti Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Chwele Boys Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms And A Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Plastering, Flooring, Window And Door Frame, Painting
- total cost
- Ksh 550,000
- estimate
- Ksh 750,000
Lwandanyi Dispensary
- location
-
Lwandany
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 538,765
- estimate
- Ksh 500,000
Namwela Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Dormitory And One Classroom/Electricity
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Plastering, Painting Ongoing
- total cost
- Ksh 526,000
- estimate
- Ksh 526,000
Makhonge Health Centre
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- Buying Of Land
- output
- Construction
- implementation status
- To Be Started
- total cost
- Ksh 510,000
- estimate
- Ksh 50,000
Samita Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Adm. Block & 1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Roofed 1 Acre Of Land Bought
- total cost
- Ksh 502,272
- estimate
- Ksh 600,000
Kuafu Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 8 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Construction Of 7 Classrooms Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Sitila Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2004
- action
- Construction of Of 6 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom And Office Needs Painting. Renovated 2 Classrooms Complete Only Painting Needed
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Malakisi Muslim Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- One Classroom Roofed But Not Plastered And Windows Not Fitted Floored, Painted.
- total cost
- Ksh 500,000
- estimate
- Ksh 1,200,000
Mikayu Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 6 Classrooms & Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 6Classroom Were Put Up 5Requres Flooring, Shutters, Painting, Window And Door. 6Th Lintel Level, 4Th Roofed With Old Iron Sheets.
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Sawali Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2008
- action
- Buying Of Land
- output
- Increased Enrolment/Conducive Learning Environment
- implementation status
- Land Purchase On The Process (1Ha)
- total cost
- Ksh 500,000
- estimate
- Ksh 430,000
Sengeteti Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Admin Block&2 Classrooms & Administration Block
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Plastering, Flooring, Painting Is Needed
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Lwandanyi Water Tank
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of Tank
- output
- Closer Access To Clean Water
- implementation status
- Tank Installed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Korosiandeti Dispensary
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- Ward Construction
- output
- Lighting
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sibumba Girls Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 1 Acre Of Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Land Bought
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Malakisi Ack Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Chwele GPrimary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Needs Flooring, Window Frame And Door& Painting
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Khalaba Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2004
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Constructed And Requires Final Finishing
- total cost
- Ksh 500,000
- estimate
- Ksh 650,000
Namaondo Cbm Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Purchase Of Land 1
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Purchase Of One Acre Of Land
- total cost
- Ksh 490,000
- estimate
- Ksh 600,000
Misiri Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2003
- action
- 8 Classrooms & Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 8 Classrooms 4 Complete 4 Needs Final Finishing Adm Half Way Roofed With Old Iron Sheets. Flooring Painting Inside, Shutters For 8 Classrooms Are Needed.
- total cost
- Ksh 458,160
- estimate
- Ksh 600,000
Lukhome Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Floor &Plastering
- total cost
- Ksh 455,450
- estimate
- Ksh 600,000
Toloso Sec
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- 2 Classrooms
- output
- Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Lurare Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Construction O2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Matibo Rc Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Now Plastering Inside, Flooring &Painting
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Khatiri Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- 3 Classrooms & Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classes Complete And In Use Land 11/4 Acre Bought.
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Nabeki R Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Adm. Block
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 550,000
Queen Of Angles
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of A Dormitory
- output
- Good Environment For Learning
- implementation status
- Construction On Going
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Sichei R Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of 2 Classrooms Complete. Constructed 2 Classrooms With Needs Plastering Out, Roughcasting Fascia Board
- total cost
- Ksh 410,000
- estimate
- Ksh 520,000
Wabukhonyi Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 402,600
- estimate
- Ksh 590,000
Lukhuna Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Construction O1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom At Wall Plate Land Has Not Been Bought
- total cost
- Ksh 402,272
- estimate
- Ksh 300,000
Namunyu Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Plastering, Flooring, Painting, Windows And Door Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,200,000
Bukokholo Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Roofed, But Not Plastered.
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kasosi Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms & Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 1 Acre Bought , 2 Classroom Needs Flooring Painting Plastering Window Panes Roofing Adm Block On Going.
- total cost
- Ksh 400,000
- estimate
- Ksh 475,000
Kibeu Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Requires Final Finishing
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Mabanga Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Menu Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Purchase 2Acres Of Land
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- On Going
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Milembe Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Purchase Of Land And Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Land Bought
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mwanda S Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- 3 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Nambuya Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use Not Painted
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Sikata Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Constructed Requires Painting Flooring Shutters, Plastering And Veranda. 4 Are Roofed 5 More Classroom Walling Plate High.
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Tamlega Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Of Adm. Block
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Wabukhonyi S Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Construction At The Lintel
- total cost
- Ksh 400,000
- estimate
- Ksh 100,000
Wamono Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Needs Plastering And Painting
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Kikai Sec
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of A Dormitory
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Lurare Dispensary
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of Health Centre
- output
- Closer Medical Services
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Nalondo Tank Pipes
- location
-
Luuya
(in Sirisia)
- year first funded
- 2007
- action
- Wells Construction And Renovation
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Marobo Sec
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Wiring
- output
- Lighting
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Sikulu Dispensary
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Wiring Nurses Houses &Paying Kplc
- output
- Lighting
- implementation status
- Wired
- total cost
- Ksh 398,747
- estimate
- Ksh 400,000
Nalondo Secondary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2006
- action
- Computer Installation
- output
- Computer Learning
- implementation status
- 3 Classroom Completed, Renovation Of 8 Classroom Done. Dormitory Plastering Painting.
- total cost
- Ksh 389,000
- estimate
- Ksh 389,000
Chongoyi Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 385,000
- estimate
- Ksh 585,000
Mayekwe primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Renovation And Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete But Requires Final Finishing
- total cost
- Ksh 380,000
- estimate
- Ksh 450,000
Nalondo Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Wiring & Renovation
- output
- Lighting
- implementation status
- Wiring On Going
- total cost
- Ksh 375,107
- estimate
- Ksh 400,000
Katomei Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 375,000
- estimate
- Ksh 900,000
Baraki Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Completed
- total cost
- Ksh 355,450
- estimate
- Ksh 655,450
Lwandanyi Ecd St AquinaSecondary Schoold Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2007
- action
- Renovation And Construction Of A Class
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 650,000
Lukaala Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 300,000
Chebukaka Boys Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- 2 Classrooms Construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Sikusi Secondary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring And Power Connected
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Nasaka Dispensary
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Closer Medical Services
- implementation status
- To Be Done
- total cost
- Ksh 350,000
- estimate
- Ksh 100,000
Lukhome Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2007
- action
- 1 Classroom, Plastering, Flooring &Painting
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Sitabicha Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 450,000
Sirare Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Land Bought, 2 Classrooms Being Constructed.
- total cost
- Ksh 350,000
- estimate
- Ksh 650,000
Musieba Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms & Administration Block
- output
- 2 Classrooms & Administration Block
- implementation status
- On-Going
- total cost
- Ksh 350,000
- estimate
- Ksh 6,000,000
Lwandanyi Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of Adm. Block
- output
- Conducive Learning Environment For Teachers And Students
- implementation status
- Roofed But Plastering Not Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Sirare Ngalasia Dispensary
- location
-
Sirare
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Ongoing
- total cost
- Ksh 330,000
- estimate
- Ksh 400,000
Lwakhakha Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 1 Classrooms
- output
- Increased Enrolment ./Conducive Learning Environment
- implementation status
- Complete But Needs Final Finishing.
- total cost
- Ksh 325,000
- estimate
- Ksh 325,000
Siumbwa Cattle Dip
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete In Use
- implementation status
- in use
- total cost
- Ksh 320,000
- estimate
- Ksh 85,000
Chebukaka Girls primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms & Installation Of Power
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed , Plastered Floored
- total cost
- Ksh 310,900
- estimate
- Ksh 310,900
Bwake Sec
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Wiring Of Adm Block & Paying Kplc
- output
- Lighting
- implementation status
- Wiring Done But No Power-Ongoing
- total cost
- Ksh 306,747
- estimate
- Ksh 350,000
Bukiabi Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Not Plastered, Not Floored, Not Painted
- total cost
- Ksh 300,000
- estimate
- Ksh 350,000
Yabeko Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Provision Of Light For Easy Study For Students
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Sikata Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nalondo Secondary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2004
- action
- Wiring And Installation Of Power
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Lwandanyi Sec
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Luuya Girls Sec
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Ongoing Project
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Lukhome Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2007
- action
- Wiring 7 Classrooms
- output
- Lighting
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Busakala Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Wiring Of Class And Dormitory
- output
- Lighting
- implementation status
- Wiring Has Been Done
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Teremi Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Provision Of Conducive Learning Environment
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Sikulu Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- 1 Classroom Construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Chwele Girls Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A One Classroom
- output
- -
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nasaka Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Require Window And Door, Started Administration Block 2Brick Wall.
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Namilama D Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of 4 Classroom &2 Office.
- total cost
- Ksh 300,000
- estimate
- Ksh 3,000,000
Malakisi A Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- Renovation Of Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Kolani Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete But Requires Plastering, Flooring& Painting
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Chenjeni S Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Completed But Require Plastering, Window Pane, Painting,
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Chekulo Fym Primary
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classroom Requires Plastering& Shutters, Painting
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Sikulu Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 1 Classroom Roofed Administration Block At Slab Level
- total cost
- Ksh 290,725
- estimate
- Ksh 350,000
Kabuchai Water Project
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2004
- action
- Spring Well Protection
- output
- Closer Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 290,000
- estimate
- Ksh 290,000
Lukaala Cattle Dip
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete But Not In Use
- implementation status
- in use
- total cost
- Ksh 270,000
- estimate
- Ksh 27,000
Luuya Dispensary
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Wiring Of Adm. Block& Patients Reception Hall
- output
- Lighting
- implementation status
- Ongoing
- total cost
- Ksh 268,747
- estimate
- Ksh 4,000,000
Butonge Dispensary
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 268,747
- estimate
- Ksh 230,000
Bukokholo Dispensary
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 268,747
- estimate
- Ksh 230,000
Kibichori Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms And Store
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Completed
- total cost
- Ksh 265,000
- estimate
- Ksh 300,000
Korosiandet Cattle Dip
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- more funds required
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Bukokholo Cattle Dip
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete
- implementation status
- in use
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Bisunu Cattle Dip
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete But Not In Use
- implementation status
- in use
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Mukhweya Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2003
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of Adm Office Done.
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Kimalewa Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- 8 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed One Classroom Floored And Plastered
- total cost
- Ksh 255,450
- estimate
- Ksh 350,000
Toloso Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Renovation
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Sirisia Mal Fym Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of A Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Ring Beam Level
- total cost
- Ksh 250,000
- estimate
- Ksh 560,000
Ndakaru Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 1 Classroom Construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 250,000
- estimate
- Ksh 350,000
Nangili Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Roofed Require Plastering ,Shutters.
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Namosi Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classrooms Require Final Finishing.
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Namawanga S Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- At Lintel Level
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Masaba Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- In The Process Of Plastering And Roofing, Fitting Indoor And Windows
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Malinda F Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- To Be Plastered, Roofing Done
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Kulisiru Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Kabuchai S Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classroom Require Painting, And Plastering
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Chekulo Fym School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 3 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing Project
- total cost
- Ksh 250,000
- estimate
- Ksh 450,000
Chebukwa Deb Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Constructed 4 Classrooms, Roofed. Need Final Finishing,
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Bwake Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classes Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 550,000
Butonge Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed, Windows Fitted, And Plastered
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Bisunu Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed , Windows Fitted, But Not Plastered
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Binyenya S Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Renovation And Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Needs Plastering Flooring Of 2 Classroom, Painting
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Sirisia Youth Politechnic
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- Wiring& Paying Kplc
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 238,747
- estimate
- Ksh 200,000
Lukhome Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- Wiring Of 11 Classrooms
- output
- -
- implementation status
- Wiring Done
- total cost
- Ksh 238,747
- estimate
- Ksh 300,000
Namilama Secondary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- To Be Done
- total cost
- Ksh 238,747
- estimate
- Ksh 300,000
Township Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- Wiring
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 238,747
- estimate
- Ksh 200,000
Rehabilitation Of Spring Wells
- location
-
Namwela
(in Sirisia)
- year first funded
- 2003
- action
- Renovation
- output
- Closer Access To Water
- implementation status
- Complete
- total cost
- Ksh 237,000
- estimate
- Ksh 237,000
Sirisia Cattle Dip
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete In Use
- implementation status
- more funds required
- total cost
- Ksh 226,360
- estimate
- Ksh 120,000
Mabanga Girls Sec
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 226,000
- estimate
- Ksh 350,000
Kikai Cattle Dip
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- in use
- total cost
- Ksh 225,902
- estimate
- Ksh 225,902
Sichei Secondary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 222,221
- estimate
- Ksh 150,000
Sikulu Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 222,188
- estimate
- Ksh 150,000
Nangwe Secondary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 222,188
- estimate
- Ksh 150,000
Busakala Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Lwandanyi Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Renovation And Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lukhome Dispensary
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kimalewa Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kikai Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Karibuni Gsec
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Kaptanai Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Chwele Girls Sec
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Wiring &Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Chwele Friends Dispensary
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Not Completed ?Lighting On
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Chebukaka Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Cdf Office
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Has Been Odne
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Busakala Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Wiring 11 Classrooms
- output
- Lighting
- implementation status
- Wiring
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Binyenya Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sirisia Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Conducive Learning Environment
- implementation status
- Roofed But Not Plastered
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Munyanganyi Fym
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Construction Of A Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed But Not Plastered, Floored Windows Not Fitted
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Wanjoya Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Plastering And Painting Needed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Teremi F primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Sichei F primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2004
- action
- Construction of Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Ngalasia Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Roofed And Plastered, Shuttered, Floored
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Namwesi Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- 1 Classroom, Plastering And Painting
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Classroom Roofed Windows Fitted .
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Nalondo Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Renovation Of 4 Classrooms Done.
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mutonyi Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Madisi Fym Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Roofed And But Needs Final Finishin
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kisiwa R Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 356,000
Khachonge R Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2006
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classrooms Completed By Kessp
- total cost
- Ksh 200,000
- estimate
- Ksh 650,000
Chenjeni F Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Chekulo Baptist Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 3 Classrooms Half Way Roofed With Old Iron Sheets. Requires Plastering, Flooring, Shutters, Walling Of Higher Side(Cape) Painting .Bought 1 Acre Of Land
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Chebunyinyi Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Classroom Contraction And Roofed But Require Final Finishing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Chebukutumi Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- 3 Classroom construction
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Needs To Be Fitted With Windowpanes, Door& Plastering Flooring
- total cost
- Ksh 200,000
- estimate
- Ksh 550,000
Madisi Secondary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Wired
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Tamlega Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring In Process
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Sirisia Su-District
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Provision Of Light For Easy Study For Students
- implementation status
- Wiring Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sikusi Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Sibanga Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Provision Of Light For Easy Study For Students
- implementation status
- Wiring Done And Power Connected
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Nalondo Health Centre
- location
-
Luuya
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mukhweya Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Mabanga Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2007
- action
- Wiring &Paying Kplc
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 198,747
- estimate
- Ksh 300,000
Khalaba Factory
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Power
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 190,000
- estimate
- Ksh 250,000
Sitabicha Cattle Dip
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete In Use
- implementation status
- in use
- total cost
- Ksh 190,000
- estimate
- Ksh 120,000
Ndakaru Cattle Dip
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete In Us
- implementation status
- in use
- total cost
- Ksh 190,000
- estimate
- Ksh 120,000
Nambuya Cattle Dip
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- more funds
- total cost
- Ksh 190,000
- estimate
- Ksh 120,000
Namangofulo Cattle Dip
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete But In Use
- implementation status
- plastering
- total cost
- Ksh 190,000
- estimate
- Ksh 120,000
Kabrwet Cattle Dip
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Renovation Complete But Not In Use
- implementation status
- in use
- total cost
- Ksh 190,000
- estimate
- Ksh 190,000
Sirisia Polytechnic
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- Flooring, Plastering And Shutters Of 2 Classrooms
- output
- Self Employment
- implementation status
- Construction Ongoing
- total cost
- Ksh 181,800
- estimate
- Ksh 1,000,000
Namwela Polytechnic
- location
-
Namwela
(in Sirisia)
- year first funded
- 2008
- action
- Buying Land
- output
- Create Employment
- implementation status
- Money Has To Be Funded
- total cost
- Ksh 181,800
- estimate
- Ksh 700,000
Malakisi Polytechnic
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of A Classroom
- output
- Create Employment
- implementation status
- Construction Ongoing
- total cost
- Ksh 181,800
- estimate
- Ksh 1,000,000
Chwele Polytechnic
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- Plastering, Flooring And Shuttering
- output
- Create Employment
- implementation status
- 1 Completed
- total cost
- Ksh 181,800
- estimate
- Ksh 500,000
Malakisi Ack Sec
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 166,833
- estimate
- Ksh 0
Sibumba Factory
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 2 Classrooms
- output
- Lighting/Factory Use
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 160,000
Namaondo Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- Wiring
- output
- Lighting
- implementation status
- Completed
- total cost
- Ksh 158,747
- estimate
- Ksh 120,000
Sirare Cattle Dip
- location
-
Sirare
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Renovation Complete In Use
- implementation status
- more funds required
- total cost
- Ksh 156,360
- estimate
- Ksh 85,000
Mukuyuni Cattle Dip
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- KESP/CDF
- total cost
- Ksh 156,360
- estimate
- Ksh 85,000
Makhonge Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- 2 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Slab Level
- total cost
- Ksh 155,450
- estimate
- Ksh 600,000
Nanjikobe Cattle Dip
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- final
- total cost
- Ksh 155,000
- estimate
- Ksh 85,000
Butunde Cattle Dip
- location
-
Namwela
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete But Not In Use
- implementation status
- more funds required CDF
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Chekulo Cattle Dip
- location
-
Luuya
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Renovation Complete
- implementation status
- in use improvement
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Khalaba
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2004
- action
- Improved Livestock Production
- output
- Complete
- implementation status
- not known
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Kimalewa Cattle Dip
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- more funds required
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Menu Cattle Dip
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete But Not In Use
- implementation status
- in use
- total cost
- Ksh 155,000
- estimate
- Ksh 85,000
Wapuka Cattle Dip
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete But Not In Use
- implementation status
- in use
- total cost
- Ksh 155,000
- estimate
- Ksh 85,000
Namutokholo Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2005
- action
- 4 Classrooms
- output
- Increased Enrolment/ Conducive Learning
- implementation status
- Renovations Of 3 Classrooms Done.
- total cost
- Ksh 150,000
- estimate
- Ksh 1,200,000
Lwandanyi Primary School
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2006
- action
- Renovation
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 250,000
Bukokholo Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2005
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Wapukha Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2006
- action
- 1 Acres Land
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Luuya Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Construction Of 8 Classrooms
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- 2 Offices And 8 Classrooms. Constructed But Require Roofing& , Plastering.
- total cost
- Ksh 150,000
- estimate
- Ksh 450,000
Kaptanai S Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Plastering And Flooring Of 2 Classrooms
- output
- Increased Enrolment
- implementation status
- Completion Of 2 Classrooms, Installed
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Kasiamo Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Roofed Not Plastered
- total cost
- Ksh 150,000
- estimate
- Ksh 450,000
Sikusi Primary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Construction of Of One Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 350,000
Rehabilitation Of Boreholes
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Renovation
- output
- Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 147,000
- estimate
- Ksh 147,000
Korosiandet Dispensary
- location
-
Lwandany
(in Sirisia)
- year first funded
- 2008
- action
- Wiring
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 146,747
- estimate
- Ksh 120,000
Musokho Secondary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 138,888
- estimate
- Ksh 150,000
Bishop Wabukala Malakisi Ack Secondary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Books Purchased For First Allocation
- total cost
- Ksh 138,888
- estimate
- Ksh 150,000
Kabuchai Secondary School
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2007
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Books Purchased For First Allocation
- total cost
- Ksh 138,888
- estimate
- Ksh 150,000
Chekulo Secondary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 138,855
- estimate
- Ksh 10,000
Chwele Boys Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- Wiring &Paying Of Kplc
- output
- Lighting
- implementation status
- Ongoing
- total cost
- Ksh 138,747
- estimate
- Ksh 300,000
Malakisi Health Centre
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2008
- action
- Wiring The Theatre
- output
- Lighting
- implementation status
- Complete Not In Use
- total cost
- Ksh 138,747
- estimate
- Ksh 200,000
Namilama Primary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Wiring In Classroom
- output
- Lighting
- implementation status
- To Be Done
- total cost
- Ksh 138,747
- estimate
- Ksh 200,000
Ngalasia Dispensary
- location
-
Sirare
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Adm Block
- output
- Lighting
- implementation status
- To Be Done
- total cost
- Ksh 138,747
- estimate
- Ksh 150,000
Sitila Primary School
- location
-
Sirare
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of 2 Classrooms
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 138,747
- estimate
- Ksh 150,000
Baraki Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- Payment Of Kplc & Wiring
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 138,747
- estimate
- Ksh 100,000
Chebukaka G Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of 4 Classrooms & Payment Of Kplc
- output
- Lighting
- implementation status
- Wiring Done
- total cost
- Ksh 138,747
- estimate
- Ksh 100,000
Khachonge G High
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Installation Of Power &Wiring Of Power House
- output
- Lighting
- implementation status
- Wiring To Be Done
- total cost
- Ksh 138,747
- estimate
- Ksh 200,000
Kimalewa Health Centre
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Dcs Residence
- location
-
Chwele
(in Sirisia)
- year first funded
- 2007
- action
- n/a
- output
- Lighting
- implementation status
- Completed
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kabuchai Health Centre
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2007
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Chwele Girls Primary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2007
- action
- Electricity
- output
- Lighting
- implementation status
- Complete
- total cost
- Ksh 126,000
- estimate
- Ksh 126,000
Namwela Location
- location
-
Namwela
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Lwandanyi Location
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Malakisi Location
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Chwele Location
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Mukuyuni Location
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Luuya Location
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
North Bukusu Location
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Sirare Location
- location
-
Sirare
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Kabuchai Location
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Sirisia Location
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- A Ball & Game Uniforms Trophies & Shields
- output
- Nurturing Talents
- implementation status
- Balls, Uniforms, Sports Shoes And Other Sports Equipments Have Been Bought
- total cost
- Ksh 125,454
- estimate
- Ksh 50,000
Sikusi Cattle Dip
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Improved Livestock Production
- output
- Complete And In Use
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Luucho
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Improved Livestock Production
- output
- Complete And In Use
- implementation status
- not known
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Mabanga Cattle Dip
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Renovation Complete And In Use
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Makhonge Cattle Dip
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Not Operating
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Maliki Cattle Dip
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Not Operating
- implementation status
- KESSA/CDF
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Milani Cattle Dip
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Operating
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Mukhweya
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Improved Livestock Production
- output
- Not In Use
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Muyayi Cattle Dip
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2005
- action
- Improved Livestock Production
- output
- Complete
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Nalondocattle Dip
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Namukongo Cattle Dip
- location
-
Luuya
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete And In Use
- implementation status
- more funds required
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Ndareti Cattle Dip
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Operating
- implementation status
- more funds required
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Sanandiki Cattle Dip
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete In Use
- implementation status
- in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Sikulu Cattle Dip
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Increased Livestock Production
- output
- Complete, In Using
- implementation status
- PTA/CDF in use
- total cost
- Ksh 120,000
- estimate
- Ksh 85,000
Nalondo Water Pump
- location
-
Kabuchai
(in Sirisia)
- year first funded
- 2006
- action
- Spring Protection
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 113,000
- estimate
- Ksh 113,000
Khachonge Water Pump
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2006
- action
- Installation Of Sub-Massive Pump
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 113,000
- estimate
- Ksh 113,000
Sango Pefa Primary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Land Purchased
- total cost
- Ksh 110,000
- estimate
- Ksh 300,000
Namilama Secondary School
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2008
- action
- Wiring
- output
- Lighting
- implementation status
- To Be Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Teremi Secondary School
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Namwela Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of 4 Classrooms
- output
- Lighting
- implementation status
- To Be Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Matibo Friends
- location
-
Chwele
(in Sirisia)
- year first funded
- 2008
- action
- 1 Classroom
- output
- Good Performance For Students
- implementation status
- Bought Land
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Lutaso Pefe Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2007
- action
- Renovation
- output
- Conducive Learning Environment.
- implementation status
- Plastering, Flooring
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Sanandiki Primary School
- location
-
Chwele
(in Sirisia)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 680,000
Sibanga S Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2007
- action
- Construction of Of A Classroom
- output
- Improve Learning Enrolment
- implementation status
- Plastering, Flooring, Window Pane And Doors
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
St Anthony Sirisia Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- Flooring,Plastering And Painting
- output
- Provision Of Conducive Learning Environment
- implementation status
- Complete And In Use
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Bisunu Secondary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- Lighting
- output
- Provision Of Light For Efficient Study By Students.
- implementation status
- Wiring Done But No Power
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Malakisi Muslim Primary School
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Lighting
- implementation status
- Wiring To Be Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Namangofulo Sec
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2006
- action
- Wiring
- output
- Increased Enrolment /Conducive Learning Environment
- implementation status
- Wiring Done
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Spring And Wells Chwele Nursery Borehole, Maliki And Samit
- location
-
Chwele
(in Sirisia)
- year first funded
- 2003
- action
- Renovation And Construction Of Springs And Wells
- output
- Access To Water Services
- implementation status
- Complete And In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Spring And Wells
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2003
- action
- Renovation And Construction Of Springs And Wells
- output
- Access To Water Services
- implementation status
- Complete And In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Rehabilitation Of Spring Wells
- location
-
Sirare
(in Sirisia)
- year first funded
- 2003
- action
- Wells Construction
- output
- Closer Water Services
- implementation status
- Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Rehabilitation Of Spring Wells
- location
-
Luuya
(in Sirisia)
- year first funded
- 2003
- action
- Rehabilitation Of Wells
- output
- Close Access To Water
- implementation status
- Complete In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Rehabilitation Of Spring Wells
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2003
- action
- Rehabilitation
- output
- Closer Access To Water
- implementation status
- Complete In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Rehabilitation Of Spring Wells
- location
-
Malakisi
(in Sirisia)
- year first funded
- 2003
- action
- Well Construction
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Rehabilitation Of Spring Wells
- location
-
Lwandanyi
(in Sirisia)
- year first funded
- 2003
- action
- Rehabilitation Of Wells
- output
- Closer Access To Water
- implementation status
- Complete And In Use
- total cost
- Ksh 90,000
- estimate
- Ksh 90,000
Kiboochi
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of Adm Block & 1 Classroom
- output
- Lighting
- implementation status
- To Be Started
- total cost
- Ksh 88,747
- estimate
- Ksh 100,000
Sirisia Constituency Admin Police Sports
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2009
- action
- Purchase Of Uniforms And Equipment
- output
- -
- implementation status
- New
- total cost
- Ksh 80,000
- estimate
- Ksh 0
Saratuki Cattle Dip
- location
-
Luuya
(in Sirisia)
- year first funded
- 2006
- action
- Increased Livestock Production
- output
- Renovation Complete And In Use
- implementation status
- need funds
- total cost
- Ksh 70,000
- estimate
- Ksh 85,000
Binyenye Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2008
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 55,555
- estimate
- Ksh 100,000
Sibunba Secondary School
- location
-
Namwela
(in Sirisia)
- year first funded
- 2008
- action
- Purchase Books
- output
- Improve Quality Of Education
- implementation status
- Text Books Purchased
- total cost
- Ksh 55,555
- estimate
- Ksh 100,000
Malinda S Primary School
- location
-
Sirisia
(in Sirisia)
- year first funded
- 2008
- action
- Construction Of Ecd Classroom
- output
- Increased Enrolment
- implementation status
- Ongoing
- total cost
- Ksh 54,500
- estimate
- Ksh 300,000
Luuya Primary School
- location
-
Luuya
(in Sirisia)
- year first funded
- 2008
- action
- Wiring Of 1 Classroom
- output
- Lighting
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Masibo Biketi, Chetambe, Cheleni,Mukubale, Mutuba Bomboa,Lukhome
- location
-
Mukuyuni
(in Sirisia)
- year first funded
- 2004
- action
- Renovation And Construction Of Springs And Wells
- output
- Access To Water Services
- implementation status
- Complete And In Use
- total cost
- Ksh 45,000
- estimate
- Ksh 45,000
Khachonge Dispensary
- location
-
North Bukusu
(in Sirisia)
- year first funded
- 2009
- action
- n/a
- output
- Lighting
- implementation status
- in use
- total cost
- Ksh 38,747
- estimate
- Ksh 0