The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Sotik
Kampira primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 4,050,000
- estimate
- Ksh 900,000
Kamureito Water project
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2004
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 3,515,101
- estimate
- Ksh 4,000,000
Kimolwet secondary School
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2004
- action
- dining hall construction
- output
- dining hall complete
- implementation status
- complete
- total cost
- Ksh 3,460,000
- estimate
- Ksh 4,000,000
Chebilat secondary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 2,800,000
- estimate
- Ksh 600,000
Tamongo primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 2,180,000
- estimate
- Ksh 600,000
Ndanai secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Lab construction
- output
- Improve learning
- implementation status
- Ongoing
- total cost
- Ksh 1,861,938
- estimate
- Ksh 3,000,000
Togomin primary School
- location
-
Chebilat
(in Sotik)
- year first funded
- 2004
- action
- 4 Classrooms construction
- output
- 4 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 2,000,000
Kipsimbol primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 1,280,000
- estimate
- Ksh 600,000
Kipsingei secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom building
- output
- 3 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,256,938
- estimate
- Ksh 1,500,000
Tarakwa Health Center
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2003
- action
- Delivery room construction
- output
- Delivery room complete
- implementation status
- complete
- total cost
- Ksh 1,179,775
- estimate
- Ksh 1,000,000
Ngariet secondary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 3 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,500,000
Chebilat primary School
- location
-
Chebilat
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,621,428
Kipngosos special School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 3 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,135,000
- estimate
- Ksh 1,500,000
Tarakwa secondary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 3 classroom complete
- implementation status
- complete
- total cost
- Ksh 1,090,000
- estimate
- Ksh 1,900,000
Kipsimbol secondary School
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Classroom Construction
- output
- 3 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,086,875
- estimate
- Ksh 1,500,000
Gelegele secondary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2006
- action
- Lab Construction.
- output
- 1 lab room
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 2,000,000
Kibori primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2003
- action
- 4 Classrooms construction
- output
- 4 classrooms complete and in used
- implementation status
- complete
- total cost
- Ksh 1,024,000
- estimate
- Ksh 1,500,000
Gorgor secondary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2004
- action
- Dining Hall Construct.
- output
- 1 room
- implementation status
- Ongoing
- total cost
- Ksh 1,013,875
- estimate
- Ksh 1,500,000
Kanusin secondary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 3 classrooms complete
- implementation status
- complete
- total cost
- Ksh 1,013,000
- estimate
- Ksh 1,500,000
kaposiriri water
- location
-
mutarakwa
(in Sotik)
- year first funded
- 2009
- action
- Tank construction
- output
- new
- implementation status
- ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
gelegele water project
- location
-
gelegele
(in Sotik)
- year first funded
- 2009
- action
- Tank construction
- output
- new
- implementation status
- ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 7,000,000
Muiywek secondary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2003
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 975,000
- estimate
- Ksh 1,500,000
solyot secondary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2003
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 965,500
- estimate
- Ksh 1,000,000
Chebongi secondary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2005
- action
- Classroom Construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 950,000
- estimate
- Ksh 1,000,000
Kaptulwo/cheboet Dispensary
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Staff house construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 944,425
- estimate
- Ksh 1,000,000
Tembwo Girls secondary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- lab construction
- output
- Ongoing
- implementation status
- Ongoing
- total cost
- Ksh 920,000
- estimate
- Ksh 2,000,000
Kaptilolwo primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2003
- action
- 2 Classrooms construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Taabok primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 885,000
- estimate
- Ksh 0
Rotik secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Classroom Construction
- output
- 2 classrooms complete
- implementation status
- compele
- total cost
- Ksh 881,938
- estimate
- Ksh 1,000,000
Cheptangulgei Dispensary
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- complete
- total cost
- Ksh 850,000
- estimate
- Ksh 900,000
Chepchirik Bridge
- location
-
Gelegele
(in Sotik)
- year first funded
- 2004
- action
- Bridge construction
- output
- Usable vehicle bridge
- implementation status
- complete
- total cost
- Ksh 850,000
- estimate
- Ksh 900,000
Kanusin/ Motiret Bridge
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Bridge construction
- output
- Usable foot bridge
- implementation status
- Stalled
- total cost
- Ksh 820,000
- estimate
- Ksh 920,000
Motiret secondary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2006
- action
- Classroom Construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 806,938
- estimate
- Ksh 1,000,000
Sironet girls secondary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 775,000
- estimate
- Ksh 1,300,000
Motiret / Kapkelei Brid
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Bridge construction
- output
- Usable foot bridge
- implementation status
- Stalled
- total cost
- Ksh 767,242
- estimate
- Ksh 817,241
Kapkelei/sise water
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 765,000
- estimate
- Ksh 5,000,000
Kapkelei secondary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Dining Hall Construct.
- output
- 1 room
- implementation status
- Ongoing
- total cost
- Ksh 756,938
- estimate
- Ksh 1,500,000
Kamureito secondary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 32classrooms complete
- implementation status
- complete
- total cost
- Ksh 750,000
- estimate
- Ksh 900,000
Gorgor Dispensary
- location
-
Obosi
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- complete
- total cost
- Ksh 747,000
- estimate
- Ksh 800,000
Kokwan primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 2 classrooms Complete
- implementation status
- complete
- total cost
- Ksh 734,000
- estimate
- Ksh 1,000,000
Kimolwet Dispensary
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 2,000,000
Kipajit primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2004
- action
- 2 new Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Lulusik primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 690,000
- estimate
- Ksh 1,000,000
Oldebesi secondary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2006
- action
- Classroom Construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 681,938
- estimate
- Ksh 1,000,000
Mutarakwa DO offices
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- DO’s office Construction
- output
- complete a 2 room structure
- implementation status
- complete in use
- total cost
- Ksh 669,000
- estimate
- Ksh 1,000,000
Cheserton primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 654,000
- estimate
- Ksh 954,000
Sugutek primary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2004
- action
- Land Buying
- output
- 2 acre piece of land
- implementation status
- complete
- total cost
- Ksh 610,000
- estimate
- Ksh 1,000,000
Changina secondary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 2,000,000
Kaplelach primary School
- location
-
Gelegele
(in Sotik)
- year first funded
- 2003
- action
- 2 Classroom construction
- output
- 2 classrooms
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Koiyet primary School
- location
-
Gelegele
(in Sotik)
- year first funded
- 2006
- action
- Classrooms construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kapsosurwo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 590,000
- estimate
- Ksh 900,000
Chesegem primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2003
- action
- 2 Classrooms construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 590,000
- estimate
- Ksh 900,000
Molinga primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 584,000
- estimate
- Ksh 974,000
Kapkelei location
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- build a decent office
- implementation status
- Ongoing
- total cost
- Ksh 576,000
- estimate
- Ksh 1,000,000
Rongena health centre
- location
-
Rongena
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- complete
- total cost
- Ksh 576,000
- estimate
- Ksh 950,000
Ngentalel primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 2 classrooms are ongoing
- implementation status
- Ongoing
- total cost
- Ksh 575,000
- estimate
- Ksh 875,000
Kiptapsir primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 570,000
- estimate
- Ksh 800,000
Chebongi primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2004
- action
- 3 Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 570,000
- estimate
- Ksh 900,000
Kimase primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2004
- action
- 2 Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 560,000
- estimate
- Ksh 600,000
Kenegut primary School
- location
-
Gelegele
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 554,000
- estimate
- Ksh 1,000,000
Kaptulwo secondary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Kipajit dispensary
- location
-
Kaplong
(in Sotik)
- year first funded
- 2007
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Kapkesembe dispensary
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- compelete
- total cost
- Ksh 550,000
- estimate
- Ksh 650,000
Kesenge primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2005
- action
- 2 Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 540,000
- estimate
- Ksh 1,000,000
Bambanik primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 530,000
- estimate
- Ksh 1,000,000
Kimolwet location
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- Chief’s office construction
- implementation status
- Ongoing
- total cost
- Ksh 525,000
- estimate
- Ksh 600,000
Mosonik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom Complete 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 510,199
- estimate
- Ksh 800,000
Sumoni primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Kipsonoi primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Chemogoi primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2003
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
kanusin primary School
- location
-
kanusin
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 50,000
Kipngosos community water project
- location
-
Rongena
(in Sotik)
- year first funded
- 2008
- action
- provide clean water
- output
- Build water tank
- implementation status
- Complete in use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Gelegele dispensary
- location
-
ndanai
(in Sotik)
- year first funded
- 2007
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- complete
- total cost
- Ksh 500,000
- estimate
- Ksh 800,000
Mabwaita Bridge
- location
-
Manaret
(in Sotik)
- year first funded
- 2004
- action
- Bridge construction
- output
- Usable vehicle bridge
- implementation status
- complete
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Chesilyot secondary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- complete
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kipterkekian primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- 2 Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kapkoitim primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 2 classrooms Complete
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Kaplelach Dispensary
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- complete
- total cost
- Ksh 498,830
- estimate
- Ksh 600,000
Kapletundo DO’s
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2007
- action
- DO’s office construction
- output
- land purchase
- implementation status
- comolete
- total cost
- Ksh 498,000
- estimate
- Ksh 500,000
Kapchemibei Dispensary
- location
-
Abosi
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- complete
- total cost
- Ksh 497,000
- estimate
- Ksh 600,000
Gaa Tuiyobei primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- Land buying
- output
- 1.5 acre piece of land
- implementation status
- complete
- total cost
- Ksh 493,748
- estimate
- Ksh 600,000
Kanusin Dispensary
- location
-
Kanusin
(in Sotik)
- year first funded
- 2003
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 487,500
- estimate
- Ksh 537,000
Siroin secondary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2005
- action
- Classroom Construction
- output
- 2 classrooms complete
- implementation status
- Ongoing
- total cost
- Ksh 480,000
- estimate
- Ksh 600,000
Kapkoitim secondary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 475,000
- estimate
- Ksh 1,900,000
Tembwo location
- location
-
Tembwo
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 470,000
- estimate
- Ksh 500,000
Mabwaita primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 462,000
- estimate
- Ksh 600,000
Sigorian secondary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Lab Construction
- output
- 1 lab room
- implementation status
- Ongoing
- total cost
- Ksh 461,938
- estimate
- Ksh 2,000,000
Leldaet primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 2 acre piece of land
- implementation status
- complete
- total cost
- Ksh 460,000
- estimate
- Ksh 500,000
Chemagel Water project
- location
-
Chemagel
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Kapkesembe primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Leldok primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
Ngurwo primary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2003
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
Sotik primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2005
- action
- 1 Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Chesilyot girls primary
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Kipsiwon primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 1.5 acre piece of land
- implementation status
- complete
- total cost
- Ksh 450,000
- estimate
- Ksh 600,000
Tabarit Dispensary
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- complete
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Balek secondary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- Ongoing
- total cost
- Ksh 440,000
- estimate
- Ksh 600,000
Chebugon primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2003
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- Complete
- total cost
- Ksh 437,500
- estimate
- Ksh 700,000
Kapchumbei secondary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- Improve learning
- implementation status
- Ongoing
- total cost
- Ksh 436,875
- estimate
- Ksh 600,000
Saruchat primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 2 classrooms are ongoing
- implementation status
- Ongoing
- total cost
- Ksh 434,000
- estimate
- Ksh 954,000
Kiptamoitaa primary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 430,000
- estimate
- Ksh 600,000
chebango primary School
- location
-
kiptulwa
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 425,000
- estimate
- Ksh 600,000
Cheboet primary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms complete
- implementation status
- complete
- total cost
- Ksh 425,000
- estimate
- Ksh 900,000
Kapchepkosiom primary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2006
- action
- Roofing
- output
- Roofing of 2 classrooms
- implementation status
- Complete
- total cost
- Ksh 420,000
- estimate
- Ksh 500,000
Kapolenyore primary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 413,599
- estimate
- Ksh 600,000
Gorgor primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 413,000
- estimate
- Ksh 600,000
Tendonok primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Chebilat chief’s office
- location
-
Chebilat
(in Sotik)
- year first funded
- 2006
- action
- Office construction
- output
- 2 rooms complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Kamungei Adm office
- location
-
Kamungei
(in Sotik)
- year first funded
- 2008
- action
- Chief’s office construction
- output
- 2 room complete and in use
- implementation status
- compele
- total cost
- Ksh 400,000
- estimate
- Ksh 3,000,000
Chebulu primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 2 acre piece of land
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Chesambai primary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Balek Primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Solyot primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kibibo primary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2005
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kinyelwet primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Chororoita primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Chebitet primary School+E3965
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,050,000
Chepkalwal primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2003
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapchepkosiom primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- 2 Classrooms construction
- output
- 1 classroom complete & 1 is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Kipketii primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 900,000
Changina primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Burgei cattle dip
- location
-
Tembwo
(in Sotik)
- year first funded
- 2007
- action
- Roofing, path and paddock construction
- output
- Dip being used
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Tarakwa poly
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Class room Construction
- output
- 2 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Ndanai poly
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Class room Construction
- output
- 2 classrooms complete
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Chebilat locartion
- location
-
Chebilat
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
St joseph mabwaita secondary sc
- location
-
Manaret
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Kapmugeno primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Land Buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 388,081
- estimate
- Ksh 900,000
Burgei primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- 1 Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 380,000
- estimate
- Ksh 600,000
Ngocho primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 1.5 acre piece of land
- implementation status
- complete
- total cost
- Ksh 380,000
- estimate
- Ksh 700,000
Kamaronga primary School
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Complete
- total cost
- Ksh 370,000
- estimate
- Ksh 600,000
Kapmabwai primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 360,000
- estimate
- Ksh 600,000
Tabarit primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 353,599
- estimate
- Ksh 600,000
Chebole primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Serwet primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 350,000
- estimate
- Ksh 600,000
togomin secondary School
- location
-
chebilat
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 350,000
- estimate
- Ksh 1,000,000
Chebilat Dispensary
- location
-
Manaret
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room complete
- implementation status
- complete
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Kaptepangwo Dispensary
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- complete
- total cost
- Ksh 334,833
- estimate
- Ksh 500,000
Chepkebit primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 334,000
- estimate
- Ksh 600,000
Cheptebe primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete & 2 are ongoing
- implementation status
- Ongoing
- total cost
- Ksh 334,000
- estimate
- Ksh 500,000
Kiptenden primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 2 classrooms are ongoing
- implementation status
- Ongoing
- total cost
- Ksh 334,000
- estimate
- Ksh 404,000
Kiprobonyit primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 331,000
- estimate
- Ksh 600,000
Chebole secondary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 2,000,000
Tembwo primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- 1 Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 320,000
- estimate
- Ksh 600,000
Kenene primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2005
- action
- 1 Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 320,000
- estimate
- Ksh 600,000
Saruchat Dispensary
- location
-
Rongena
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 316,000
- estimate
- Ksh 500,000
Koiyet primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 310,000
- estimate
- Ksh 600,000
Samoe primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 305,968
- estimate
- Ksh 600,000
kaboruso /Koluu primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 302,000
- estimate
- Ksh 800,000
Lalwa primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 300,601
- estimate
- Ksh 600,000
Chebango Dispensary
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Staff house construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 750,000
Ngariet primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2008
- action
- Classroom construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 800,000
Kaplombo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
N/A
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Land Buying
- output
- 2.5 acre piece of land
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 700,000
Chesilyotmixed primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Sironet Water project
- location
-
Kamungei
(in Sotik)
- year first funded
- 2004
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tembwo cattle dip
- location
-
Tembwo
(in Sotik)
- year first funded
- 2007
- action
- Roofing and path construction
- output
- Dip being used
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Sotik access roads
- location
-
Chemagel
(in Sotik)
- year first funded
- 2008
- action
- Spot patching
- output
- Usable foot bridge
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kamenes primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 290,199
- estimate
- Ksh 600,000
Kesogororet primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 290,000
- estimate
- Ksh 600,000
Yaganek Dispensary
- location
-
Kaplong
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 290,000
- estimate
- Ksh 400,000
Burgei Dispensary
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 284,833
- estimate
- Ksh 400,000
Ngamurian primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- Ongoing
- total cost
- Ksh 284,000
- estimate
- Ksh 600,000
Motiret primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 280,000
- estimate
- Ksh 600,000
Kapkures secondary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 277,750
- estimate
- Ksh 3,000,000
Mogoiywet primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 275,000
- estimate
- Ksh 600,000
Manaret Electrification
- location
-
Manaret
(in Sotik)
- year first funded
- 2004
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 270,000
- estimate
- Ksh 300,000
Gelegele primary School
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- 1 Classroom construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 270,000
- estimate
- Ksh 570,000
Kelonget primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 2 classrooms complete
- implementation status
- Ongoing
- total cost
- Ksh 265,000
- estimate
- Ksh 600,000
Chesilyot girls secondary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 260,000
Chebole cooler plant
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Cooler construction
- output
- Installation of cooler plant
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 500,000
Ndanai cooler plant
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Cooler construction
- output
- Installation of cooler plant
- implementation status
- Complete
- total cost
- Ksh 260,000
- estimate
- Ksh 500,000
Ndanai health centre
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 260,000
- estimate
- Ksh 500,000
saruchat secondary School
- location
-
tembwo
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kipsonoi secondary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Leketetiet primary School
- location
-
kiptulwa
(in Sotik)
- year first funded
- 2008
- action
- Classroom construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 800,000
Ndanai primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 2 classrooms build
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kapcherire primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Sironet primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 600,000
Sosur primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kapsangaru primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2004
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 5,000,000
Tembwo girls water supply
- location
-
Tembwo
(in Sotik)
- year first funded
- 2007
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 800,000
Likya/tarakwa tea buying
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 300,000
Blue gum Bridge
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Bridge construction
- output
- Usable foot bridge
- implementation status
- ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Koikapmaa bridge
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Bridge construction
- output
- No work done
- implementation status
- ongoing
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Kaplelach Water project
- location
-
Gelegele
(in Sotik)
- year first funded
- 2004
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 244,000
- estimate
- Ksh 244,000
Solyot dispensary
- location
-
Kanusin
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 242,000
- estimate
- Ksh 600,000
Kiptorbei primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2003
- action
- Land buying
- output
- 1 acre piece of land
- implementation status
- Complete
- total cost
- Ksh 237,500
- estimate
- Ksh 900,500
Kagasik secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- Improve learning
- implementation status
- Ongoing
- total cost
- Ksh 231,938
- estimate
- Ksh 600,000
Chesambai DamWater
- location
-
Abosi
(in Sotik)
- year first funded
- 2004
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 230,000
- estimate
- Ksh 300,000
Makitui primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 220,199
- estimate
- Ksh 500,000
Kanusin primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 220,000
- estimate
- Ksh 600,000
Koiyet Water project
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 210,000
- estimate
- Ksh 1,000,000
Ching’ondi primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 210,000
- estimate
- Ksh 600,000
Ndanai DO offices
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- DO’s office Construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 210,000
- estimate
- Ksh 500,000
Kapsiongo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 1.5 acre piece of land
- implementation status
- complete
- total cost
- Ksh 210,000
- estimate
- Ksh 800,000
chesegem primary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kapsiongo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kipajit chiefs office
- location
-
Chemagel
(in Sotik)
- year first funded
- 2008
- action
- Chief’s office construction
- output
- 2 rooms constracted
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kapletundo location
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Mutereriet dispensary
- location
-
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 700,000
Muiywek Dispensary
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Ngenda moi segutiet chemutwa dip road
- location
-
kimolwet
(in Sotik)
- year first funded
- 2007
- action
- Spot patching
- output
- Usable foot bridge
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Kesoggoret/kapletundo
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2004
- action
- Soil Maintenance
- output
- Trees planting
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Nalep Soil Conserva.
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2004
- action
- Soil conservation
- output
- Trees planting
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Keronjo Poly
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2005
- action
- Classroom Construction
- output
- 1 classroom complete
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Abosi Hill view Primary
- location
-
Abosi
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 2 classrooms are under construction
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Chepkeigei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 2 classrooms build
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Ndanai small home primary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Nyaga primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
Koimugul primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
Njorwet primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Tarakwa primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Sigorian dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 195,000
- estimate
- Ksh 400,000
Kapkures Dispensary
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Staff house construction
- output
- 2 rooms complete
- implementation status
- Ongoing
- total cost
- Ksh 192,000
- estimate
- Ksh 950,000
Kapchumbe dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 190,000
- estimate
- Ksh 400,000
Kamegunyet primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 190,000
- estimate
- Ksh 600,000
Chebui primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 190,000
- estimate
- Ksh 500,000
Korongoro primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 180,000
- estimate
- Ksh 600,000
Kimolwet dispensary
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2006
- action
- Equipment of maternity ward supply
- output
- Equipping maternity ward
- implementation status
- complete
- total cost
- Ksh 170,000
- estimate
- Ksh 170,000
Cheplelwo dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 170,000
- estimate
- Ksh 250,000
Tiriitap moita primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 167,050
- estimate
- Ksh 600,000
Takitech primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 167,050
- estimate
- Ksh 600,000
Sigorian primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 165,000
- estimate
- Ksh 600,000
Manaret primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 162,000
- estimate
- Ksh 1,000,000
Ngurwo dam
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 160,000
- estimate
- Ksh 1,750,000
oldebesi primary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Manaret primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Sumoni primary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kapletundo primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Tapkosiom Water project
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kaplombo development centre
- location
-
Abosi
(in Sotik)
- year first funded
- 2007
- action
- Office Construction
- output
- 5 rooms to be build
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Manyatta tea buying
- location
-
Chemagel
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Kipsimbol dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Kapkelei dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Chebilat polytechnic
- location
-
Chebilat
(in Sotik)
- year first funded
- 2006
- action
- Class room Construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
tembwet primary School
- location
-
kapletundo
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- new
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kapnyasimba primary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Ririk primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 800,000
Tabeituk primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 900,000
Sasita primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Kapburgei primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 800,000
Kapchemibei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Sumeek primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 600,000
Oldabach primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Muiywek primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 1,000,000
Sugurusiek primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- ongoing
- implementation status
- Ongoing
- total cost
- Ksh 150,000
- estimate
- Ksh 319,000
Kagasik Electrification
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 140,000
- estimate
- Ksh 300,000
Mariko primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Land Buying
- output
- 1 acre piece of land
- implementation status
- complete
- total cost
- Ksh 140,000
- estimate
- Ksh 700,000
Oldebesi dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 400,000
Motiret dispensary
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 140,000
- estimate
- Ksh 250,000
Chilgotwet primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 137,000
- estimate
- Ksh 300,000
Rotik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 135,599
- estimate
- Ksh 600,000
Chepkeigei Water project
- location
-
Gelegele
(in Sotik)
- year first funded
- 2004
- action
- Desilting
- output
- More water
- implementation status
- Completed
- total cost
- Ksh 132,900
- estimate
- Ksh 170,000
chepkolon Pre primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- new
- total cost
- Ksh 131,000
- estimate
- Ksh 500,000
Chepkosigen primary School
- location
-
Tembwo
(in Sotik)
- year first funded
- 2007
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 130,000
- estimate
- Ksh 900,000
Kapkesembe Water
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 130,000
- estimate
- Ksh 130,000
Kiricha primary School
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 120,000
- estimate
- Ksh 700,000
Kiricha primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 120,000
- estimate
- Ksh 600,000
Kagasik Dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- complete
- total cost
- Ksh 120,000
- estimate
- Ksh 400,000
Tuiyotich primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 115,200
- estimate
- Ksh 600,000
Tabarit Water project
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Keseswa Water project
- location
-
Chemagel
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 110,000
- estimate
- Ksh 250,000
Chebilbait /SosurWater project
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 110,000
- estimate
- Ksh 110,000
Keseswa water project
- location
-
chemagel
(in Sotik)
- year first funded
- 2009
- action
- tank repair
- output
- tank repair
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kamabwai primary School
- location
-
ndanai
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
kapkoitim secondary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Kanusin Location
- location
-
Kanusin
(in Sotik)
- year first funded
- 2005
- action
- Chief’s office construction
- output
- complete
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Rotik secondary School
- location
-
ndanai
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Sotik primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Cheserton primary School
- location
-
Tembwo
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiprobonyit primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kapcherire primary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kapkesembe dispen
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ceptangulgei primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
ngamurian primary School
- location
-
rongena
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
bambanik primary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
st joseph mambwaita sec
- location
-
Manaret
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
kapletundo Dos Office
- location
-
kapletundo
(in Sotik)
- year first funded
- 2009
- action
- Room construction
- output
- 2 rooms constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
saruchat primary School
- location
-
Tembwo
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngendalel primary School
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 2,000,000
Soimosiek primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Kamureito primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Kaptulwo primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Kapkures primary School
- location
-
Kiptulwo
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Moita primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 1,000,000
Soiyoit primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Burgei poly
- location
-
tembwo
(in Sotik)
- year first funded
- 2007
- action
- Purchase of land
- output
- 2 acres piece of land
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
sumoni foot bridge
- location
-
manaret
(in Sotik)
- year first funded
- 2009
- action
- Spot patching
- output
- Usable foot bridge
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Chepkeigei Dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Monire dispensary
- location
-
Chebilat
(in Sotik)
- year first funded
- 2007
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 800,000
Sumeek Tea Buying
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Keronjo Tea Buying
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2005
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Bluegum Tea Buying
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2005
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
chesugumer tea BC
- location
-
kapletundo
(in Sotik)
- year first funded
- 2009
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
kipkurion cattle Dip
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2009
- action
- Roofing
- output
- Dip being used
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
kakures cattle dip
- location
-
kiptulwa
(in Sotik)
- year first funded
- 2009
- action
- Roofing
- output
- Dip being used
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kiptenden DamWater
- location
-
Abosi
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mogoiywek water project
- location
-
manaret
(in Sotik)
- year first funded
- 2008
- action
- Piping system
- output
- New
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Gelegele Electrification
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Kameswon primary Electr
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2004
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 300,000
Ndanai poly
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tarakwa poly (Biogas)
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chebilat polytechnic
- location
-
Chebilat
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiptulwa Location
- location
-
Kiptulwa
(in Sotik)
- year first funded
- 2005
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Chemagel location
- location
-
chemagel
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Manaret location
- location
-
manaret
(in Sotik)
- year first funded
- 2007
- action
- Chief’s office construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Kimase primary School
- location
-
Chemagel
(in Sotik)
- year first funded
- 2006
- action
- Toilet construction
- output
- 3 toilet co
- implementation status
- funded under emergency
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Rongena chiefs office
- location
-
Rongena
(in Sotik)
- year first funded
- 2006
- action
- Chief’s office Construction
- output
- complete a 2 room structure
- implementation status
- Ongoing
- total cost
- Ksh 96,027
- estimate
- Ksh 500,000
Kapcherire Tea Buy
- location
-
Kamungei
(in Sotik)
- year first funded
- 2003
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 92,713
- estimate
- Ksh 300,000
Rongena primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 80,000
- estimate
- Ksh 300,000
Chebilat /SosurWater
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Tank construction
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 80,000
- estimate
- Ksh 80,000
Kapkelei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 80,000
- estimate
- Ksh 300,000
Rongena/ngariet
- location
-
Rongena
(in Sotik)
- year first funded
- 2006
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 75,000
- estimate
- Ksh 5,000,000
Kagasik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2004
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 600,000
Kiricha dispensary
- location
-
Kapkelei
(in Sotik)
- year first funded
- 2004
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 70,000
- estimate
- Ksh 250,000
Kisabei primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 62,000
- estimate
- Ksh 300,000
Chebinyiny tea buying
- location
-
Chemagel
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 500,000
Kesogororet Tea Buy
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 60,000
- estimate
- Ksh 300,000
Muiywet Water project
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 60,000
- estimate
- Ksh 600,000
kapkotim primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Atebwo lelechwet kipketii bridge
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- bridge construction
- output
- bridge construction
- implementation status
- complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kamenes primary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kaptebengwa dispensary
- location
-
tembwo
(in Sotik)
- year first funded
- 2009
- action
- Room construction
- output
- Roofing
- implementation status
- complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
ririk nursery School
- location
-
kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Oldepesi primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Classroom construction
- output
- 1 classroom complete
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 200,000
Kapkoros primary School
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Classroom construction
- output
- 1 classrooms is ongoing
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
sisei primary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Class room Construction
- output
- 1 classroom is under construction
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Sach angan – kiramut – uswet primary – cherumbas road
- location
-
kimolwet
(in Sotik)
- year first funded
- 2007
- action
- Spot patching
- output
- Usable foot bridge
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 400,000
Kipsingei dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 250,000
Mariko dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Medical room Construction
- output
- 1 room is under construction
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 250,000
Kibisorwet Tea Buy
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kaplelach tea buying
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kapchumbe tea buying
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kelonget tea buying
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kenegut tea buying
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kapletundo tea buying
- location
-
kapletundo
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Kapacha tea buying
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Koiyet tea buying
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 500,000
Arorwet Water project
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 700,000
Kamaero Water project
- location
-
Kapletundo
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 50,000
- estimate
- Ksh 300,000
Kambira primary School
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2006
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mabwaita primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2006
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kamungei secondary School
- location
-
Kamungei
(in Sotik)
- year first funded
- 2006
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 100,000
Kimolwet primary School
- location
-
Kimolwet
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Soyoit TBC
- location
-
Kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Kamungei youth poly
- location
-
Kamungei
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
kagasik secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2008
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
sotik health centre
- location
-
Sotik
(in Sotik)
- year first funded
- 2009
- action
- Toilet construction
- output
- 2 toilets constructed
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Ndanai Water project
- location
-
Ndanai
(in Sotik)
- year first funded
- 2005
- action
- Piping system
- output
- Pipes installed
- implementation status
- Ongoing
- total cost
- Ksh 45,000
- estimate
- Ksh 1,000,000
Kenene primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Chenyunyut Dam
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 40,000
- estimate
- Ksh 300,000
Korongoro dam
- location
-
Gelegele
(in Sotik)
- year first funded
- 2005
- action
- Desilting
- output
- More water
- implementation status
- Ongoing
- total cost
- Ksh 40,000
- estimate
- Ksh 400,000
Koimugul primary School
- location
-
tarakwa
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kokwon primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Mabwaita primary School
- location
-
Manaret
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Leldaet primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Sumoni primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Chebitet primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kapchepkosiom primary School
- location
-
Kanusin
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Samoe primary School
- location
-
Tarakwa
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kamegunyet primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kiptenden primary Ch
- location
-
Rongena
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kiricha primary School
- location
-
Rongena
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Korongoro primary School
- location
-
Abosi
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kelonget primary School
- location
-
gelegele
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Sugutek primary School
- location
-
abosi
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kapsosurwa primary School
- location
-
abosi
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Sertwet primary School
- location
-
abosi
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Lelechwet primary School
- location
-
kamungei
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Tamongo primary School
- location
-
kimolwet
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kaptilolwo primary School
- location
-
kapletundo
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Togomin primary School
- location
-
chebilat
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kibori Secondary School
- location
-
chemagel
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Motiret Secondary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Sigorian Secondary School
- location
-
kapkelei
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Kipsimbol Secondary School
- location
-
gelegele
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Solyot Secondary School
- location
-
kanusin
(in Sotik)
- year first funded
- 2008
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 40,000
- estimate
- Ksh 40,000
Ngariet secondary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Saruchat dispensary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Tarakwa dispensary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 50,000
Rongena primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Tembwo girls sec
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
chesilyot girls primary
- location
-
kapletundo
(in Sotik)
- year first funded
- 2009
- action
- elctricity supply
- output
- electricity installation
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 32,500
Burgei primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Rongena health centre
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kaptebengwo dispensary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Burgei dispensary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Chebilat dispensary
- location
-
Sotik
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Emityot assist chiefs office
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Leldok primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Chemogoi primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kinyelwet primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kiptulwa primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kameswon primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Chororoita primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Sugurusiek primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kipketii primay School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Molinga primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Solyot primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Changina primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Tarakwa primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Njorwet primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kanusin primary School
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
D.O Office
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kipsingei secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Rotik secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kapkelei secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Gelegele secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kaplomboi primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Gorgor Dispensary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Rotik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Ndanai health centre
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Mariko primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kamugeno primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Sigorian secondary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Oldepesi primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Motiret primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Bambanik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kelonget primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kamegunyet primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kipsingei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Mososnik primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kapkelei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kapsosurwo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Chesambai primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kaplelach primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kipsimbol primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Gelegele primary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Sugutek primary
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Kapchemibei primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Ngurwo primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Tabarit primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Gorgor primary School
- location
-
Ndanai
(in Sotik)
- year first funded
- 2006
- action
- Electric power supply
- output
- Electric power conection
- implementation status
- Ongoing
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Cheserton primary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Chepkebit primary
- location
-
Mutarakwa
(in Sotik)
- year first funded
- 2006
- action
- Solar power supply
- output
- Solar power conection
- implementation status
- complete
- total cost
- Ksh 32,500
- estimate
- Ksh 35,000
Nyatembe tea buying
- location
-
Chemagel
(in Sotik)
- year first funded
- 2006
- action
- Shade Construction
- output
- 1 Shade Constructed
- implementation status
- Complete
- total cost
- Ksh 30,000
- estimate
- Ksh 500,000