The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Subukia

J Kariuki Secondary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Toiletes & Classrooms
output
High Enrolment Of Students
implementation status
One Toilet Block & Six Classrooms Complete
total cost
Ksh 3,761,334
estimate
Ksh 4,500,000

Dundori Rural Dispensary Kiamunyek

location
Dundori (in Subukia)
year first funded
2006
action
Purchase & Equipping
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 3,500,000
estimate
Ksh 4,500,000

Nyakiambi Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 3,350,000
estimate
Ksh 4,000,000

Maryland Secondary School

location
Subukia (in Subukia)
year first funded
2004
action
Construction Of Two Toilet Blocks & Three Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 2,870,000
estimate
Ksh 2,500,000

Moi Ndeffo Secondary School

location
Bahati (in Subukia)
year first funded
2004
action
Equipping Lab. & Construction Of Dormitory
output
Improve Quality Of Education
implementation status
Equipping Complete
total cost
Ksh 2,400,000
estimate
Ksh 1,800,000

Subukia Polytechnic

location
Subukia (in Subukia)
year first funded
2004
action
Rehabilitation & Construction Of Domitories
output
Improve Quality Of Education
implementation status
Rehabilitatioon Complete
total cost
Ksh 2,400,000
estimate
Ksh 3,000,000

Engoshura Dispensary

location
Bahati (in Subukia)
year first funded
2004
action
Construction
output
Improving Health Care
implementation status
Not Complete
total cost
Ksh 2,307,166
estimate
Ksh 2,000,000

Muriundu Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Tank & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 2,200,000
estimate
Ksh 2,500,000

Kiamaina Police Post

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Police Post
output
Improving Security
implementation status
Not Complete
total cost
Ksh 2,200,000
estimate
Ksh 3,000,000

Tetu Primary School

location
Subukia (in Subukia)
year first funded
2004
action
Rehabilitaion Of Eight Classrooms & Construction Of Admn. Block
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 2,005,000
estimate
Ksh 2,000,000

Subukia Health Centre

location
Subukia (in Subukia)
year first funded
2003
action
Construction Of A Ward
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 1,850,000
estimate
Ksh 2,000,000

Arash Primary School

location
Subukia (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,825,000
estimate
Ksh 2,000,000

Morro Hill Primary School

location
Subukia (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,825,000
estimate
Ksh 2,000,000

Dundori Police Post

location
Dundori (in Subukia)
year first funded
2004
action
Construction Of Police Post
output
Improving Security
implementation status
Not Complete
total cost
Ksh 1,800,000
estimate
Ksh 2,000,000

Engoshura Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Four Classrooms Completed
total cost
Ksh 1,773,000
estimate
Ksh 1,500,000

Kabazi Health Centre

location
Kabazi (in Subukia)
year first funded
2003
action
Renovation Of Hospital & Construction Of Vct
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 1,750,000
estimate
Ksh 3,000,000

Nakuru Workers Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Completed
total cost
Ksh 1,750,000
estimate
Ksh 1,350,000

Ndeffo Community Water Project

location
Bahati (in Subukia)
year first funded
2005
action
Construction Of Tank & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,700,000
estimate
Ksh 1,500,000

Bahati Health Centre

location
Bahati (in Subukia)
year first funded
2003
action
Construction Of Theater
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 1,690,000
estimate
Ksh 2,000,000

St. Francis Primary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,650,000
estimate
Ksh 1,750,000

Kieni Secondary School

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of One Classroom And Domitories
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 1,600,000
estimate
Ksh 2,000,000

Dundori Primary School

location
Dundori (in Subukia)
year first funded
2004
action
Completion Of Two & Construction Of Five Classrooms
output
High Enrolment Of Students
implementation status
Seven Classrooms Complete
total cost
Ksh 1,594,177
estimate
Ksh 1,250,000

Maombi Primary School

location
Kabazi (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,550,000
estimate
Ksh 1,500,000

Kabatini Engoshura Water Project

location
Bahati (in Subukia)
year first funded
2003
action
Rehabilitation Of Bore Hole & Purchase Of Pipes
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,520,000
estimate
Ksh 2,000,000

Kiamaina Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Three Classrooms Completed
total cost
Ksh 1,484,486
estimate
Ksh 2,000,000

Kamemo Primary School

location
Kabazi (in Subukia)
year first funded
2004
action
Construction Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,441,000
estimate
Ksh 1,500,000

Edgewood/Kagochi Water Project

location
Kabazi (in Subukia)
year first funded
2004
action
Construction Of Tank, Piping & Pump
output
Improve Living Standard
implementation status
Tank & Pining Complete
total cost
Ksh 1,425,000
estimate
Ksh 2,000,000

Mwereri Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,410,000
estimate
Ksh 1,500,000

Bahati Jisaidie Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,410,000
estimate
Ksh 1,500,000

Tabuga Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Four Classrooms
output
High Enrolment Of Students
implementation status
Two Classrooms Complete
total cost
Ksh 1,375,186
estimate
Ksh 1,000,000

Kabazi Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Rehabilitation Two Classrooms
output
Improve Hygiene
implementation status
Complete
total cost
Ksh 1,373,824
estimate
Ksh 1,000,000

Ithagani Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Three Complete
total cost
Ksh 1,340,000
estimate
Ksh 1,500,000

Wanyororo Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Three Classrooms
output
High Enrolment Of Students
implementation status
Two Classrooms Complete
total cost
Ksh 1,315,000
estimate
Ksh 1,000,000

Stanthony Secondary School

location
Bahati (in Subukia)
year first funded
2003
action
Construction Of Laboratory
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 1,300,000
estimate
Ksh 1,100,000

Kagochi/Wei Water Project

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Tank & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,272,166
estimate
Ksh 1,600,000

Nyathuna Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 1,300,000

Stlwanga Primary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Two Toilets Blocks & One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,250,000
estimate
Ksh 1,500,000

Bahati PSecondary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Of Laboratory
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 1,220,000
estimate
Ksh 1,500,000

Mburu Gichua Primary School

location
Kabazi (in Subukia)
year first funded
2004
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,000,000

Wei Secondary School

location
Subukia (in Subukia)
year first funded
2004
action
Construction Of Examination Block
output
Improve Quality Of Education
implementation status
Two Complete
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Wei Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,200,000
estimate
Ksh 1,500,000

Dundori Health Centre

location
Dundori (in Subukia)
year first funded
2003
action
Construction Of A Ward
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Ikiriro Karunga Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Intake & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,200,000
estimate
Ksh 2,500,000

Oldonyo Mara Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,000,000

Lamunyodeki Water Project

location
Lanet (in Subukia)
year first funded
2008
action
Drilling Of Bore Hole
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,000,000

StSecondary School

location
Bahati (in Subukia)
year first funded
2003
action
Completion Of Storey Classrooms & Purchase Of Land
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Muringa Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,200,000

Posho Mill Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Tank & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,500,000

Munyaka Primary School

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Lanet Umoja Primary School

location
Dundori (in Subukia)
year first funded
2004
action
Completion Of Four Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,100,000
estimate
Ksh 1,000,000

Mikeu Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Computer Room
output
High Enrolment Of Students
implementation status
Not Complete
total cost
Ksh 1,090,000
estimate
Ksh 1,000,000

Kamumo Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,080,000
estimate
Ksh 1,000,000

Murunyu Secondary School

location
Lanet (in Subukia)
year first funded
2008
action
Construction Of 0Ne Classrooms
output
High Enrolment Of Students
implementation status
Phase One Complete
total cost
Ksh 1,050,000
estimate
Ksh 1,000,000

Menengai Hill Primary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,050,000
estimate
Ksh 900,000

Kabatini Health Centre

location
Bahati (in Subukia)
year first funded
2004
action
Extension Of Hospital
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 1,030,000
estimate
Ksh 2,000,000

Munanda/Kirima Water Project

location
Kabazi (in Subukia)
year first funded
2003
action
Construction Of Tank, Puchase Of Pipes & Pump
output
Improve Living Standard
implementation status
Phase I & Ii Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Murungaru Secondary School

location
Bahati (in Subukia)
year first funded
2006
action
Construction Of Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Kabazi Secondary School

location
Kabazi (in Subukia)
year first funded
2008
action
Construction Of Science Laboratory
output
High Enrolment Of Students
implementation status
Phase One Complete
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kagoto Primary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Of Toilets
output
Improve Sanitation
implementation status
Two Blocks Completed
total cost
Ksh 1,000,000
estimate
Ksh 900,000

Magomano Primary School

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 950,000
estimate
Ksh 800,000

Edgewood Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 903,000
estimate
Ksh 1,000,000

Nursery Water Project

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Water Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Dundori Secondary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Kitchen
output
Improve Hygiene
implementation status
Not Complete
total cost
Ksh 900,000
estimate
Ksh 600,000

Kamoronyo Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Roofing Of Two & Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Roofing Complete
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Bahati Girls Secondary School

location
Bahati (in Subukia)
year first funded
2003
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Mireroni Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of One Toilet Block & Rehabilitation Of Eight Classrooms
output
High Enrolment Of Students
implementation status
Toilet Block Complete
total cost
Ksh 871,000
estimate
Ksh 1,000,000

Green Hills Secondary School

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 870,000
estimate
Ksh 800,000

Kianyoro Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 860,000
estimate
Ksh 1,000,000

Mihango Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 860,000
estimate
Ksh 1,000,000

Amos Borehole

location
Bahati (in Subukia)
year first funded
2004
action
Purchase Of Water Pump & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 850,000
estimate
Ksh 1,500,000

Shirika Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Murunyu Weter Project

location
Lanet (in Subukia)
year first funded
2005
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 850,000
estimate
Ksh 1,500,000

Sidai Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction One Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 600,000

Kieni Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 600,000

Kiamaina Secondary School

location
Bahati (in Subukia)
year first funded
2005
action
Consturction Of A Kitchen
output
Improved Hygiene
implementation status
Not Complete
total cost
Ksh 850,000
estimate
Ksh 1,000,000

Bavuni Secondary School

location
Dundori (in Subukia)
year first funded
2005
action
Completion Of Library
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 850,000
estimate
Ksh 600,000

Wendani Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Rehabilitation Of Dam
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 831,486
estimate
Ksh 1,000,000

Chania Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 830,000
estimate
Ksh 800,000

Menengai Water Project

location
Dundori (in Subukia)
year first funded
2003
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 820,000
estimate
Ksh 1,500,000

Maili Kumi Market

location
Bahati (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 800,000
estimate
Ksh 0

Our Lady Of Mercy Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Four Storey Classrooms
output
High Enrolment Of Students
implementation status
Classrooms Not Complete
total cost
Ksh 800,000
estimate
Ksh 1,000,000

Dundori Youth Polytechnic

location
Dundori (in Subukia)
year first funded
2007
action
Electricity/Construction Of One Classroom
output
Better Education For Student
implementation status
Construction Complete
total cost
Ksh 784,000
estimate
Ksh 500,000

Kirengoro Water Project

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Intake
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 780,000
estimate
Ksh 1,000,000

Bahati Dispensary

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Injection Room
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Magomano Secondary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 750,000
estimate
Ksh 500,000

Kamiruri Community Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 733,486
estimate
Ksh 1,000,000

Bahati Primary School

location
Bahati (in Subukia)
year first funded
2006
action
Classrooms Renovation
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 730,000
estimate
Ksh 800,000

Bavuni Primary School

location
Dundori (in Subukia)
year first funded
2006
action
Construction Of One Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 728,000
estimate
Ksh 600,000

Kinari Primary School

location
Dundori (in Subukia)
year first funded
2004
action
Construction Of One Toilet Block & Rehabilitation Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 720,000
estimate
Ksh 1,000,000

Kianda Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
One Complete
total cost
Ksh 711,710
estimate
Ksh 1,000,000

Subukia Day Secondary School

location
Subukia (in Subukia)
year first funded
2005
action
Leveling Of Playground
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Rumathi Water Project

location
Bahati (in Subukia)
year first funded
2004
action
Constrution Of Intake
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Shakika Water Project

location
Subukia (in Subukia)
year first funded
2006
action
Construction Of Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 670,000
estimate
Ksh 1,000,000

Mariru Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Subukia Valley Kirima Water Project

location
Kabazi (in Subukia)
year first funded
2006
action
Purchase Of Pump
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Wei Dispensary

location
Subukia (in Subukia)
year first funded
2005
action
Extension Of Hospital
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 650,000
estimate
Ksh 2,000,000

Mugwathi Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 640,000
estimate
Ksh 1,000,000

Mombasa Village Polytechnic

location
Dundori (in Subukia)
year first funded
2008
action
Construction Of 1 Classroom
output
High Enrolment Of Students
implementation status
Not Complete
total cost
Ksh 620,525
estimate
Ksh 1,500,000

Mlimani Water Project

location
Kabazi (in Subukia)
year first funded
2004
action
Rehabilitation Of Tank & Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 620,000
estimate
Ksh 1,000,000

Kirima Kianoe Water Project

location
Subukia (in Subukia)
year first funded
2007
action
Tank Construction &Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 620,000
estimate
Ksh 1,500,000

Murungaru Primary School

location
Bahati (in Subukia)
year first funded
2005
action
Construction Of One Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 614,049
estimate
Ksh 1,000,000

Kenda Farm Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Tank & Intake
output
Improve Living Standard
implementation status
Phase I & Ii Complete
total cost
Ksh 608,166
estimate
Ksh 1,000,000

Kamuohi Cattle Dip

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Not Complete
total cost
Ksh 600,000
estimate
Ksh 800,000

Forest Hill Secondary School

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of Two Classroom
output
Improve Quality Of Education
implementation status
Not Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Gituamba Quarry Water Project

location
Bahati (in Subukia)
year first funded
2003
action
Purchase Of Pipes
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Bavuni Mugwathi Water Project

location
Dundori (in Subukia)
year first funded
2005
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Gatongu/Miloreni Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Intake & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Gitura/Gathira Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Rumwe Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Tank & Piping
output
Improve Living Standard
implementation status
Phase Ii Complete
total cost
Ksh 600,000
estimate
Ksh 1,500,000

Bishop Edward Donovan Secondary School

location
Lanet (in Subukia)
year first funded
2008
action
Construction Of 0Ne Classrooms
output
High Enrolment Of Students
implementation status
Phase One Complete
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Mugumo/Mlimani Water Project

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Windmill Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 594,588
estimate
Ksh 1,000,000

Murunyu Community Police Post

location
Lanet (in Subukia)
year first funded
2004
action
Construction Of Police Cells
output
Improving Health Care
implementation status
Phase I Complete
total cost
Ksh 550,000
estimate
Ksh 2,000,000

Gitura Health Centre

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of Dispensary
output
Improving Health Care
implementation status
Not Complete
total cost
Ksh 550,000
estimate
Ksh 3,000

Maombi Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Rehabilitation Of Bore Hole
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Manera/Gitario & Soweto Water Project

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Tank & Intake
output
Improve Living Standard
implementation status
Phase I & Ii Complete
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Nyonjoro Water Project

location
Lanet (in Subukia)
year first funded
2005
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Kandutura Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 550,000
estimate
Ksh 1,000,000

Kabazi Community Police Post

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Police Post
output
Improving Security
implementation status
Not Complete
total cost
Ksh 550,000
estimate
Ksh 2,000,000

Egdewood Police Post

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Police Post
output
Improving Security
implementation status
Not Complete
total cost
Ksh 517,000
estimate
Ksh 2,000,000

Jamatatu Dakagak Cattle Dip

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Ndege Karigi Water Project

location
Lanet (in Subukia)
year first funded
2008
action
Construction Of Water Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Mihango Kiharo Bridge

location
Subukia (in Subukia)
year first funded
2006
action
Construction Of A Bridge
output
Improve Transport
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 500,000

Menengai Community Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Limuko Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 550,000

Komu Water Project

location
Lanet (in Subukia)
year first funded
2008
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Kendurum Primary School

location
Bahati (in Subukia)
year first funded
2007
action
Frooring Of 3 Classrooms&Toilet
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 496,400
estimate
Ksh 500,000

Mihango Community Water Project

location
Subukia (in Subukia)
year first funded
2009
action
Borehole Equiping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 494,040
estimate
Ksh 1,500,000

Tabuga Borehole

location
Dundori (in Subukia)
year first funded
2004
action
Rehabilitation Of Bore Hole
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 460,000
estimate
Ksh 1,000,000

Karushwa Mai Mahiu Water Project

location
Dundori (in Subukia)
year first funded
2006
action
Construction Of Intake
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 459,166
estimate
Ksh 1,000,000

Mereroni Health Centre

location
Lanet (in Subukia)
year first funded
2009
action
Construction Of Admn. Block
output
Improving Health Care
implementation status
Phase I Notcomplete
total cost
Ksh 450,000
estimate
Ksh 2,000,000

Subukia Primary School

location
Subukia (in Subukia)
year first funded
2004
action
Construction Of One Toilet Block & Rehabilitation Of Computer Laboratory
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Subukia Umoja Water Project

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Dam & Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Mutito Water Project

location
Subukia (in Subukia)
year first funded
2006
action
Drilling Of Bore Hole
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 450,000
estimate
Ksh 1,500,000

Looremeta Primary School

location
Subukia (in Subukia)
year first funded
2005
action
Construction Of Two Classrooms
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 800,000

Upper Heshima Ndeffo Community Water Project

location
Bahati (in Subukia)
year first funded
2007
action
Plastering & Roofing Of Water Tank
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Limuko Water Project

location
Bahati (in Subukia)
year first funded
2007
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 433,000
estimate
Ksh 1,000,000

Bahati Forest Catchment Area

location
Bahati (in Subukia)
year first funded
2006
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 405,438
estimate
Ksh 500,000

Wei Police Post

location
Subukia (in Subukia)
year first funded
2008
action
Construction Of Police Post
output
Improving Security
implementation status
Not Complete
total cost
Ksh 400,000
estimate
Ksh 2,500,000

Subukia Valley Water Project

location
Kabazi (in Subukia)
year first funded
2003
action
Construction Of Tank & Intake
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 400,000
estimate
Ksh 1,000,000

St. Peters Water Project

location
Dundori (in Subukia)
year first funded
2006
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Githioro Water Project

location
Dundori (in Subukia)
year first funded
2006
action
Construction Of Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 400,000
estimate
Ksh 1,500,000

Mwiruti Primary School

location
Dundori (in Subukia)
year first funded
2005
action
Construction Of Toilets & Rehabilitation Of One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 400,000
estimate
Ksh 450,000

Muriundu Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of Toilet Blocks
output
Improve Sanitation
implementation status
Two Blocks Completed
total cost
Ksh 400,000
estimate
Ksh 450,000

Jirani Women Water Project

location
Bahati (in Subukia)
year first funded
2009
action
Construction Of Water Tank
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 381,000
estimate
Ksh 1,500,000

Dundori Location Enviromental Project

location
Dundori (in Subukia)
year first funded
2006
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 366,670
estimate
Ksh 500,000

Gitura Primary School

location
Kabazi (in Subukia)
year first funded
2006
action
Construction One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 360,000
estimate
Ksh 500,000

Our Lady Of Fatima Primary School

location
Bahati (in Subukia)
year first funded
2004
action
Construction Of One Classrooms
output
High Enrolment Of Students
implementation status
Completed
total cost
Ksh 360,000
estimate
Ksh 400,000

Kirengero Cattle Dip

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 350,000
estimate
Ksh 500,000

Dundori Nursary Ecd

location
Dundori (in Subukia)
year first funded
2009
action
Construction Of Class Rooms
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 500,000

Mireroni Secondary School

location
Lanet (in Subukia)
year first funded
2005
action
Construction & Equipping Of Computer Laboratory
output
High Enrolment Of Students
implementation status
Construction Complete
total cost
Ksh 350,000
estimate
Ksh 400,000

Kianyoro Cattle Dip

location
Subukia (in Subukia)
year first funded
2006
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 320,000
estimate
Ksh 500,000

Kirengero And Jumatatu Enviromental Project

location
Kabazi (in Subukia)
year first funded
2006
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 316,666
estimate
Ksh 500,000

Arash Kianyoro Bridge

location
Subukia (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Githioro Water Project

location
Dundori (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Mutitu Water Project

location
Subukia (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 300,000
estimate
Ksh 0

Baraka Community Electricity Project

location
Lanet (in Subukia)
year first funded
2008
action
Instalation Of A Transformer
output
Improve Living Standard
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Mihango Nguli Roads

location
Subukia (in Subukia)
year first funded
2008
action
Construction Of A Road
output
Improve Transport
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 500,000

Kabazi Public Toilet

location
Kabazi (in Subukia)
year first funded
2007
action
Toilet Construction
output
Improving Health Care
implementation status
Not Complete
total cost
Ksh 300,000
estimate
Ksh 400,000

Chania Kirima Water Project

location
Subukia (in Subukia)
year first funded
2008
action
Tank Construction
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Wendo Water Project

location
Bahati (in Subukia)
year first funded
2008
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Mwereri Secondary School

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of One Classroom
output
Improve Quality Of Education
implementation status
Not Complete
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Limuko Secondary School

location
Bahati (in Subukia)
year first funded
2009
action
Construction Of One Class
output
Improve Quality Of Education
implementation status
Not Complete
total cost
Ksh 300,000
estimate
Ksh 1,500,000

Muringa Ecd

location
Bahati (in Subukia)
year first funded
2009
action
Construction Of Class Rooms
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 500,000

Mumoi Primary School

location
Subukia (in Subukia)
year first funded
2006
action
Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 500,000

St. Josephs Kari Secondary School

location
Lanet (in Subukia)
year first funded
2008
action
Construction Of 0Ne Classrooms
output
High Enrolment Of Students
implementation status
Phase One Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Thayu Development Water Project

location
Bahati (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 297,166
estimate
Ksh 1,000,000

Kagochi /Wei Water Project

location
Subukia (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 270,000
estimate
Ksh 0

Jumatatu Farmers

location
Kabazi (in Subukia)
year first funded
2009
action
Buying Of Water Pumping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 270,000
estimate
Ksh 1,500,000

Githima Water Project

location
Dundori (in Subukia)
year first funded
2007
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Subukia Division Hq Toilet

location
Subukia (in Subukia)
year first funded
2008
action
Construction Of Toilet
output
Improving Security
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

Subukia Valley Cattle Dip

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

Moi Ndeffo Cattle Dip

location
Bahati (in Subukia)
year first funded
2006
action
Rehabilitation
output
Increase Livestock Production
implementation status
Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

Ruguru Muungano Water Project

location
Bahati (in Subukia)
year first funded
2009
action
Piping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Tuinuane Lanet Water Project

location
Lanet (in Subukia)
year first funded
2009
action
Borehole Equiping
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Wanyororo 'A' Water Project

location
Dundori (in Subukia)
year first funded
2005
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 250,000
estimate
Ksh 1,000,000

Ourlady F Victories Primary School

location
Subukia (in Subukia)
year first funded
2007
action
Construction Of One Classroom
output
High Enrolment Of Students
implementation status
Phase 1 Not Complete
total cost
Ksh 250,000
estimate
Ksh 500,000

Kihoto Cattle Dip

location
Kabazi (in Subukia)
year first funded
2005
action
Rehabilitation
output
Increase Livestock Production
implementation status
Complete
total cost
Ksh 230,000
estimate
Ksh 500,000

Arash Cattle Dip

location
Subukia (in Subukia)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Not Complete
total cost
Ksh 215,000
estimate
Ksh 500,000

Gitura Cattle Dip

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Munanda Cattle Dip

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Miloreni Cattle Dip

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Maombi Cattle Dip

location
Kabazi (in Subukia)
year first funded
2005
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Rumathi/Mwireri Water Project

location
Kabazi (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Matuto Water Project

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Intake
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Wanyororo Dam Water Project

location
Dundori (in Subukia)
year first funded
2004
action
Rehabilitation Of Dam
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kiamunyeki Community Water Project

location
Lanet (in Subukia)
year first funded
2006
action
Piping
output
Improve Living Standard
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 1,000,000

Kenda Cattle Dip

location
Kabazi (in Subukia)
year first funded
2007
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Kamburi Water Project

location
Dundori (in Subukia)
year first funded
2007
action
n/a
output
-
implementation status
not known
total cost
Ksh 190,000
estimate
Ksh 0

Bahati Upper Environmental Project

location
Bahati (in Subukia)
year first funded
2007
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 180,000
estimate
Ksh 500,000

Umoja Lanet Youth Group

location
Lanet (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 180,000
estimate
Ksh 500,000

Bahati Play Ground

location
Bahati (in Subukia)
year first funded
2006
action
Recreation
output
Improving Talents
implementation status
Not Complete
total cost
Ksh 166,666
estimate
Ksh 500,000

Morro And Mihango Hills Enviromental Project

location
Subukia (in Subukia)
year first funded
2006
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 164,909
estimate
Ksh 500,000

Ruguru Cattle Dip

location
Bahati (in Subukia)
year first funded
2008
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 160,000
estimate
Ksh 500,000

Karungo Pre-Unit

location
Subukia (in Subukia)
year first funded
2009
action
Rehabilitation
output
Improve Quality Of Education
implementation status
Complete
total cost
Ksh 160,000
estimate
Ksh 500,000

Subukia Play Ground

location
Subukia (in Subukia)
year first funded
2006
action
Recreation
output
Improving Talents
implementation status
Not Complete
total cost
Ksh 158,243
estimate
Ksh 500,000

Kerengero Police Post

location
Kabazi (in Subukia)
year first funded
2006
action
Construction Of Dog Kennel
output
Improving Health Care
implementation status
Not Complete
total cost
Ksh 150,000
estimate
Ksh 2,000,000

Ruguru Dispensary

location
Bahati (in Subukia)
year first funded
2009
action
Renovation
output
Improving Health Care
implementation status
Phase I Notcomplete
total cost
Ksh 150,000
estimate
Ksh 2,000,000

Murunyu Cattle Dip

location
Lanet (in Subukia)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Not Complete
total cost
Ksh 150,000
estimate
Ksh 500,000

Kamiruri Green Belt Tree Nursary

location
Bahati (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 142,930
estimate
Ksh 500,000

Morro Centre Bridge

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of A Bridge
output
Living Std Improvement
implementation status
Complete
total cost
Ksh 124,350
estimate
Ksh 200,000

Matano Bridge

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of A Bridge
output
Living Std Improvement
implementation status
Complete
total cost
Ksh 124,330
estimate
Ksh 200,000

Mihango Bridge

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of A Bridge
output
Living Std Improvement
implementation status
Complete
total cost
Ksh 124,330
estimate
Ksh 200,000

Mihianyo Bridge

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of A Bridge
output
Living Std Improvement
implementation status
Complete
total cost
Ksh 124,330
estimate
Ksh 200,000

Arash Bridge

location
Subukia (in Subukia)
year first funded
2009
action
Construction Of A Bridge
output
Living Std Improvement
implementation status
Complete
total cost
Ksh 124,330
estimate
Ksh 200,000

Subukia Youth Awake Yargd

location
Bahati (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 120,000
estimate
Ksh 500,000

Bavuni Cattle Dip

location
Dundori (in Subukia)
year first funded
2009
action
Rehabilitation Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Not Complete
total cost
Ksh 120,000
estimate
Ksh 500,000

Tetu Bridge

location
Subukia (in Subukia)
year first funded
2007
action
Construction Of A Bridge
output
Improve Transport
implementation status
Not Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

Mutundu Cattle Dip

location
Subukia (in Subukia)
year first funded
2006
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

Ndege Cattle Dip

location
Lanet (in Subukia)
year first funded
2006
action
Rehabilitation
output
Increase Livestock Production
implementation status
Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

Dundori Community Cattle Dip

location
Dundori (in Subukia)
year first funded
2006
action
Construction Of Cattle Dip
output
Increase Livestock Production
implementation status
Phase I Not Complete
total cost
Ksh 100,000
estimate
Ksh 500,000

Friends Of Bahati Forest

location
Bahati (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 90,000
estimate
Ksh 500,000

Kabazi Environmental Project

location
Kabazi (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 82,193
estimate
Ksh 500,000

Tushauriane Environmental Project

location
Kabazi (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 82,193
estimate
Ksh 500,000

Chania Kirima Water Project

location
Subukia (in Subukia)
year first funded
2008
action
Construction Of An Intake
output
Improve Living Standard
implementation status
Phase I Not Complete
total cost
Ksh 80,608
estimate
Ksh 1,000,000

Umoja Youth Group

location
Subukia (in Subukia)
year first funded
2008
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 80,000
estimate
Ksh 500,000

Dundori Disabled Envg

location
Dundori (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 68,772
estimate
Ksh 500,000

Subukia Disabled Envproject

location
Subukia (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 64,386
estimate
Ksh 500,000

Kianyoro Envproject

location
Subukia (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 64,386
estimate
Ksh 500,000

Kianoe General Focus E

location
Subukia (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 48,772
estimate
Ksh 500,000

Kahuho Envproject

location
Subukia (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 42,924
estimate
Ksh 500,000

Mugumo Envproject

location
Bahati (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 42,924
estimate
Ksh 500,000

Rugongo Environmental Youth Group

location
Kabazi (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 32,193
estimate
Ksh 500,000

Kabazi Plwha Elvironment Group

location
Kabazi (in Subukia)
year first funded
2009
action
Reaforestation
output
Improving Environment
implementation status
Not Complete
total cost
Ksh 32,193
estimate
Ksh 500,000