The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
J Kariuki Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Toiletes & Classrooms
- output
- High Enrolment Of Students
- implementation status
- One Toilet Block & Six Classrooms Complete
- total cost
- Ksh 3,761,334
- estimate
- Ksh 4,500,000
Dundori Rural Dispensary Kiamunyek
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Purchase & Equipping
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 4,500,000
Nyakiambi Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 3,350,000
- estimate
- Ksh 4,000,000
Maryland Secondary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Two Toilet Blocks & Three Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 2,870,000
- estimate
- Ksh 2,500,000
Moi Ndeffo Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Equipping Lab. & Construction Of Dormitory
- output
- Improve Quality Of Education
- implementation status
- Equipping Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 1,800,000
Subukia Polytechnic
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Rehabilitation & Construction Of Domitories
- output
- Improve Quality Of Education
- implementation status
- Rehabilitatioon Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 3,000,000
Engoshura Dispensary
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction
- output
- Improving Health Care
- implementation status
- Not Complete
- total cost
- Ksh 2,307,166
- estimate
- Ksh 2,000,000
Muriundu Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,500,000
Kiamaina Police Post
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Police Post
- output
- Improving Security
- implementation status
- Not Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 3,000,000
Tetu Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Rehabilitaion Of Eight Classrooms & Construction Of Admn. Block
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 2,005,000
- estimate
- Ksh 2,000,000
Subukia Health Centre
- location
-
Subukia
(in Subukia)
- year first funded
- 2003
- action
- Construction Of A Ward
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 1,850,000
- estimate
- Ksh 2,000,000
Arash Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,825,000
- estimate
- Ksh 2,000,000
Morro Hill Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,825,000
- estimate
- Ksh 2,000,000
Dundori Police Post
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Police Post
- output
- Improving Security
- implementation status
- Not Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Engoshura Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Four Classrooms Completed
- total cost
- Ksh 1,773,000
- estimate
- Ksh 1,500,000
Kabazi Health Centre
- location
-
Kabazi
(in Subukia)
- year first funded
- 2003
- action
- Renovation Of Hospital & Construction Of Vct
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 3,000,000
Nakuru Workers Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Completed
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,350,000
Ndeffo Community Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,500,000
Bahati Health Centre
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Theater
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 1,690,000
- estimate
- Ksh 2,000,000
St. Francis Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,750,000
Kieni Secondary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of One Classroom And Domitories
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,000,000
Dundori Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Completion Of Two & Construction Of Five Classrooms
- output
- High Enrolment Of Students
- implementation status
- Seven Classrooms Complete
- total cost
- Ksh 1,594,177
- estimate
- Ksh 1,250,000
Maombi Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,550,000
- estimate
- Ksh 1,500,000
Kabatini Engoshura Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Rehabilitation Of Bore Hole & Purchase Of Pipes
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,520,000
- estimate
- Ksh 2,000,000
Kiamaina Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Three Classrooms Completed
- total cost
- Ksh 1,484,486
- estimate
- Ksh 2,000,000
Kamemo Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2004
- action
- Construction Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,441,000
- estimate
- Ksh 1,500,000
Edgewood/Kagochi Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Tank, Piping & Pump
- output
- Improve Living Standard
- implementation status
- Tank & Pining Complete
- total cost
- Ksh 1,425,000
- estimate
- Ksh 2,000,000
Mwereri Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,410,000
- estimate
- Ksh 1,500,000
Bahati Jisaidie Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,410,000
- estimate
- Ksh 1,500,000
Tabuga Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Two Classrooms Complete
- total cost
- Ksh 1,375,186
- estimate
- Ksh 1,000,000
Kabazi Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Rehabilitation Two Classrooms
- output
- Improve Hygiene
- implementation status
- Complete
- total cost
- Ksh 1,373,824
- estimate
- Ksh 1,000,000
Ithagani Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Three Complete
- total cost
- Ksh 1,340,000
- estimate
- Ksh 1,500,000
Wanyororo Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Three Classrooms
- output
- High Enrolment Of Students
- implementation status
- Two Classrooms Complete
- total cost
- Ksh 1,315,000
- estimate
- Ksh 1,000,000
Stanthony Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Laboratory
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,100,000
Kagochi/Wei Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,272,166
- estimate
- Ksh 1,600,000
Nyathuna Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,300,000
Stlwanga Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Two Toilets Blocks & One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,500,000
Bahati PSecondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Laboratory
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 1,220,000
- estimate
- Ksh 1,500,000
Mburu Gichua Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Wei Secondary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Examination Block
- output
- Improve Quality Of Education
- implementation status
- Two Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
Wei Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,500,000
Dundori Health Centre
- location
-
Dundori
(in Subukia)
- year first funded
- 2003
- action
- Construction Of A Ward
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,000,000
Ikiriro Karunga Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Intake & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,500,000
Oldonyo Mara Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,000,000
Lamunyodeki Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Drilling Of Bore Hole
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,000,000
StSecondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Completion Of Storey Classrooms & Purchase Of Land
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Muringa Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Posho Mill Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,500,000
Munyaka Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
Lanet Umoja Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Completion Of Four Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
Mikeu Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Computer Room
- output
- High Enrolment Of Students
- implementation status
- Not Complete
- total cost
- Ksh 1,090,000
- estimate
- Ksh 1,000,000
Kamumo Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,080,000
- estimate
- Ksh 1,000,000
Murunyu Secondary School
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Construction Of 0Ne Classrooms
- output
- High Enrolment Of Students
- implementation status
- Phase One Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,000,000
Menengai Hill Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,050,000
- estimate
- Ksh 900,000
Kabatini Health Centre
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Extension Of Hospital
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 1,030,000
- estimate
- Ksh 2,000,000
Munanda/Kirima Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Tank, Puchase Of Pipes & Pump
- output
- Improve Living Standard
- implementation status
- Phase I & Ii Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Murungaru Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kabazi Secondary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2008
- action
- Construction Of Science Laboratory
- output
- High Enrolment Of Students
- implementation status
- Phase One Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kagoto Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Toilets
- output
- Improve Sanitation
- implementation status
- Two Blocks Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 900,000
Magomano Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 800,000
Edgewood Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 903,000
- estimate
- Ksh 1,000,000
Nursery Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Water Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Dundori Secondary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Kitchen
- output
- Improve Hygiene
- implementation status
- Not Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Kamoronyo Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Roofing Of Two & Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Roofing Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Bahati Girls Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Mireroni Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of One Toilet Block & Rehabilitation Of Eight Classrooms
- output
- High Enrolment Of Students
- implementation status
- Toilet Block Complete
- total cost
- Ksh 871,000
- estimate
- Ksh 1,000,000
Green Hills Secondary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 870,000
- estimate
- Ksh 800,000
Kianyoro Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 860,000
- estimate
- Ksh 1,000,000
Mihango Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 860,000
- estimate
- Ksh 1,000,000
Amos Borehole
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Purchase Of Water Pump & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,500,000
Shirika Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Murunyu Weter Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2005
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,500,000
Sidai Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction One Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 600,000
Kieni Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 600,000
Kiamaina Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Consturction Of A Kitchen
- output
- Improved Hygiene
- implementation status
- Not Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 1,000,000
Bavuni Secondary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Completion Of Library
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 600,000
Wendani Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Rehabilitation Of Dam
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 831,486
- estimate
- Ksh 1,000,000
Chania Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 830,000
- estimate
- Ksh 800,000
Menengai Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 820,000
- estimate
- Ksh 1,500,000
Maili Kumi Market
- location
-
Bahati
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Our Lady Of Mercy Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Four Storey Classrooms
- output
- High Enrolment Of Students
- implementation status
- Classrooms Not Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Dundori Youth Polytechnic
- location
-
Dundori
(in Subukia)
- year first funded
- 2007
- action
- Electricity/Construction Of One Classroom
- output
- Better Education For Student
- implementation status
- Construction Complete
- total cost
- Ksh 784,000
- estimate
- Ksh 500,000
Kirengoro Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Intake
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 780,000
- estimate
- Ksh 1,000,000
Bahati Dispensary
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Injection Room
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 2,000,000
Magomano Secondary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 500,000
Kamiruri Community Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 733,486
- estimate
- Ksh 1,000,000
Bahati Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Classrooms Renovation
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 730,000
- estimate
- Ksh 800,000
Bavuni Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Construction Of One Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 728,000
- estimate
- Ksh 600,000
Kinari Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Construction Of One Toilet Block & Rehabilitation Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 720,000
- estimate
- Ksh 1,000,000
Kianda Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- One Complete
- total cost
- Ksh 711,710
- estimate
- Ksh 1,000,000
Subukia Day Secondary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Leveling Of Playground
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Rumathi Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Constrution Of Intake
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Shakika Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 670,000
- estimate
- Ksh 1,000,000
Mariru Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Subukia Valley Kirima Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Purchase Of Pump
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 1,000,000
Wei Dispensary
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Extension Of Hospital
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 650,000
- estimate
- Ksh 2,000,000
Mugwathi Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 640,000
- estimate
- Ksh 1,000,000
Mombasa Village Polytechnic
- location
-
Dundori
(in Subukia)
- year first funded
- 2008
- action
- Construction Of 1 Classroom
- output
- High Enrolment Of Students
- implementation status
- Not Complete
- total cost
- Ksh 620,525
- estimate
- Ksh 1,500,000
Mlimani Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2004
- action
- Rehabilitation Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 1,000,000
Kirima Kianoe Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- Tank Construction &Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 620,000
- estimate
- Ksh 1,500,000
Murungaru Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2005
- action
- Construction Of One Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 614,049
- estimate
- Ksh 1,000,000
Kenda Farm Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank & Intake
- output
- Improve Living Standard
- implementation status
- Phase I & Ii Complete
- total cost
- Ksh 608,166
- estimate
- Ksh 1,000,000
Kamuohi Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Not Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Forest Hill Secondary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of Two Classroom
- output
- Improve Quality Of Education
- implementation status
- Not Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Gituamba Quarry Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2003
- action
- Purchase Of Pipes
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Bavuni Mugwathi Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Gatongu/Miloreni Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Intake & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Gitura/Gathira Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Rumwe Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank & Piping
- output
- Improve Living Standard
- implementation status
- Phase Ii Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Bishop Edward Donovan Secondary School
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Construction Of 0Ne Classrooms
- output
- High Enrolment Of Students
- implementation status
- Phase One Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 1,000,000
Mugumo/Mlimani Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Windmill Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 594,588
- estimate
- Ksh 1,000,000
Murunyu Community Police Post
- location
-
Lanet
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Police Cells
- output
- Improving Health Care
- implementation status
- Phase I Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 2,000,000
Gitura Health Centre
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Improving Health Care
- implementation status
- Not Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 3,000
Maombi Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Rehabilitation Of Bore Hole
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Manera/Gitario & Soweto Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank & Intake
- output
- Improve Living Standard
- implementation status
- Phase I & Ii Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Nyonjoro Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Kandutura Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Kabazi Community Police Post
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Police Post
- output
- Improving Security
- implementation status
- Not Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 2,000,000
Egdewood Police Post
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Police Post
- output
- Improving Security
- implementation status
- Not Complete
- total cost
- Ksh 517,000
- estimate
- Ksh 2,000,000
Jamatatu Dakagak Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Ndege Karigi Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Construction Of Water Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Mihango Kiharo Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Construction Of A Bridge
- output
- Improve Transport
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Menengai Community Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Limuko Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 550,000
Komu Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Kendurum Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2007
- action
- Frooring Of 3 Classrooms&Toilet
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 496,400
- estimate
- Ksh 500,000
Mihango Community Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Borehole Equiping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 494,040
- estimate
- Ksh 1,500,000
Tabuga Borehole
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Rehabilitation Of Bore Hole
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 460,000
- estimate
- Ksh 1,000,000
Karushwa Mai Mahiu Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Intake
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 459,166
- estimate
- Ksh 1,000,000
Mereroni Health Centre
- location
-
Lanet
(in Subukia)
- year first funded
- 2009
- action
- Construction Of Admn. Block
- output
- Improving Health Care
- implementation status
- Phase I Notcomplete
- total cost
- Ksh 450,000
- estimate
- Ksh 2,000,000
Subukia Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2004
- action
- Construction Of One Toilet Block & Rehabilitation Of Computer Laboratory
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 500,000
Subukia Umoja Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Dam & Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Mutito Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Drilling Of Bore Hole
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Looremeta Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Two Classrooms
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
Upper Heshima Ndeffo Community Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2007
- action
- Plastering & Roofing Of Water Tank
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Limuko Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 433,000
- estimate
- Ksh 1,000,000
Bahati Forest Catchment Area
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 405,438
- estimate
- Ksh 500,000
Wei Police Post
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Construction Of Police Post
- output
- Improving Security
- implementation status
- Not Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 2,500,000
Subukia Valley Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2003
- action
- Construction Of Tank & Intake
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
St. Peters Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Githioro Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
Mwiruti Primary School
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Toilets & Rehabilitation Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Muriundu Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of Toilet Blocks
- output
- Improve Sanitation
- implementation status
- Two Blocks Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Jirani Women Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Construction Of Water Tank
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 381,000
- estimate
- Ksh 1,500,000
Dundori Location Enviromental Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 366,670
- estimate
- Ksh 500,000
Gitura Primary School
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 360,000
- estimate
- Ksh 500,000
Our Lady Of Fatima Primary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2004
- action
- Construction Of One Classrooms
- output
- High Enrolment Of Students
- implementation status
- Completed
- total cost
- Ksh 360,000
- estimate
- Ksh 400,000
Kirengero Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Dundori Nursary Ecd
- location
-
Dundori
(in Subukia)
- year first funded
- 2009
- action
- Construction Of Class Rooms
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 500,000
Mireroni Secondary School
- location
-
Lanet
(in Subukia)
- year first funded
- 2005
- action
- Construction & Equipping Of Computer Laboratory
- output
- High Enrolment Of Students
- implementation status
- Construction Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Kianyoro Cattle Dip
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 320,000
- estimate
- Ksh 500,000
Kirengero And Jumatatu Enviromental Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 316,666
- estimate
- Ksh 500,000
Arash Kianyoro Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Githioro Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Mutitu Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Baraka Community Electricity Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Instalation Of A Transformer
- output
- Improve Living Standard
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mihango Nguli Roads
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Construction Of A Road
- output
- Improve Transport
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kabazi Public Toilet
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Toilet Construction
- output
- Improving Health Care
- implementation status
- Not Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 400,000
Chania Kirima Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Tank Construction
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Wendo Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2008
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Mwereri Secondary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of One Classroom
- output
- Improve Quality Of Education
- implementation status
- Not Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Limuko Secondary School
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Construction Of One Class
- output
- Improve Quality Of Education
- implementation status
- Not Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,500,000
Muringa Ecd
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Construction Of Class Rooms
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Mumoi Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
St. Josephs Kari Secondary School
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Construction Of 0Ne Classrooms
- output
- High Enrolment Of Students
- implementation status
- Phase One Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Thayu Development Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 297,166
- estimate
- Ksh 1,000,000
Kagochi /Wei Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 270,000
- estimate
- Ksh 0
Jumatatu Farmers
- location
-
Kabazi
(in Subukia)
- year first funded
- 2009
- action
- Buying Of Water Pumping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 270,000
- estimate
- Ksh 1,500,000
Githima Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2007
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Subukia Division Hq Toilet
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Construction Of Toilet
- output
- Improving Security
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Subukia Valley Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Moi Ndeffo Cattle Dip
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increase Livestock Production
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Ruguru Muungano Water Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Tuinuane Lanet Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2009
- action
- Borehole Equiping
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Wanyororo 'A' Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2005
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
Ourlady F Victories Primary School
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- Construction Of One Classroom
- output
- High Enrolment Of Students
- implementation status
- Phase 1 Not Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Kihoto Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Rehabilitation
- output
- Increase Livestock Production
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 500,000
Arash Cattle Dip
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Rehabilitation Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Not Complete
- total cost
- Ksh 215,000
- estimate
- Ksh 500,000
Gitura Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Munanda Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Miloreni Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Maombi Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Rumathi/Mwireri Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Matuto Water Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Intake
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Wanyororo Dam Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2004
- action
- Rehabilitation Of Dam
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kiamunyeki Community Water Project
- location
-
Lanet
(in Subukia)
- year first funded
- 2006
- action
- Piping
- output
- Improve Living Standard
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 1,000,000
Kenda Cattle Dip
- location
-
Kabazi
(in Subukia)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kamburi Water Project
- location
-
Dundori
(in Subukia)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 190,000
- estimate
- Ksh 0
Bahati Upper Environmental Project
- location
-
Bahati
(in Subukia)
- year first funded
- 2007
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 500,000
Umoja Lanet Youth Group
- location
-
Lanet
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 180,000
- estimate
- Ksh 500,000
Bahati Play Ground
- location
-
Bahati
(in Subukia)
- year first funded
- 2006
- action
- Recreation
- output
- Improving Talents
- implementation status
- Not Complete
- total cost
- Ksh 166,666
- estimate
- Ksh 500,000
Morro And Mihango Hills Enviromental Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 164,909
- estimate
- Ksh 500,000
Ruguru Cattle Dip
- location
-
Bahati
(in Subukia)
- year first funded
- 2008
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 500,000
Karungo Pre-Unit
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Rehabilitation
- output
- Improve Quality Of Education
- implementation status
- Complete
- total cost
- Ksh 160,000
- estimate
- Ksh 500,000
Subukia Play Ground
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Recreation
- output
- Improving Talents
- implementation status
- Not Complete
- total cost
- Ksh 158,243
- estimate
- Ksh 500,000
Kerengero Police Post
- location
-
Kabazi
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Dog Kennel
- output
- Improving Health Care
- implementation status
- Not Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
Ruguru Dispensary
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Renovation
- output
- Improving Health Care
- implementation status
- Phase I Notcomplete
- total cost
- Ksh 150,000
- estimate
- Ksh 2,000,000
Murunyu Cattle Dip
- location
-
Lanet
(in Subukia)
- year first funded
- 2009
- action
- Rehabilitation Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Not Complete
- total cost
- Ksh 150,000
- estimate
- Ksh 500,000
Kamiruri Green Belt Tree Nursary
- location
-
Bahati
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 142,930
- estimate
- Ksh 500,000
Morro Centre Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Living Std Improvement
- implementation status
- Complete
- total cost
- Ksh 124,350
- estimate
- Ksh 200,000
Matano Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Living Std Improvement
- implementation status
- Complete
- total cost
- Ksh 124,330
- estimate
- Ksh 200,000
Mihango Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Living Std Improvement
- implementation status
- Complete
- total cost
- Ksh 124,330
- estimate
- Ksh 200,000
Mihianyo Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Living Std Improvement
- implementation status
- Complete
- total cost
- Ksh 124,330
- estimate
- Ksh 200,000
Arash Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Construction Of A Bridge
- output
- Living Std Improvement
- implementation status
- Complete
- total cost
- Ksh 124,330
- estimate
- Ksh 200,000
Subukia Youth Awake Yargd
- location
-
Bahati
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 500,000
Bavuni Cattle Dip
- location
-
Dundori
(in Subukia)
- year first funded
- 2009
- action
- Rehabilitation Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Not Complete
- total cost
- Ksh 120,000
- estimate
- Ksh 500,000
Tetu Bridge
- location
-
Subukia
(in Subukia)
- year first funded
- 2007
- action
- Construction Of A Bridge
- output
- Improve Transport
- implementation status
- Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Mutundu Cattle Dip
- location
-
Subukia
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Ndege Cattle Dip
- location
-
Lanet
(in Subukia)
- year first funded
- 2006
- action
- Rehabilitation
- output
- Increase Livestock Production
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Dundori Community Cattle Dip
- location
-
Dundori
(in Subukia)
- year first funded
- 2006
- action
- Construction Of Cattle Dip
- output
- Increase Livestock Production
- implementation status
- Phase I Not Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 500,000
Friends Of Bahati Forest
- location
-
Bahati
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 90,000
- estimate
- Ksh 500,000
Kabazi Environmental Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 82,193
- estimate
- Ksh 500,000
Tushauriane Environmental Project
- location
-
Kabazi
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 82,193
- estimate
- Ksh 500,000
Chania Kirima Water Project
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Construction Of An Intake
- output
- Improve Living Standard
- implementation status
- Phase I Not Complete
- total cost
- Ksh 80,608
- estimate
- Ksh 1,000,000
Umoja Youth Group
- location
-
Subukia
(in Subukia)
- year first funded
- 2008
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 80,000
- estimate
- Ksh 500,000
Dundori Disabled Envg
- location
-
Dundori
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 68,772
- estimate
- Ksh 500,000
Subukia Disabled Envproject
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 64,386
- estimate
- Ksh 500,000
Kianyoro Envproject
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 64,386
- estimate
- Ksh 500,000
Kianoe General Focus E
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 48,772
- estimate
- Ksh 500,000
Kahuho Envproject
- location
-
Subukia
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 42,924
- estimate
- Ksh 500,000
Mugumo Envproject
- location
-
Bahati
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 42,924
- estimate
- Ksh 500,000
Rugongo Environmental Youth Group
- location
-
Kabazi
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 32,193
- estimate
- Ksh 500,000
Kabazi Plwha Elvironment Group
- location
-
Kabazi
(in Subukia)
- year first funded
- 2009
- action
- Reaforestation
- output
- Improving Environment
- implementation status
- Not Complete
- total cost
- Ksh 32,193
- estimate
- Ksh 500,000