The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Taveta

Mahoo Secondary School

location
Bomeni (in Taveta)
year first funded
2003
action
Constructio Of 8 Classes,Dorm & Admni.Block And Lab And Fencing
output
Ease Access To Sec. Education
implementation status
Latrines And Ablution Block, Complete And In Use. Dorm Ongoing
total cost
Ksh 9,920,000
estimate
Ksh 30,000,000

Bishop Njenga Secondary School

location
Njukini (in Taveta)
year first funded
2004
action
Construction Of 8 Classrooms, Ablution Block And Adm. Block
output
Ease Access To Sec. Education
implementation status
4 C/Rooms Adm. Block And Ablution Block Complete And In Use
total cost
Ksh 6,000,000
estimate
Ksh 30,000,000

Cdf Office

location
Bomeni (in Taveta)
year first funded
2005
action
Construction Of Cdf Office
output
Facilitate Administration
implementation status
Complete And In Use. Parking And Garage Construction Complete
total cost
Ksh 5,000,000
estimate
Ksh 7,000,000

Chala Secondary School

location
Chala (in Taveta)
year first funded
2004
action
Construction Of Lab And Staff Houses And 3 Classrooms
output
Improve Educ Quality
implementation status
Lab And Class And Staff Houses Complete And In Use. Two Classes Lental Stage
total cost
Ksh 5,000,000
estimate
Ksh 10,000,000

Kitobo Water Project

location
Bomeni (in Taveta)
year first funded
2004
action
Intake Works & Fence Pump House, 200M3 And Grid Chamber
output
Ease Access To Clean Water
implementation status
Ongoing
total cost
Ksh 4,800,000
estimate
Ksh 62,000,000

Eldoro H School

location
Kimorigo (in Taveta)
year first funded
2004
action
Construction Of Lab, Equipment And Adm. Block And Library
output
Improve Educ. Quality
implementation status
Lab. Complete And In Use. Adm. Block Roofing Stage.
total cost
Ksh 4,000,000
estimate
Ksh 10,000,000

Timbila Secondary School

location
Jipe (in Taveta)
year first funded
2003
action
Renovation Of Dorm,Sinking Of Borehole And Equipping, Fencing, Purchase Texbooks
output
Improve Educ. Quality
implementation status
Dorms And Fence And Textbooks And Borehole Complete And In Use.
total cost
Ksh 3,600,000
estimate
Ksh 10,000,000

Kitobo Secondary School

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of 4 Classrooms And 3 Pit Latrine
output
Ease Access To Sec. Education
implementation status
3 C/Rooms Complete And In Use. 1 C/Room Lental Stage
total cost
Ksh 3,450,000
estimate
Ksh 18,000,000

Lumi Secondary School

location
Njukini (in Taveta)
year first funded
2006
action
Construction Of 4 Classrooms And 3 Pit Latrine
output
Ease Access To Sec. Education
implementation status
3 C/Rooms & 3 Pit Lat- Complete And In Use. 1 C/Room Lental Stage
total cost
Ksh 3,250,000
estimate
Ksh 18,000,000

Mata Secondary School

location
Jipe (in Taveta)
year first funded
2006
action
Construction Of 4 Classrooms And 3 Pit Latrine
output
Ease Access To Sec. Education
implementation status
3 C/Rooms & 3 Pit Lat- Complete And In Use. 1 C/Room Lental Stage
total cost
Ksh 3,250,000
estimate
Ksh 18,000,000

Kmtc Campus

location
Bomeni (in Taveta)
year first funded
2007
action
Bush Clearing And Fencing
output
Aese Access To Education
implementation status
Ongoing
total cost
Ksh 3,000,000
estimate
Ksh 50,000,000

Taveta Polytechnic

location
Bomeni (in Taveta)
year first funded
2004
action
Electrical Installation And Fencing
output
Secure The Compund
implementation status
Electrical Complete. Fencing Ongoing
total cost
Ksh 2,700,000
estimate
Ksh 30,000,000

Njoro Kubwa Irrigation

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of Canal Lining
output
Control Water Flow And Sipage Compound
implementation status
Complete And In Use
total cost
Ksh 2,500,000
estimate
Ksh 10,000,000

Abori/ Kitoghoto Drain Care Csheme

location
Kimorigo (in Taveta)
year first funded
2005
action
Desilting Of Drain
output
Improve Water Flow And Floods Control
implementation status
4 Km Desiloted
total cost
Ksh 2,500,000
estimate
Ksh 20,000,000

Mahoo Primary School

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of 6 Classrooms And 1 Kitchen
output
Improve Access To Quality Education
implementation status
4 C/Rooms Complete And In Use. 2 C/Rooms And Kitchen Ongoing
total cost
Ksh 2,500,000
estimate
Ksh 10,000,000

Abori Primary School

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of 4 Classrooms And Renovation Of 6 Classrooms
output
Improve Access To Quality Education
implementation status
Complete And Use. 2 C/Rooms Roofing Stage
total cost
Ksh 2,300,000
estimate
Ksh 10,000,000

Rekeke Dispensary

location
Jipe (in Taveta)
year first funded
2006
action
Construction Of Dispensary
output
Ease Access To Health Care
implementation status
Compete And In Use
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Kituli / Ibura Canal

location
Bomeni (in Taveta)
year first funded
2007
action
Control Boxes
output
Improves Crop Yield
implementation status
Complete And In Use
total cost
Ksh 1,600,000
estimate
Ksh 1,500,000

St. Patrick - Kimala Primary School

location
Jipe (in Taveta)
year first funded
2005
action
Construction Of 2 Classrooms And Adm Block
output
Ease Access To Education
implementation status
Class Rooms Complete Adm. Block Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 5,750,000

Mahandakini Dispensary

location
Chala (in Taveta)
year first funded
2006
action
Construction Of Dispensary
output
Ease Access To Health Care
implementation status
80% Complete
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Njukini Health Centre

location
Njukini (in Taveta)
year first funded
2003
action
Construction Of Kitchen And Laundry
output
Ease Access To Medical Care
implementation status
Complete And In Use
total cost
Ksh 1,500,000
estimate
Ksh 5,000,000

Kitoghoto Primary School

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of 4 Classrooms And 2 Pit Latrine
output
Ease Access To Education
implementation status
Complete And In Use. 2 C/Rooms Tender Stage
total cost
Ksh 1,400,000
estimate
Ksh 6,000,000

Lake Jipe Water Project

location
Jipe (in Taveta)
year first funded
2007
action
Laying Of Pipes
output
Ease Access To Water
implementation status
Ongoing
total cost
Ksh 1,400,000
estimate
Ksh 2,500,000

Chala Dispensary

location
Chala (in Taveta)
year first funded
2003
action
Construction Of Maternity Wing And Purchase Microscpe
output
-
implementation status
Complete And In Use
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Kimorigo Dispensary

location
Kimorigo (in Taveta)
year first funded
2005
action
Construction Of Maternity Wing
output
Ease Access To Health Care
implementation status
Compete And Not Use
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Orkung'U Primary School

location
Jipe (in Taveta)
year first funded
2007
action
Construction Of 3 Classrooms 1 Pit Latrine
output
Easy Access To Quality Education
implementation status
Complete And In Use
total cost
Ksh 1,250,000
estimate
Ksh 6,000,000

Taveta Primary School

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of 2 Classrooms And Adm. Block
output
Improve Access To Quality Education
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 10,000,000

Riata Primary School

location
Kimorogo (in Taveta)
year first funded
2006
action
Construction Of 3 And I Pit Latrine
output
Ease Access To Quality Edu.
implementation status
Compete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 6,000,000

Kivukoni Primary School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 4 Classrooms
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 6,000,000

Chala Primary School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 4 Classrooms
output
Ease Access To Education
implementation status
80% Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 5,750,000

Sowene Primary School

location
Bomeni (in Taveta)
year first funded
2004
action
Constrution OfClassrooms And Library
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 5,000,000

Njukini Primary School

location
Njukini (in Taveta)
year first funded
2004
action
Constrution Of 4 Classrooms
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 5,750,000

Eldoro Primary School

location
Kimorigo (in Taveta)
year first funded
2004
action
Construction Of 3 Classrooms And 1 Pit Latrine
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 1,200,000
estimate
Ksh 5,750,000

Ndilidau Dispensary

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of Dispensary, 1 Pit Latrine And Furniture
output
Ease Access To Health Care
implementation status
Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Kiwalwa Dispensary

location
Bomeni (in Taveta)
year first funded
2004
action
Construction Of Dispensary And Pit Latrine
output
Ease Accsess To Health Care
implementation status
Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Mata Dispensary

location
Jipe (in Taveta)
year first funded
2003
action
Construction Of Maternity Wing
output
Ease Access To Medical Care
implementation status
Complete And In Use
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Mukuyuni Water Prpject

location
Jipe (in Taveta)
year first funded
2006
action
Laying Of Pipes
output
Ease Access To Clean Water
implementation status
80% Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Kiwalwa Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 2 Classrooms & 2 Pit Latrine
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 5,750,000

Kitobo Dispensary

location
Kimorigo (in Taveta)
year first funded
2003
action
Coonstruction Of Maternity Wing And 1 Pit Latrine
output
Ease Access To Medical Care
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

Sir-Ramson Primary School

location
Njukini (in Taveta)
year first funded
2006
action
Construction Of 2 Classrooms And 2 Pit Latrine
output
Ease Access To Education
implementation status
2 C/Rooms And 2 Pit Latrines Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 6,000,000

Nakruto Primary School

location
Chala (in Taveta)
year first funded
2006
action
Construction Of 2 Classrooms And 2 Pit Latrine
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 6,000,000

Challa Tuhire Irrigation Schooleme

location
Chala (in Taveta)
year first funded
2005
action
Electric Fence
output
Solve Human Wildlife Conflict
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Taveta District Hospital

location
Bomeni (in Taveta)
year first funded
2007
action
Purchase Of Ultra Sound Machine
output
Avail Quality Health Care
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Njukini / Ulawani Water Project

location
Njukini (in Taveta)
year first funded
2007
action
Laying Of Pipes - Construction Of 25M3 Tank
output
Availability Of Clean Water
implementation status
Complete And In Use
total cost
Ksh 1,000,000
estimate
Ksh 5,000,000

Kimala Social Hall

location
Jipe (in Taveta)
year first funded
2007
action
Construction Of Ocial Hall
output
Avail Meeting
implementation status
Slab Level Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Eldoro Social Hall

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of Social Hall
output
Provision Of Meeting Area
implementation status
80% Complete
total cost
Ksh 988,395
estimate
Ksh 1,500,000

Lumi Primary School

location
Njukini (in Taveta)
year first funded
2003
action
Construction Of 2 Classroom 2 Pit Latrines
output
Ease Acess To Education
implementation status
Complete And In Use
total cost
Ksh 900,000
estimate
Ksh 5,750,000

Njoro Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 8 Classrooms 3 Pit Latrine
output
Ease Congestion
implementation status
Complete And
total cost
Ksh 840,000
estimate
Ksh 6,000,000

Madarasani Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 8 Classrooms
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 840,000
estimate
Ksh 6,000,000

Mrabani Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 8 Classrooms
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 840,000
estimate
Ksh 6,000,000

Mata Primary School

location
Jipe (in Taveta)
year first funded
2005
action
Construction Of 3 Classrooms
output
Ease Access To Education
implementation status
Complete And In
total cost
Ksh 800,000
estimate
Ksh 5,750,000

Lotima Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 3 Classrooms And 1 Pit Latrine
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 6,000,000

Mahandakini Primary School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 3 Classrooms
output
Ease Access To Education
implementation status
80% Complete
total cost
Ksh 800,000
estimate
Ksh 6,000,000

Lesesia Primary School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 3 Classrooms
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 5,750,000

Rekeke Primary School

location
Jipe (in Taveta)
year first funded
2005
action
Construction Of 3 Classrooms
output
Ease Access To Quality Edu.
implementation status
2 Classes Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 5,750,000

Chokaa Primary School

location
Njukini (in Taveta)
year first funded
2005
action
Construction Of 4 Classrooms
output
Ease Access To Quality Edu.
implementation status
Compete And In Use
total cost
Ksh 800,000
estimate
Ksh 6,000,000

Malukiloriti Primary School

location
Bomeni (in Taveta)
year first funded
2005
action
Constuction Of 2 Classrooms
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 800,000
estimate
Ksh 575,000,000

Salaita - Malukiloriti Taveta Borehole And Water Sanitation

location
Jipe (in Taveta)
year first funded
2005
action
Sinking Of Borehole
output
Ease Access To Clean Water
implementation status
Complete And In Use
total cost
Ksh 770,405
estimate
Ksh 1,000,000

Njukini Irrigation Schooleme

location
Njukini (in Taveta)
year first funded
2006
action
Canal Lining
output
Facilitate Irrigation
implementation status
Complete And In Use
total cost
Ksh 750,000
estimate
Ksh 2,000,000

Majengo Irrigation Canal

location
Kimorigo (in Taveta)
year first funded
2007
action
Canal Lining
output
Improves Crop Yield
implementation status
Complete And In Use
total cost
Ksh 700,000
estimate
Ksh 3,000,000

Kitobo Primary School

location
Kimorigo (in Taveta)
year first funded
2003
action
Construction Of 8 Classrooms 2 Pit Latrine
output
Ease Congestion
implementation status
Complete And In Use
total cost
Ksh 640,000
estimate
Ksh 6,000,000

Taveta Horticultural Famers Association

location
Bomeni (in Taveta)
year first funded
2007
action
Purchase Power Saw And Sprayers - 10 Pumps 1 Power Saw
output
Improves Crop
implementation status
Complete And In Use
total cost
Ksh 600,000
estimate
Ksh 1,600,000

Ngutini Pre - School

location
Kimorigo (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Roofing Stage
total cost
Ksh 550,000
estimate
Ksh 1,500,000

Malukiloriti Electricity

location
Bomeni (in Taveta)
year first funded
2003
action
Installation Of Transformer
output
Ease Access To Energy Power
implementation status
Ongoing
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Lumi Farmers

location
Kimorigo (in Taveta)
year first funded
2005
action
Canal Lining
output
Facilitate Irrigation
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Mboghoni Irrigation Schooleme

location
Jipe (in Taveta)
year first funded
2005
action
Canal Stabilization
output
Facilitate Irrigation
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Culverts Block C

location
Kimorigo (in Taveta)
year first funded
2005
action
Construction Of Culverts
output
Control Water Flow
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Motor Bikes For Cdf

location
Bomeni (in Taveta)
year first funded
2004
action
Purchasing Motor Bikes For Office
output
Improve Project Monitoring
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

D's House

location
Bomeni (in Taveta)
year first funded
2004
action
Renovation Of Building
output
Conducive Accomodation
implementation status
Complete And In Use
total cost
Ksh 500,000
estimate
Ksh 500,000

Machungwani Pre-School

location
Chala (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
90% Complete In Use
total cost
Ksh 450,000
estimate
Ksh 1,500,000

Luidimo Pre School

location
Bomeni (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
85% Complete
total cost
Ksh 435,000
estimate
Ksh 1,500,000

Kalambani Pre-School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom And Pit Latrine
output
Ease Access To Basic Edu.
implementation status
Complete And In Use
total cost
Ksh 435,000
estimate
Ksh 1,500,000

Kimala - Rekeke Electricity

location
Jipe (in Taveta)
year first funded
2003
action
Installation Of Transformer
output
Ease Access To Energy Power
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mwarusa - Pre School

location
Bomeni (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
90% Complete
total cost
Ksh 400,000
estimate
Ksh 1,500,000

Maseketeni Water Project

location
Kimorigo (in Taveta)
year first funded
2006
action
Laying Of Pipes
output
Ease Access To Clean Water
implementation status
Compete And In Use
total cost
Ksh 400,000
estimate
Ksh 1,000,000

Mshegheshenyi Pre School

location
Bomeni (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom And 1 Pit Latrine
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 5,750,000

Ziwani Primary School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 2 Classrooms
output
Ease Access To Education
implementation status
80% Complete
total cost
Ksh 400,000
estimate
Ksh 6,000,000

Timbila Primary School

location
Bomeni (in Taveta)
year first funded
2005
action
Fencing
output
Secure The School Compund
implementation status
Complete And In Use
total cost
Ksh 400,000
estimate
Ksh 1,000,000

St. Peter's Pre-School

location
Bomeni (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom And I Pit Latrine
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 385,000
estimate
Ksh 1,500,000

Rekeke/Mikocheni Water Project

location
Jipe (in Taveta)
year first funded
2004
action
Supply Clean Drinking Water. Pipe Laying
output
Ease Access To Clean Water
implementation status
Complete And In Use
total cost
Ksh 306,617
estimate
Ksh 1,000,000

Kighongo Cha Miereni Water

location
Jipe (in Taveta)
year first funded
2007
action
Laying Of Pipes
output
Availability Of Clean Water
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 500,000

Kimala Irrigation Schooleme

location
Jipe (in Taveta)
year first funded
2005
action
Canal Lining
output
Facilitate Irrigation
implementation status
Complete And In Use
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Msengoni Pre-School

location
Bomeni (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Kitobo Pre-School

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
90% Complete
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Sowene Pre School

location
Bomeni (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Mjini Cha Chewa Pre School

location
Bomeni (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
90% Complete
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Marodo Pre-School

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Mwangaza Pre-School

location
Jipe (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Mahoo Pre-School

location
Bomeni (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Lumi Pre-School

location
Njukini (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Compete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Mokine Pre School

location
Kimorigo (in Taveta)
year first funded
2006
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Ndiva Ya Santana Irrigation Schooleme

location
Kimorigo (in Taveta)
year first funded
2005
action
Canal Lining
output
Facilitate Irrigation
implementation status
Complete And In Use
total cost
Ksh 250,000
estimate
Ksh 500,000

Bahati Road

location
Bomeni (in Taveta)
year first funded
2007
action
Clearing Access Road
output
Improve Security And Infrastructure
implementation status
Complete And In Use
total cost
Ksh 235,744
estimate
Ksh 10,000,000

Nomiya Pre-School

location
Bomeni (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Complete And In Use
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Vdc - Pre School

location
Kimorigo (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
85% Complete
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Grigan Pre School

location
Jipe (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
Complete And
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Majengo Pre School

location
Chala (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Njukini Pre School

location
Njukini (in Taveta)
year first funded
2005
action
Constuction Of 1 Classroom
output
Ease Access To Education
implementation status
Complete And In Use
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Salaita Pre-School

location
Jipe (in Taveta)
year first funded
2003
action
Construction Of 1 Classroom
output
Ease Access To Basic Edu.
implementation status
Complete And In Use
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Chala Chini Pre-School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom And Pit Latrine
output
Ease Access To Basic Edu.
implementation status
85 % Complete
total cost
Ksh 235,000
estimate
Ksh 1,500,000

Riata Ndogo Pre - School

location
Kimorigo (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Njoro Masaini Pre - School

location
Jipe (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Bahati Pre School

location
Bomeni (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Python Hill Water Project

location
Kimorigo (in Taveta)
year first funded
2003
action
Laying Of Pipes
output
Ease Access To Clean Water
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 400,000

Kidong'U Pre-School

location
Chala (in Taveta)
year first funded
2005
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Abori Lambo Pre School

location
Kimorigo (in Taveta)
year first funded
2005
action
Construction Of Classroom, Latrine And Purchase Land
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Chokaa Pre - School

location
Njukini (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Kiremeri Pre School

location
Bomeni (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Mukuyunipre - School

location
Bomeni (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Pre - School

location
Kimorigo (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Kyuasini Pre - School

location
Njukini (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Kitondoni Pre - School

location
Bomeni (in Taveta)
year first funded
2007
action
Construction Of 1 Classroom
output
Ease Access To Basic Education
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 1,500,000

Mukuyuni Market

location
Jipe (in Taveta)
year first funded
2006
action
Construction Of Pit Latrine
output
Improve Hygiene
implementation status
Tender Stage
total cost
Ksh 100,000
estimate
Ksh 400,000

Vikwatani Pre School

location
Bomeni (in Taveta)
year first funded
2006
action
Construction Of Pit Latrine
output
Ease Access To Basic Education
implementation status
Complete And In Use
total cost
Ksh 35,000
estimate
Ksh 1,500,000