The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Mahoo Secondary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2003
- action
- Constructio Of 8 Classes,Dorm & Admni.Block And Lab And Fencing
- output
- Ease Access To Sec. Education
- implementation status
- Latrines And Ablution Block, Complete And In Use. Dorm Ongoing
- total cost
- Ksh 9,920,000
- estimate
- Ksh 30,000,000
Bishop Njenga Secondary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2004
- action
- Construction Of 8 Classrooms, Ablution Block And Adm. Block
- output
- Ease Access To Sec. Education
- implementation status
- 4 C/Rooms Adm. Block And Ablution Block Complete And In Use
- total cost
- Ksh 6,000,000
- estimate
- Ksh 30,000,000
Cdf Office
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Construction Of Cdf Office
- output
- Facilitate Administration
- implementation status
- Complete And In Use. Parking And Garage Construction Complete
- total cost
- Ksh 5,000,000
- estimate
- Ksh 7,000,000
Chala Secondary School
- location
-
Chala
(in Taveta)
- year first funded
- 2004
- action
- Construction Of Lab And Staff Houses And 3 Classrooms
- output
- Improve Educ Quality
- implementation status
- Lab And Class And Staff Houses Complete And In Use. Two Classes Lental Stage
- total cost
- Ksh 5,000,000
- estimate
- Ksh 10,000,000
Kitobo Water Project
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Intake Works & Fence Pump House, 200M3 And Grid Chamber
- output
- Ease Access To Clean Water
- implementation status
- Ongoing
- total cost
- Ksh 4,800,000
- estimate
- Ksh 62,000,000
Eldoro H School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2004
- action
- Construction Of Lab, Equipment And Adm. Block And Library
- output
- Improve Educ. Quality
- implementation status
- Lab. Complete And In Use. Adm. Block Roofing Stage.
- total cost
- Ksh 4,000,000
- estimate
- Ksh 10,000,000
Timbila Secondary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2003
- action
- Renovation Of Dorm,Sinking Of Borehole And Equipping, Fencing, Purchase Texbooks
- output
- Improve Educ. Quality
- implementation status
- Dorms And Fence And Textbooks And Borehole Complete And In Use.
- total cost
- Ksh 3,600,000
- estimate
- Ksh 10,000,000
Kitobo Secondary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms And 3 Pit Latrine
- output
- Ease Access To Sec. Education
- implementation status
- 3 C/Rooms Complete And In Use. 1 C/Room Lental Stage
- total cost
- Ksh 3,450,000
- estimate
- Ksh 18,000,000
Lumi Secondary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms And 3 Pit Latrine
- output
- Ease Access To Sec. Education
- implementation status
- 3 C/Rooms & 3 Pit Lat- Complete And In Use. 1 C/Room Lental Stage
- total cost
- Ksh 3,250,000
- estimate
- Ksh 18,000,000
Mata Secondary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms And 3 Pit Latrine
- output
- Ease Access To Sec. Education
- implementation status
- 3 C/Rooms & 3 Pit Lat- Complete And In Use. 1 C/Room Lental Stage
- total cost
- Ksh 3,250,000
- estimate
- Ksh 18,000,000
Kmtc Campus
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Bush Clearing And Fencing
- output
- Aese Access To Education
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 50,000,000
Taveta Polytechnic
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Electrical Installation And Fencing
- output
- Secure The Compund
- implementation status
- Electrical Complete. Fencing Ongoing
- total cost
- Ksh 2,700,000
- estimate
- Ksh 30,000,000
Njoro Kubwa Irrigation
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of Canal Lining
- output
- Control Water Flow And Sipage Compound
- implementation status
- Complete And In Use
- total cost
- Ksh 2,500,000
- estimate
- Ksh 10,000,000
Abori/ Kitoghoto Drain Care Csheme
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Desilting Of Drain
- output
- Improve Water Flow And Floods Control
- implementation status
- 4 Km Desiloted
- total cost
- Ksh 2,500,000
- estimate
- Ksh 20,000,000
Mahoo Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of 6 Classrooms And 1 Kitchen
- output
- Improve Access To Quality Education
- implementation status
- 4 C/Rooms Complete And In Use. 2 C/Rooms And Kitchen Ongoing
- total cost
- Ksh 2,500,000
- estimate
- Ksh 10,000,000
Abori Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of 4 Classrooms And Renovation Of 6 Classrooms
- output
- Improve Access To Quality Education
- implementation status
- Complete And Use. 2 C/Rooms Roofing Stage
- total cost
- Ksh 2,300,000
- estimate
- Ksh 10,000,000
Rekeke Dispensary
- location
-
Jipe
(in Taveta)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Ease Access To Health Care
- implementation status
- Compete And In Use
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kituli / Ibura Canal
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Control Boxes
- output
- Improves Crop Yield
- implementation status
- Complete And In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
St. Patrick - Kimala Primary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms And Adm Block
- output
- Ease Access To Education
- implementation status
- Class Rooms Complete Adm. Block Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 5,750,000
Mahandakini Dispensary
- location
-
Chala
(in Taveta)
- year first funded
- 2006
- action
- Construction Of Dispensary
- output
- Ease Access To Health Care
- implementation status
- 80% Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Njukini Health Centre
- location
-
Njukini
(in Taveta)
- year first funded
- 2003
- action
- Construction Of Kitchen And Laundry
- output
- Ease Access To Medical Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,500,000
- estimate
- Ksh 5,000,000
Kitoghoto Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms And 2 Pit Latrine
- output
- Ease Access To Education
- implementation status
- Complete And In Use. 2 C/Rooms Tender Stage
- total cost
- Ksh 1,400,000
- estimate
- Ksh 6,000,000
Lake Jipe Water Project
- location
-
Jipe
(in Taveta)
- year first funded
- 2007
- action
- Laying Of Pipes
- output
- Ease Access To Water
- implementation status
- Ongoing
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,500,000
Chala Dispensary
- location
-
Chala
(in Taveta)
- year first funded
- 2003
- action
- Construction Of Maternity Wing And Purchase Microscpe
- output
- -
- implementation status
- Complete And In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
Kimorigo Dispensary
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Construction Of Maternity Wing
- output
- Ease Access To Health Care
- implementation status
- Compete And Not Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
Orkung'U Primary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 3 Classrooms 1 Pit Latrine
- output
- Easy Access To Quality Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,250,000
- estimate
- Ksh 6,000,000
Taveta Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms And Adm. Block
- output
- Improve Access To Quality Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 10,000,000
Riata Primary School
- location
-
Kimorogo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 3 And I Pit Latrine
- output
- Ease Access To Quality Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 6,000,000
Kivukoni Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 6,000,000
Chala Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Ease Access To Education
- implementation status
- 80% Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 5,750,000
Sowene Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Constrution OfClassrooms And Library
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 5,000,000
Njukini Primary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2004
- action
- Constrution Of 4 Classrooms
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 5,750,000
Eldoro Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2004
- action
- Construction Of 3 Classrooms And 1 Pit Latrine
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 5,750,000
Ndilidau Dispensary
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of Dispensary, 1 Pit Latrine And Furniture
- output
- Ease Access To Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
Kiwalwa Dispensary
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Construction Of Dispensary And Pit Latrine
- output
- Ease Accsess To Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
Mata Dispensary
- location
-
Jipe
(in Taveta)
- year first funded
- 2003
- action
- Construction Of Maternity Wing
- output
- Ease Access To Medical Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,000,000
Mukuyuni Water Prpject
- location
-
Jipe
(in Taveta)
- year first funded
- 2006
- action
- Laying Of Pipes
- output
- Ease Access To Clean Water
- implementation status
- 80% Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kiwalwa Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 2 Classrooms & 2 Pit Latrine
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,750,000
Kitobo Dispensary
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Coonstruction Of Maternity Wing And 1 Pit Latrine
- output
- Ease Access To Medical Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Sir-Ramson Primary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms And 2 Pit Latrine
- output
- Ease Access To Education
- implementation status
- 2 C/Rooms And 2 Pit Latrines Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 6,000,000
Nakruto Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms And 2 Pit Latrine
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 6,000,000
Challa Tuhire Irrigation Schooleme
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Electric Fence
- output
- Solve Human Wildlife Conflict
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Taveta District Hospital
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Purchase Of Ultra Sound Machine
- output
- Avail Quality Health Care
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Njukini / Ulawani Water Project
- location
-
Njukini
(in Taveta)
- year first funded
- 2007
- action
- Laying Of Pipes - Construction Of 25M3 Tank
- output
- Availability Of Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 5,000,000
Kimala Social Hall
- location
-
Jipe
(in Taveta)
- year first funded
- 2007
- action
- Construction Of Ocial Hall
- output
- Avail Meeting
- implementation status
- Slab Level Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 3,000,000
Eldoro Social Hall
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of Social Hall
- output
- Provision Of Meeting Area
- implementation status
- 80% Complete
- total cost
- Ksh 988,395
- estimate
- Ksh 1,500,000
Lumi Primary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 2 Classroom 2 Pit Latrines
- output
- Ease Acess To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 5,750,000
Njoro Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 8 Classrooms 3 Pit Latrine
- output
- Ease Congestion
- implementation status
- Complete And
- total cost
- Ksh 840,000
- estimate
- Ksh 6,000,000
Madarasani Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 8 Classrooms
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 840,000
- estimate
- Ksh 6,000,000
Mrabani Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 8 Classrooms
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 840,000
- estimate
- Ksh 6,000,000
Mata Primary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Ease Access To Education
- implementation status
- Complete And In
- total cost
- Ksh 800,000
- estimate
- Ksh 5,750,000
Lotima Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 3 Classrooms And 1 Pit Latrine
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 6,000,000
Mahandakini Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Ease Access To Education
- implementation status
- 80% Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 6,000,000
Lesesia Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 5,750,000
Rekeke Primary School
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 3 Classrooms
- output
- Ease Access To Quality Edu.
- implementation status
- 2 Classes Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 5,750,000
Chokaa Primary School
- location
-
Njukini
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 4 Classrooms
- output
- Ease Access To Quality Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 6,000,000
Malukiloriti Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 2 Classrooms
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 575,000,000
Salaita - Malukiloriti Taveta Borehole And Water Sanitation
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Sinking Of Borehole
- output
- Ease Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 770,405
- estimate
- Ksh 1,000,000
Njukini Irrigation Schooleme
- location
-
Njukini
(in Taveta)
- year first funded
- 2006
- action
- Canal Lining
- output
- Facilitate Irrigation
- implementation status
- Complete And In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 2,000,000
Majengo Irrigation Canal
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2007
- action
- Canal Lining
- output
- Improves Crop Yield
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 3,000,000
Kitobo Primary School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 8 Classrooms 2 Pit Latrine
- output
- Ease Congestion
- implementation status
- Complete And In Use
- total cost
- Ksh 640,000
- estimate
- Ksh 6,000,000
Taveta Horticultural Famers Association
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Purchase Power Saw And Sprayers - 10 Pumps 1 Power Saw
- output
- Improves Crop
- implementation status
- Complete And In Use
- total cost
- Ksh 600,000
- estimate
- Ksh 1,600,000
Ngutini Pre - School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Roofing Stage
- total cost
- Ksh 550,000
- estimate
- Ksh 1,500,000
Malukiloriti Electricity
- location
-
Bomeni
(in Taveta)
- year first funded
- 2003
- action
- Installation Of Transformer
- output
- Ease Access To Energy Power
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Lumi Farmers
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Canal Lining
- output
- Facilitate Irrigation
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 2,000,000
Mboghoni Irrigation Schooleme
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Canal Stabilization
- output
- Facilitate Irrigation
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Culverts Block C
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Construction Of Culverts
- output
- Control Water Flow
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Motor Bikes For Cdf
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Purchasing Motor Bikes For Office
- output
- Improve Project Monitoring
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
D's House
- location
-
Bomeni
(in Taveta)
- year first funded
- 2004
- action
- Renovation Of Building
- output
- Conducive Accomodation
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Machungwani Pre-School
- location
-
Chala
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- 90% Complete In Use
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Luidimo Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- 85% Complete
- total cost
- Ksh 435,000
- estimate
- Ksh 1,500,000
Kalambani Pre-School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom And Pit Latrine
- output
- Ease Access To Basic Edu.
- implementation status
- Complete And In Use
- total cost
- Ksh 435,000
- estimate
- Ksh 1,500,000
Kimala - Rekeke Electricity
- location
-
Jipe
(in Taveta)
- year first funded
- 2003
- action
- Installation Of Transformer
- output
- Ease Access To Energy Power
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mwarusa - Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- 90% Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 1,500,000
Maseketeni Water Project
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Laying Of Pipes
- output
- Ease Access To Clean Water
- implementation status
- Compete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
Mshegheshenyi Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom And 1 Pit Latrine
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 5,750,000
Ziwani Primary School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Ease Access To Education
- implementation status
- 80% Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 6,000,000
Timbila Primary School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Fencing
- output
- Secure The School Compund
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 1,000,000
St. Peter's Pre-School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom And I Pit Latrine
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 385,000
- estimate
- Ksh 1,500,000
Rekeke/Mikocheni Water Project
- location
-
Jipe
(in Taveta)
- year first funded
- 2004
- action
- Supply Clean Drinking Water. Pipe Laying
- output
- Ease Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 306,617
- estimate
- Ksh 1,000,000
Kighongo Cha Miereni Water
- location
-
Jipe
(in Taveta)
- year first funded
- 2007
- action
- Laying Of Pipes
- output
- Availability Of Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Kimala Irrigation Schooleme
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Canal Lining
- output
- Facilitate Irrigation
- implementation status
- Complete And In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 1,000,000
Msengoni Pre-School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Kitobo Pre-School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- 90% Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Sowene Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Mjini Cha Chewa Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- 90% Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Marodo Pre-School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Mwangaza Pre-School
- location
-
Jipe
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Mahoo Pre-School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Lumi Pre-School
- location
-
Njukini
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Compete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Mokine Pre School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2006
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 1,500,000
Ndiva Ya Santana Irrigation Schooleme
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Canal Lining
- output
- Facilitate Irrigation
- implementation status
- Complete And In Use
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Bahati Road
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Clearing Access Road
- output
- Improve Security And Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 235,744
- estimate
- Ksh 10,000,000
Nomiya Pre-School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Complete And In Use
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Vdc - Pre School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- 85% Complete
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Grigan Pre School
- location
-
Jipe
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- Complete And
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Majengo Pre School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Njukini Pre School
- location
-
Njukini
(in Taveta)
- year first funded
- 2005
- action
- Constuction Of 1 Classroom
- output
- Ease Access To Education
- implementation status
- Complete And In Use
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Salaita Pre-School
- location
-
Jipe
(in Taveta)
- year first funded
- 2003
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Edu.
- implementation status
- Complete And In Use
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Chala Chini Pre-School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom And Pit Latrine
- output
- Ease Access To Basic Edu.
- implementation status
- 85 % Complete
- total cost
- Ksh 235,000
- estimate
- Ksh 1,500,000
Riata Ndogo Pre - School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Njoro Masaini Pre - School
- location
-
Jipe
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Bahati Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Python Hill Water Project
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2003
- action
- Laying Of Pipes
- output
- Ease Access To Clean Water
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Kidong'U Pre-School
- location
-
Chala
(in Taveta)
- year first funded
- 2005
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Abori Lambo Pre School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2005
- action
- Construction Of Classroom, Latrine And Purchase Land
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Chokaa Pre - School
- location
-
Njukini
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Kiremeri Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Mukuyunipre - School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Pre - School
- location
-
Kimorigo
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Kyuasini Pre - School
- location
-
Njukini
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Kitondoni Pre - School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Ease Access To Basic Education
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Mukuyuni Market
- location
-
Jipe
(in Taveta)
- year first funded
- 2006
- action
- Construction Of Pit Latrine
- output
- Improve Hygiene
- implementation status
- Tender Stage
- total cost
- Ksh 100,000
- estimate
- Ksh 400,000
Vikwatani Pre School
- location
-
Bomeni
(in Taveta)
- year first funded
- 2006
- action
- Construction Of Pit Latrine
- output
- Ease Access To Basic Education
- implementation status
- Complete And In Use
- total cost
- Ksh 35,000
- estimate
- Ksh 1,500,000