The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Keben/Koilot Water Project
- location
-
Koilot
(in Tinderet)
- year first funded
- 2004
- action
- Repair The Existing Water Project And Extention Of Pipe Works
- output
- Existing Water Tank And Pipe Repaired
- implementation status
- Ongoing
- total cost
- Ksh 10,750,000
- estimate
- Ksh 0
Lelwak secondary School
- location
-
Kapkitony
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 4 Classrooms And Lab
- output
- 4 Permanent Classrooms Built
- implementation status
- Classrooms Completed
- total cost
- Ksh 10,000,000
- estimate
- Ksh 6,000,000
Meteitei secondary School
- location
-
Koilot
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 7 Classrooms & Dining Hall
- output
- 7 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 8,000,000
- estimate
- Ksh 3,500,000
Taito KTGA secondary School
- location
-
Kaplelmet
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 1 Dormitory
- output
- 1 Boys Dormitory Constructed To Completion
- implementation status
- Ongoing
- total cost
- Ksh 6,650,000
- estimate
- Ksh 4,000,000
Kaplelmet secondary School
- location
-
Kabirer
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 4,500,000
- estimate
- Ksh 4,500,000
Hentry Kosgey secondary School secondary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2003
- action
- Construction of 4 Classrooms,Library An Dormitory
- output
- 4 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 4,500,000
- estimate
- Ksh 2,000,000
Sochoi AIC Girls secondary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- To Costruct Storey Administration Block
- output
- Administration Block Constructed To Concrete Slab.
- implementation status
- Ongoing
- total cost
- Ksh 4,500,000
- estimate
- Ksh 3,000,000
Sile Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 4,250,000
- estimate
- Ksh 1,600,000
Kimatkei/Kipkoil Water Project
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2004
- action
- Construction of Of A New Water Project
- output
- Water Tanks Constructed And Pipes Laid
- implementation status
- Ongoing
- total cost
- Ksh 3,000,000
- estimate
- Ksh 4,500,000
O'llessos Day secondary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 7 Classrooms
- output
- 7 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 2,750,000
- estimate
- Ksh 2,500,000
Chemamul Water Project
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2004
- action
- Construction Of A New Water Project(Intake And Piping)
- output
- Water Tanks Constructed And Pipes Laid
- implementation status
- Ongoing
- total cost
- Ksh 2,600,000
- estimate
- Ksh 2,000,000
Chepkunyuk Girls secondary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- For Completion Of 4 Classes & Staff Houses
- output
- Finishing Done
- implementation status
- Completed
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,000,000
Got ne lel Electrification
- location
-
Kamelilo
(in Tinderet)
- year first funded
- 2005
- action
- To Install Electricity In Public Institutions In The Rural Area
- output
- Electric Posts Laid Wires Connected And Transformer Put In Place(Electricity Supplied To The Public Institution)
- implementation status
- Ongoing
- total cost
- Ksh 2,201,000
- estimate
- Ksh 2,201,000
St. John Tachasis secondary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms Admnin Block
- output
- 4 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 2,200,000
- estimate
- Ksh 3,000,000
Our lady of peace secondary School
- location
-
Tartar
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classes
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 2,100,000
- estimate
- Ksh 3,000,000
Taunet secondary School
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2004
- action
- To Complete The Remaining Part Of 4 Classrooms
- output
- Finishing Carried Out To 4 Permanent Classrooms
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Tindiret Secondary secondary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 4 Classrooms/Completion Of Dining Hall
- output
- To Construct 4 Classrooms
- implementation status
- I complete 1 on going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,500,000
Fr. Martin boyle academy secondary School
- location
-
Chepkemel
(in Tinderet)
- year first funded
- 2006
- action
- To Complete The Remaining Part Of 4 Classrooms
- output
- Finishing Carried Out To 4 Permanent Classrooms
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Kaobote Adv. secondary School
- location
-
Mogobich
(in Tinderet)
- year first funded
- 2004
- action
- To Do Finishing Of The Science Lab.
- output
- Finishing For The Science La. Done.
- implementation status
- Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 5,000,000
Mutumon secondary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 7 Classrooms
- output
- 7 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 1,900,000
- estimate
- Ksh 2,100,000
AIC Setek secondary School
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 1,700,000
- estimate
- Ksh 2,000,000
Cheptonon secondary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Tinderet Dos Office
- location
-
Soba
(in Tinderet)
- year first funded
- 2007
- action
- Construction of DoS Offices
- output
- Fully Constructed Offices
- implementation status
- Work In Progress At Roofing Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,500,000
Mogobich Day secondary School
- location
-
Kamelilo
(in Tinderet)
- year first funded
- 2006
- action
- To Carry Out Finishing To 4 Classes And The Administration Block
- output
- Finishing Done
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Lengon
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2006
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 1,300,000
- estimate
- Ksh 2,000,000
Mombwo Dispensary
- location
-
Kapkitony
(in Tinderet)
- year first funded
- 2003
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Completed
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,500,000
Fr. Matrin Boyle Kabolebo secondary School
- location
-
Koilot
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 4 Classrooms & Admin.Block
- output
- 4 Permanent Classrooms Built
- implementation status
- 4 Classrooms Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 2,400,000
Cheptingting Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3.3 Ha Land Bought And Toilet Constructed
- implementation status
- Ongoing
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,200,000
Boiywek/Kip Water Project
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2005
- action
- Construction Of A New Water Project
- output
- Water Tanks Constructed And Pipes Laid
- implementation status
- Ongoing
- total cost
- Ksh 1,100,000
- estimate
- Ksh 2,600,000
Kaputi Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,900,000
Kapkoros Dispensary
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place.Staff Residence 50% Costruction Donne
- implementation status
- Dispensarycompleted. Staff House Under Costruction
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Siwo secondary School
- location
-
Chepkemel
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 2 Classrooms/Lab Completion
- output
- 2 Permanent Classsrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,300,000
Koilot Day secondary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Chepkunyuk Day secondary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Kipkoror Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2003
- action
- To Carry Out Finishing Of 5 Classrooms
- output
- 5 Permanent Classrooms Finished
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kaputi Day secondary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,200,000
Sirwa Health Centre
- location
-
(in Tinderet)
- year first funded
- 2008
- action
- To Buy 5 Ha Land To Constuct Heath Centre And Maternity Wing
- output
- Land To Bought For School Expansion Of The Dispensary
- implementation status
- Yet To Receive Fund Disbursement
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kapkoros/Kipkorom Koisagat road
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Mbogovalley Dispensary
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,500,000
Kogamei Primary School
- location
-
Kosoiywo
(in Tinderet)
- year first funded
- 2004
- action
- To Construct4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 1,600,000
Meteitei Sub District Hospital
- location
-
Metitei
(in Tinderet)
- year first funded
- 2004
- action
- Construction of Mortuary And Hostels For The Existing SubDistrict Hospital
- output
- A Mortuary And Hostels Built To Completion And Equipped
- implementation status
- Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 1,000,000
Cherondo-Uson-Kabirer road
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2006
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
Kipkorom Primary School
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 6 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 850,000
- estimate
- Ksh 1,200,000
St. Mathias Kapkwang Primary School
- location
-
Mogobich
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 850,000
- estimate
- Ksh 1,200,000
Kaplelmet Electrification
- location
-
Kaplelmet
(in Tinderet)
- year first funded
- 2005
- action
- To Install Electricity In Public Institutions In The Rural Area
- output
- Electric Posts Laid Wires Connected And Transformer Put In Place(Electricity Supplied To The Public Institution)
- implementation status
- Ongoing
- total cost
- Ksh 813,000
- estimate
- Ksh 813,000
Chepsire Primary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2004
- action
- To Renovate All Classrooms
- output
- Finishing Of 8 Classrooms Done
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 2,300,000
Tigityo Primary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 750,000
- estimate
- Ksh 1,200,000
Timobo Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Mbogo valley/Koiyet road
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2004
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,000,000
Kapkoros Primary School
- location
-
Kabirer
(in Tinderet)
- year first funded
- 2003
- action
- Construction of 5 Classrooms
- output
- 5 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 700,000
- estimate
- Ksh 1,500,000
Chepkunyuk Dispensary
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 2,500,000
Kaptien Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2005
- action
- To Build 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 650,000
- estimate
- Ksh 900,000
Sinendet Electrification
- location
-
Kosoiywo
(in Tinderet)
- year first funded
- 2005
- action
- To Install Electricity In Public Institutions In The Rural Area
- output
- Electric Posts Laid Wires Connected And Transformer Put In Place(Electricity Supplied To The Public Institution)
- implementation status
- Ongoing
- total cost
- Ksh 616,000
- estimate
- Ksh 616,000
Matema Primary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Chebinyiny Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
AIC Keben Primary School
- location
-
Koilot
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 5 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Korosiot Primary School
- location
-
Songhor
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Tereno Primary School
- location
-
Kipsebwo
(in Tinderet)
- year first funded
- 2007
- action
- Construction of 4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
AIC Tinderet Primary School
- location
-
Mogobich
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 1,200,000
Kipsiwo/Maraba road
- location
-
Kamelilo
(in Tinderet)
- year first funded
- 2005
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kamecha-Ngweses road
- location
-
Koilot
(in Tinderet)
- year first funded
- 2007
- action
- To Open Up A New Access Road
- output
- -
- implementation status
- not known
- total cost
- Ksh 600,000
- estimate
- Ksh 1,500,000
Kitechgaa Primary School
- location
-
(in Tinderet)
- year first funded
- 2007
- action
- To Buy 3 Ha Land To Constuct Classrooms
- output
- Land To Bought For School Expansion Of New School
- implementation status
- Already 3Ha Land In Place
- total cost
- Ksh 560,000
- estimate
- Ksh 1,000,000
Ndubusat Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- To Built 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 1,500,000
Choimim Primary School
- location
-
Koilot
(in Tinderet)
- year first funded
- 2008
- action
- To Built 2 Classrooms
- output
- 2 Permanent Classrooms To Built
- implementation status
- Yet To Start
- total cost
- Ksh 550,000
- estimate
- Ksh 1,300,000
Kaplamaiywo Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 550,000
- estimate
- Ksh 600,000
Kimolonik primary Primary School
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2008
- action
- To Build 2 Classrooms
- output
- 1 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 2,000,000
Kipngelel Primary School
- location
-
Kaplelmet
(in Tinderet)
- year first funded
- 2004
- action
- To Build 3 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 1,000,000
Kapnyemis Primary School
- location
-
Chemomi
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 550,000
- estimate
- Ksh 1,200,000
Koiyet/Songhor road
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 525,000
- estimate
- Ksh 1,500,000
Soba river secondary School
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2006
- action
- To Finish The Dining Hall And Laboratory
- output
- Finishing Done To 1 Dining Hall And 1 Science Lab.
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Mbogovalley Songhor road
- location
-
Soba
(in Tinderet)
- year first funded
- 2006
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 3,000,000
Senetwo/Kamelilo/Tebeson road
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Chemelil Dispensary
- location
-
Chemelil
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 2,500,000
Kamelil Dispensary
- location
-
Kamelil
(in Tinderet)
- year first funded
- 2003
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 2,500,000
Ollessos Dispensary
- location
-
Lessos
(in Tinderet)
- year first funded
- 2003
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Cheptilil Dispensary
- location
-
Kapsimotwa
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Sochoi Primary School
- location
-
Mogobich
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Koibeiyo Primary School
- location
-
Chemelil
(in Tinderet)
- year first funded
- 2006
- action
- Construction of 5 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 450,000
- estimate
- Ksh 1,500,000
Kaptien Bridge road
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2007
- action
- To Open Up A New Access Road
- output
- -
- implementation status
- 3 Complete 2 On going
- total cost
- Ksh 450,000
- estimate
- Ksh 700,000
Kapsoen Electrification
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2005
- action
- To Install Electricity In Public Institutions In The Rural Area
- output
- Electric Posts Laid Wires Connected And Transformer Put In Place(Electricity Supplied To The Public Institution)
- implementation status
- Ongoing
- total cost
- Ksh 401,000
- estimate
- Ksh 401,000
Sigowet Primary School
- location
-
Kapchorua
(in Tinderet)
- year first funded
- 2004
- action
- To Build 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 600,000
Kaptien Dispensary
- location
-
Cheptililik
(in Tinderet)
- year first funded
- 2006
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 2,500,000
Kipsamoo Primary School
- location
-
Cheptililik
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- One Permanent Classroom Built
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 2,000,000
Kipsisin Primary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 400,000
- estimate
- Ksh 800,000
Kolelach Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2008
- action
- To Build 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Kimugul Primary School
- location
-
Sochoi
(in Tinderet)
- year first funded
- 2007
- action
- Construction of 1 Classrooms
- output
- 1 Permanent Classrooms Built
- implementation status
- 1 Class Room Bult To Roofig
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Sosiot Primary School
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 700,000
Koisegem Primary School
- location
-
Kosoiywo
(in Tinderet)
- year first funded
- 2006
- action
- To Build 3 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 360,000
- estimate
- Ksh 2,400,000
Kabikwen Primary School
- location
-
Koilot
(in Tinderet)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Chesirigan Primary School
- location
-
Kapkitony
(in Tinderet)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Kikusgong Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 720,000
Tuiyobei Primary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 1,250,000
Kapbunyeria Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 700,000
Kaplolon Primary School
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Kitoroch Primary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 1 Classrooms
- output
- 1Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Orgirgir Primary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Complete Classrooms To Built
- implementation status
- Yet To Start
- total cost
- Ksh 350,000
- estimate
- Ksh 400,000
Senetwo Primary School
- location
-
Songhor
(in Tinderet)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 900,000
Labuiywo Electrification
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2005
- action
- To Install Electricity In Public Institutions In The Rural Area
- output
- Electric Posts Laid Wires Connected And Transformer Put In Place(Electricity Supplied To The Public Institution)
- implementation status
- Ongoing
- total cost
- Ksh 345,000
- estimate
- Ksh 345,000
Mombwo Cheptonon road
- location
-
Kapkitony
(in Tinderet)
- year first funded
- 2004
- action
- To Open Up Rural Access Road.
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 325,000
- estimate
- Ksh 1,500,000
Keteng Dispensary
- location
-
Kaplelmet
(in Tinderet)
- year first funded
- 2008
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Cheque Yet To Be Disbursed
- total cost
- Ksh 321,806
- estimate
- Ksh 800,000
Kipkoror Dispensary
- location
-
(in Tinderet)
- year first funded
- 2008
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Waiting Cheque Dispersment
- total cost
- Ksh 300,000
- estimate
- Ksh 789,000
Koiyet Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Taboiyat Primary School
- location
-
Siret
(in Tinderet)
- year first funded
- 2007
- action
- Construction of Four Classrooms
- output
- One Permanent Classroom Built
- implementation status
- One Classroom Constructed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Chelambut Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
mosine Primary School
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 4 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 300,000
- estimate
- Ksh 1,600,000
St. Mark Lolkireny Primary School
- location
-
Sochoi
(in Tinderet)
- year first funded
- 2007
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built To Completion
- implementation status
- Funds Reallocaed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Kapsogio Primary School
- location
-
Siret
(in Tinderet)
- year first funded
- 2007
- action
- To Build 2 Classrooms
- output
- 1 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Chepkechir Primary School
- location
-
Kaplelmet
(in Tinderet)
- year first funded
- 2007
- action
- Construction of 3 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 900,000
Matambach Primary School
- location
-
Chepkemel
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 4 Classes
- output
- 4 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Seiyot Primary School
- location
-
Soba
(in Tinderet)
- year first funded
- 2004
- action
- To Build 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 600,000
Cherobor Bridge road
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2007
- action
- To Open Up A New Access Road
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 500,000
Anapngetuny road
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2007
- action
- To Open Up A New Access Road
- output
- The Rural Access Road Cleared And Graded
- implementation status
- Ongoing
- total cost
- Ksh 300,000
- estimate
- Ksh 2,000,000
Cheptabach Primary School
- location
-
Kamelil
(in Tinderet)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 290,000
- estimate
- Ksh 0
Taunet Primary School
- location
-
Kamelilo
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 3 Classrooms
- output
- 4 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 250,000
- estimate
- Ksh 1,000,000
SDA Labyuywo Primary School
- location
-
Tinderet
(in Tinderet)
- year first funded
- 2009
- action
- Construction of 1 Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 203,300
- estimate
- Ksh 0
Cheptabach Dispensary
- location
-
Siret
(in Tinderet)
- year first funded
- 2004
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,500,000
Kimaran Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2008
- action
- To Build 5 Classrooms
- output
- New Project
- implementation status
- Yet To Start
- total cost
- Ksh 200,000
- estimate
- Ksh 1,900,000
Kapkembur Primary School
- location
-
Kabirer
(in Tinderet)
- year first funded
- 2008
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Yet To Start
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kaiboi Primary School
- location
-
Chepkunyuk
(in Tinderet)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- Funds ReAllocated
- implementation status
- Funds ReAllocated
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kapkeren Dispensary
- location
-
Kabirer
(in Tinderet)
- year first funded
- 2006
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 2,500,000
Sirwa Primary School
- location
-
Kapkoros
(in Tinderet)
- year first funded
- 2004
- action
- To Build 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Ngatipgong Primary School
- location
-
Meteitei
(in Tinderet)
- year first funded
- 2003
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Chemamul Primary School
- location
-
Kapkitony
(in Tinderet)
- year first funded
- 2003
- action
- Construction of 3 Classrooms
- output
- 3 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 900,000
Megunyet Primary School
- location
-
Chemamul
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 2 Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Kabutie Primary School
- location
-
Sochoi
(in Tinderet)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- 1Permanent Classrooms Built
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 800,000
Chebinyiy/Tulwop moi Water Project
- location
-
Chepkemel
(in Tinderet)
- year first funded
- 2004
- action
- Construction of Of A New Water Project
- output
- Water Tanks Constructed And Pipes Laid
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 3,000,000
Chepkemel Water Project
- location
-
Chepkemel
(in Tinderet)
- year first funded
- 2004
- action
- Construction Of A New Water Project
- output
- Water Tanks Constructed And Pipes Laid
- implementation status
- Ongoing
- total cost
- Ksh 100,000
- estimate
- Ksh 2,500,000
Koilot Dispensary
- location
-
Koilot
(in Tinderet)
- action
- Construction of New Dispensary
- output
- New Dispensary Together With The Administration Block In Place
- implementation status
- Ongoing
- total cost
- Ksh 0
- estimate
- Ksh 2,500,000