The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Ugenya

Tingare Secondary School

location
North Uholo (in Ugenya)
year first funded
2009
action
Construction Of A Dining Hall And Kitchen
output
Standardized Dining Hall And Kitchen
implementation status
Stalled
total cost
Ksh 10,000,000
estimate
Ksh 943,710

Ambira Health Centre

location
Central Ugenya (in Ugenya)
year first funded
2008
action
Construction 1 Male And 1 Female Ward
output
Male And Female Wards
implementation status
Ongoing
total cost
Ksh 6,200,000
estimate
Ksh 5,000,000

Umina Mixed Secondary School

location
Central Ugenya (in Ugenya)
year first funded
2003
action
Construction of admin block & Verandah; wall/floor Plastering; Fitting Of Windows/Doors; Paintings; Electrification; Ceiling
output
Administration Complex And Construction Of 4 Classrooms
implementation status
Ongoing
total cost
Ksh 3,070,000
estimate
Ksh 5,000,000

Bar Achuth Dispensary

location
North Ugenya (in Ugenya)
year first funded
2005
action
Construction Of Maternity Unit, Male And Female Wards;Walling;Plastering;Roofing;Painting;Fitting
output
Maternity Unit,, Male And Female Wards
implementation status
Complete
total cost
Ksh 2,772,303
estimate
Ksh 2,052,303

Ukwala Health Centre

location
Ukwala (in Ugenya)
year first funded
2009
action
Construction Of 2 Staff Houses
output
Staff Houses
implementation status
Stalled
total cost
Ksh 2,681,544
estimate
Ksh 3,150,000

Sikalame Dispensary

location
South Ugenya (in Ugenya)
year first funded
2007
action
Electification;Painting;General Repair;Two Roomd
output
Construction Of Maternity Ward.
implementation status
Complete
total cost
Ksh 2,551,850
estimate
Ksh 3,000,000

Tingare Dispensary

location
North Uholo (in Ugenya)
year first funded
2006
action
Slabbing(Flooring);Gables Building;Plastering;Fitting Of Doors,Windows;Painting;Starting Phace 2 Of The Project
output
Standardized Health Centre With Matarnity Unit And Opd
implementation status
Complete
total cost
Ksh 2,140,298
estimate
Ksh 15,000,000

Simenya Dispensary

location
South Ugenya (in Ugenya)
year first funded
2006
action
Construction Of Opd.Foundation;Plastering Of Walls&Floor;Fittings Off Windows,Doors;Painsdtings;Electrification
output
Construction Of Out Patient Dept
implementation status
Ongoing
total cost
Ksh 2,100,000
estimate
Ksh 3,393,510

Uhuyi Dispensary

location
South Ugenya (in Ugenya)
year first funded
2008
action
Construction Of Out Patient Department
output
Newest Dispensary
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 1,000,000

Bar Anyanga Primary School

location
West Ugenya (in Ugenya)
year first funded
2006
action
Paintings Of Classrooms; wall Plastering; Fittings Of Shutters; Facerboards ;Construction Of Admin Block
output
1.Bright (Lighted) Classrooms2.Trs' Comfort3.Conducive Learning Environment4.Easy Administration
implementation status
Ongoing
total cost
Ksh 1,700,000
estimate
Ksh 970,000

Ulawe Primary School

location
Central Ugenya (in Ugenya)
year first funded
2004
action
Construction 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 1,655,000
estimate
Ksh 1,659,900

St. Charles Humwend Sec

location
West Ugenya (in Ugenya)
year first funded
2007
action
Walling;Roofing;Plastering
output
1.Four Classrooms2.Office Block3.Laboratory4.Library
implementation status
Stalled
total cost
Ksh 1,600,000
estimate
Ksh 45,000,000

Pap Olang' Primary School

location
West Ugenya (in Ugenya)
year first funded
2004
action
Construction;Plastering Of Walls And Floor;Fitting Of Doors And Windows;Paintings
output
Standardized 1 Classroom
implementation status
Complete
total cost
Ksh 1,559,650
estimate
Ksh 1,960,000

Harungu Primary School

location
North Ugenya (in Ugenya)
year first funded
2006
action
Renovation Of 3 Classrooms;Walling;Roofing;Plastering
output
3 Renovated Classrooms
implementation status
Ongoing
total cost
Ksh 1,550,000
estimate
Ksh 1,200,000

Ukwala Dc~S Office

location
Ukwala (in Ugenya)
year first funded
2008
action
Extension Of The Dc'S Office
output
Office Extension
implementation status
Ongoing
total cost
Ksh 1,500,000
estimate
Ksh 2,185,475

Siginga Secondary School

location
West Ugenya (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 1,500,000
estimate
Ksh 15,000,000

Urenga Health Centre Childrens Ward

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Walls Plastering, flooring, window fittings, doors, painting, roofing, electrification
output
Standardized Childrens Ward
implementation status
Stalled
total cost
Ksh 1,345,815
estimate
Ksh 800,000

Umer Dispensary

location
East Ugenya (in Ugenya)
year first funded
2007
action
Construction Of Outpatient Unit;Walling;Roofing;Plastering;Painting;Fittings
output
Out Patient Unit,, 500 Litre Water Tank
implementation status
Complete
total cost
Ksh 1,335,590
estimate
Ksh 1,335,590

Lung`A Primary School

location
West Ugenya (in Ugenya)
year first funded
2006
action
Plasteringof Floor; ;Fittings Of Windows,Doors
output
3 Classrooms And Administration Block
implementation status
Complete
total cost
Ksh 1,330,030
estimate
Ksh 2,616,000

West Ugenya Youth Polytechnic

location
West Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Workshop
output
One Workshop
implementation status
Stalled
total cost
Ksh 1,300,000
estimate
Ksh 2,000,000

Raduodi Primary School

location
Central Ugenya (in Ugenya)
year first funded
2005
action
Constructing 3 Classrooms;Plastering Of Walls,Floor;Fittings Of Windows,Doors;Paintings
output
Standardized 3 Classrooms
implementation status
Stalled
total cost
Ksh 1,157,540
estimate
Ksh 1,903,640

Sigomre Health Centre

location
East (in Ugenya)
year first funded
2003
action
Wiring;Painting;Plumbing;Furnishing
output
Standardized 3 Observation Wards:-Male, Female & Children
implementation status
Complete
total cost
Ksh 1,150,000
estimate
Ksh 1,100,000

Got Odima Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Walling, Plastering, Roofing, Painting Of 2 Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 1,139,610
estimate
Ksh 500,000

Uref Primary School

location
West (in Ugenya)
year first funded
2005
action
Walling
output
Four Standardized Classrooms
implementation status
Complete
total cost
Ksh 1,128,345
estimate
Ksh 1,293,300

Ugunja Primary School

location
West Uholo (in Ugenya)
year first funded
2009
action
Contruction Of Two Newest Classrooms
output
Two Modern Classrooms
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 0

Sega Township Secondary School

location
North Ugenya (in Ugenya)
year first funded
2008
action
Construction Of 1 Laboratory
output
Laboratory
implementation status
Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Luanda Secondary School

location
East Ugenya (in Ugenya)
year first funded
2009
action
Constsruction Of Two Newest Classrooms
output
2 Standardized Classrooms
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Rang'Ala Girls Secondary School

location
South Ugenya (in Ugenya)
year first funded
2009
action
Contstruction Of A Newest Dormitory
output
1 Dormitory
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 6,000,000

Got Osimbo Secondary School

location
East Uholo (in Ugenya)
year first funded
2009
action
Construction Of A Newest Dormitory
output
Standardized Dormitory
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 8,300,000

Musiko Primary School

location
North Uholo (in Ugenya)
year first funded
2009
action
Constuction Of Two Newest Classrooms
output
Standardized 2 Classrooms
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 500,000

Ramunde Secondary School

location
North East Ugenya (in Ugenya)
year first funded
2009
action
Construction Of Two Newest Classrooms
output
2 Standardized Classrooms
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 1,487,700

Ndenga Secondary School

location
North West Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Library
output
Library
implementation status
Stalled
total cost
Ksh 1,000,000
estimate
Ksh 2,000,000

West Ugenya Youth Polytechnic

location
West Ugenya (in Ugenya)
year first funded
2008
action
Completion Of 3 Classrooms
output
3 Classrooms
implementation status
Ongoing
total cost
Ksh 995,256
estimate
Ksh 4,472,060

Ukela Primary School

location
East Ugenya (in Ugenya)
year first funded
2006
action
Construction of 4 Classrooms; Walling; Roofing; Plastering; Painting; Piping/electricity
output
Completion 4 Classrooms
implementation status
Ongoing
total cost
Ksh 992,200
estimate
Ksh 500,000

Anyiko Sec

location
North East Ugenya (in Ugenya)
year first funded
2004
action
Construction Of 2 Neewest Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 987,620
estimate
Ksh 750,000

Nyamasare Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Roofing; Plastering Of Wall And Floor; Fitting Of Windows And Door; Paintings; Wiring For Electrification
output
2 Newest Classrooms
implementation status
Stalled
total cost
Ksh 980,000
estimate
Ksh 1,703,640

St. Joseph Ochiel Primary School

location
North Ugenya (in Ugenya)
year first funded
2006
action
Completion Of 1 Classroom& Construction Of 1 Classroom;Walling;Plastering;Roofing
output
Classroom
implementation status
Complete
total cost
Ksh 911,170
estimate
Ksh 900,000

Hawagaya Primary School

location
North Uholo (in Ugenya)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 901,389
estimate
Ksh 1,000,000

Yenga Secondary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Construction Of 2 Classrooms-Substructure,Wallingfittings, Plastering, Painting
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 900,000
estimate
Ksh 1,000,000

Suwinga Primary School

location
West (in Ugenya)
year first funded
2005
action
Plastering flooring, doors and windows, electricity, painting and Furniture
output
Standardized
implementation status
Complete
total cost
Ksh 889,762
estimate
Ksh 750,000

Ugana Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Walling, Plastering, Roofing Of 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 846,280
estimate
Ksh 1,000,000

St. Peters Rambula Mixed Secondary School

location
West Uholo (in Ugenya)
year first funded
2006
action
Roofing;Fitting Door And Windows;Floor;Paintings;Plastering Walls,Floor;Electrification
output
Standardized Two Classrooms
implementation status
Complete
total cost
Ksh 835,330
estimate
Ksh 1,500,000

Lukongo Luduha Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Walling, Roofing, Intallation Doors & Windows Of 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 834,600
estimate
Ksh 1,000,000

Nzoia Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 814,760
estimate
Ksh 1,000,000

Ukwala Sec

location
Ukwala (in Ugenya)
year first funded
2009
action
Renovation Of Tuition Block
output
Standardized Tuition Block
implementation status
Stalled
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Sifuyo Health Centre

location
West Ugenya (in Ugenya)
year first funded
2006
action
1 Staff House Completion; 1 Staff Toilet Completion; Building Refurbishment; Borehole Construction With Electricity Water Pump;Water Storage Tank Fixing; Gate Light Installation
output
1.Completed Staff House And Toilet2.Refurbished Existing Building3.Permanent Water Supply From Borehole
implementation status
Ongoing
total cost
Ksh 800,000
estimate
Ksh 1,266,368

Umer Primary School

location
East Ugenya (in Ugenya)
year first funded
2006
action
Constructionsof 4 Classrooms;Walling;Roofing;Plastering;Fittings;Painting
output
4 Classrooms
implementation status
Ongoing
total cost
Ksh 773,410
estimate
Ksh 150,000

Nyamsenda Primary School

location
North East Ugenya (in Ugenya)
year first funded
2004
action
Plastering Of Walls,Floor;Fittings Of Windows,Doors;Paintings;Electrification
output
Standardized 4 Classrooms
implementation status
Complete
total cost
Ksh 766,216
estimate
Ksh 1,133,216

Bar Atheng Primary School

location
East (in Ugenya)
year first funded
2004
action
Construction Of Ecd Class And Admin BlockPaintings;Electrification;Furniture;Constructing Verandah;Furnishing
output
Standardized Offices, 1 Classroom
implementation status
Ongoing
total cost
Ksh 745,832
estimate
Ksh 500,000

Nyasanda Technical Institute

location
West Uholo (in Ugenya)
year first funded
2008
action
Construction Of 2 Newest Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 718,872
estimate
Ksh 1,000,000

Kanyaudo Primary School

location
North West Ugenya (in Ugenya)
year first funded
2005
action
Completion Of Staffroom, Fitting Doors And Windows, Plastering And Painting, Ceiling Board
output
Staffroom, 2 Door Pit Latrine, 1500 Ltr Water Tank
implementation status
Complete
total cost
Ksh 718,630
estimate
Ksh 200,000

Got Nanga Primary School

location
North East Ugenya (in Ugenya)
year first funded
2006
action
Completion Of 2 Classrooms And Construction Of 1 Classroom
output
Three Classrooms
implementation status
Complete
total cost
Ksh 712,000
estimate
Ksh 562,000

Sigomre Primary School

location
East Uholo (in Ugenya)
year first funded
2007
action
Construction Of 1 ClassWalling, Roofing, Installation Of Windows, Painting Of 2 Classrooms
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 707,700
estimate
Ksh 1,000,000

Udhine Primary School

location
Ukwala (in Ugenya)
year first funded
2008
action
Construction Of 2 Classroomss
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 705,000
estimate
Ksh 1,000,000

Inungo Secondary School

location
East Ugenya (in Ugenya)
year first funded
2008
action
Walling, Roofing, Fittings Of Doors & Windows, Furniture
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 703,375
estimate
Ksh 1,000,000

Mathiwa Primary School

location
Ukwala (in Ugenya)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 703,000
estimate
Ksh 1,000,000

Mayingo Primary School

location
South Ugenya (in Ugenya)
year first funded
2008
action
Renovation Of 3 Classrooms, Roofing,Plastering, Fixing Doors &Windows, Flooring,Painting
output
3 Classrooms
implementation status
Complete
total cost
Ksh 700,000
estimate
Ksh 700,000

Siranga Sec

location
Ukwala (in Ugenya)
year first funded
2009
action
Construction Of A New Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Muhwayo Primary School

location
North East Ugenya (in Ugenya)
year first funded
2003
action
Construction Of Remaining 3 Classrooms;Plastering;Fitting Of Windows,Doors;Painting
output
Standardized 5 Classrooms
implementation status
Stalled
total cost
Ksh 700,000
estimate
Ksh 700,000

Konya Secondary School

location
East Ugenya (in Ugenya)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 697,565
estimate
Ksh 3,048,000

Mbosie Primary School

location
West Uholo (in Ugenya)
year first funded
2008
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 693,480
estimate
Ksh 3,130,760

Milambo Primary School

location
North West Ugenya (in Ugenya)
year first funded
2006
action
Renovation Of 5 Classrooms, Construction Of 2 Classrooms, Verrandah, Plastering, Fitting Windows & Doors, Painting
output
5 Classrooms Renovated,2 Classrooms Complete
implementation status
Complete
total cost
Ksh 658,561
estimate
Ksh 400,000

Sidindi Primary School

location
South Ugenya (in Ugenya)
year first funded
2009
action
Renovation Of 3 Classrooms, Roofing,Plastering, Fixing Doors &Windows Panespainting
output
3 Classrooms
implementation status
Complete
total cost
Ksh 657,906
estimate
Ksh 1,500,000

Rang'Ala Boys Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Elecrification Of 4 Classrooms And Office And Renovation Of 3 Staff Houses
output
3 Staff Houses And 4 Electrified Classroom And 1 Office
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 1,000,000

Ulwani Primary School

location
West (in Ugenya)
year first funded
2006
action
Plastering Of Walls,Floor;Paintings;Electrification
output
Standardized
implementation status
Ongoing
total cost
Ksh 650,000
estimate
Ksh 750,000

Mauna Primary School

location
North East Ugenya (in Ugenya)
year first funded
2007
action
Walling, Fittings, Roofing, Palstering Of 2 Classrooms
output
Completion Of 2 Classrooms
implementation status
Complete
total cost
Ksh 626,780
estimate
Ksh 1,000,000

Sirandumb Primary School

location
Central Ugenya (in Ugenya)
year first funded
2005
action
Plasering Ofwalls,Floor;Fittings Of Windows,Doors;Paintings
output
Standardized
implementation status
Stalled
total cost
Ksh 611,600
estimate
Ksh 4,800,000

Sifuyo Primary School

location
West Ugenya (in Ugenya)
year first funded
2006
action
Roofing; Ceiling Board; Slabbing Floor; Plastering Floor,Walls;Fitting Of Windows,Doors; Staffroom Chairs,Tables ;Painting; Office Furniture
output
Administration Block
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 1,200,000

Uring Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Plastering Walls And Floor;Fitting Os Windowest Panes;Painting
output
Renov Of 4C/Rm And Office And Construction Of 1 C/Rm
implementation status
Complete
total cost
Ksh 600,000
estimate
Ksh 500,000

Sikinga Kondiek

location
Ukwala (in Ugenya)
year first funded
2008
action
Complete Electrification Projects Within The Constituency
output
Complete Electrification
implementation status
Ongoing
total cost
Ksh 593,813
estimate
Ksh 593,813

Nyasanda Community Secondary School

location
West Uholo (in Ugenya)
year first funded
2007
action
Electrificatio;Plastering Of 1 Classroom & Painting;Roofing Of 1 Classroom; Fitting Windows & Doors
output
1.Lightingtwo Classrooms And Office Block2.Completion Of 2 Classrooms And Small Office
implementation status
Complete
total cost
Ksh 544,194
estimate
Ksh 544,194

Mauna Primary School

location
West (in Ugenya)
year first funded
2006
action
Plastering Of Walls;Fittings Of Windows,Doors;Paintings
output
Standardized Two Classrooms
implementation status
Ongoing
total cost
Ksh 526,460
estimate
Ksh 462,690

Hawagaya Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Construction Of 1 Classrooms
output
1 Classroom
implementation status
Complete
total cost
Ksh 526,140
estimate
Ksh 800,000

Ukalama Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Construction Of 1 Classroom, Installation Of Windows & Doors
output
1 Classroom
implementation status
Stalled
total cost
Ksh 521,820
estimate
Ksh 500,000

Bar Oninge Primary School

location
North West Ugenya (in Ugenya)
year first funded
2006
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 519,253
estimate
Ksh 600,000

Markuny Primary School

location
South Ugenya (in Ugenya)
year first funded
2006
action
Roofing;Fitting If Windows,Doors;Plastering Walls,Floor;Paintings;Paintings
output
One Office Block
implementation status
Complete
total cost
Ksh 510,750
estimate
Ksh 500,000

Luthehe Primary School

location
East Ugenya (in Ugenya)
year first funded
2006
action
Completion of 1 Classrooms;Plastering;Fitting;Roofing;Painting
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 508,000
estimate
Ksh 500,000

Asango Primary School

location
North Uholo (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 506,241
estimate
Ksh 500,000

Uluthe Primary School

location
East Uholo (in Ugenya)
year first funded
2009
action
Constructjion Of 1 Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 670,000

Humwend Primary School

location
West Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
Acomplete Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 0

Markuny Primary School

location
South Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 1,440,000

Nyiera Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 350,000

Ruwe Primary School

location
South Ugenya (in Ugenya)
year first funded
2009
action
Construction Of Newest Classroom
output
1 Standadized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 2,105,000

Simenya SeSchool

location
South Ugenya (in Ugenya)
year first funded
2008
action
Completion Of 2 Clroomswalling, Plastering, Painting Of 2 Clasrrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Konya Primary School

location
East Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

St. Joseph Ochiel Primary School

location
North Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 2,500,000

Sega Water

location
North Ugenya (in Ugenya)
year first funded
2008
action
Construction Of Water Pans, Borehole, Shallowest Well And Water Stream For Laboratories
output
Water Pans, Borehole, Shallowest Well, Water Stream
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Ng'Ang'A Primary School

location
North Ugenya (in Ugenya)
year first funded
2008
action
Construction Of 1 Classroom Walling, Roofing, Electrical Instalation Of 2 Classrooms
output
1 Classroom
implementation status
Complete
total cost
Ksh 500,000
estimate
Ksh 813,030

Sega Girls Boarding Primary School

location
North Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Doho Primary School

location
Ukwala (in Ugenya)
year first funded
2009
action
Construction Of A New Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Buranga Primary School

location
East Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 1,859,800

Ulwani Primary School

location
West Uholo (in Ugenya)
year first funded
2009
action
Construction Of A Classroom
output
One Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 2,196,640

Mudaho Primary School

location
West Uholo (in Ugenya)
year first funded
2007
action
Rennovation Of 4 Classrooms
output
4 Classrooms Renovated
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Ugunja Water

location
West Uholo (in Ugenya)
year first funded
2008
action
Construction of Water Pan, Borehole, Shallowest Well, Water Stream For Laboratories
output
Water Pans, Borehole, Shallowest Well, Water Stream
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Got Rembo Primary School

location
North West Ugenya (in Ugenya)
year first funded
2009
action
Constructin Of A Newest Classsroom
output
One Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Sihay Primary School

location
North East Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
One Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Mauna Primary School

location
North East Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
One Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Bar Ober Water

location
North East Ugenya (in Ugenya)
year first funded
2008
action
Construction Of Water Pans, Borehole, Shallowest Well And Water Stream For Laboratories
output
Water Pans, Borehole, Shallowest Well, Water Stream
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Dendyo Primary School

location
Central Ugenya (in Ugenya)
year first funded
2009
action
Contruction Of One Newest Classroom
output
One Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 450,000

Ngunya Primary School

location
Central Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
One Standardized Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 420,000

Lwoka Primary School

location
East Uholo (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
Standardized One Classroom
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 457,975

Sigomre Water

location
East Uholo (in Ugenya)
year first funded
2008
action
Constuction Of Water Pan, Borehole, Shallowest Well, Water Stream For Laboratories
output
Water Pans, Borehole, Shallowest Well, Water Stream
implementation status
Stalled
total cost
Ksh 500,000
estimate
Ksh 500,000

Uriya Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Walling, Apinting, Roofing Of 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 499,777
estimate
Ksh 500,000

Harungu Primary School

location
North Ugenya (in Ugenya)
year first funded
2008
action
Construction Of 3, 10 Door Pit Latrines
output
3 Latrines
implementation status
Complete
total cost
Ksh 490,000
estimate
Ksh 500,000

Kamrembo Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Construction Of 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 487,820
estimate
Ksh 500,000

Hafumbre Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Plastering, Roofing, Painting Of 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 487,294
estimate
Ksh 500,000

Nyasanda Primary School

location
West Uholo (in Ugenya)
year first funded
2008
action
Walling, Roofing, Plastering Of 2 Classrooms, Painting
output
2 Classrooms
implementation status
0Ngoing
total cost
Ksh 475,490
estimate
Ksh 1,000,000

Ugolwe Primary School

location
South Ugenya (in Ugenya)
year first funded
2006
action
Construction Of 4 Classrooms And One Office
output
4 C/Rms And 1 0Ffice
implementation status
Complete
total cost
Ksh 470,755
estimate
Ksh 500,000

Magombe Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Completion Of 2 Standardized Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 463,256
estimate
Ksh 200,000

Sikang' Primary School

location
South Ugenya (in Ugenya)
year first funded
2006
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Complete
total cost
Ksh 460,135
estimate
Ksh 1,000,000

Murumba Primary School

location
East Ugenya (in Ugenya)
year first funded
2005
action
Construction of 1 Classroom,Completion of 4 Classrooms; Walling; Roofing; Plastering; Painting; Electricity Piping; Fitting; Flooring
output
Construction Of 1 And Complation Of 4 Classrooms
implementation status
Complete
total cost
Ksh 450,890
estimate
Ksh 700,000

Jera Primary School

location
North East Ugenya (in Ugenya)
year first funded
2006
action
Construction of 4 classrooms, rehabilitate teachers & pupils toilets + Complete Special Unit Class and Renovate 4 Classrooms
output
1.Standardized Special Unit2.Standardized 4 Classrooms3.Standardized Staffroom4.Standardized Toilets
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 2,067,018

Sikang' Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom & Completion Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 450,000

Nyalenda Primary School

location
East Ugena (in Ugenya)
year first funded
2006
action
Renovation of 5 Classrooms;Plastering;Fittingsof Doors And Windows;Roofing One Classroom;Extension Of Veranda;Painting
output
5 Classrooms
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Nyalenya Primary School

location
North Ugenya (in Ugenya)
year first funded
2006
action
Renovation Of 5 Classrooms, Plastering Walls, Door/Window Fitting,Roofing Of 1 Classroom,Extension Of Veranda Hand Painting
output
5 Classrooms
implementation status
Complete
total cost
Ksh 450,000
estimate
Ksh 500,000

Nyaharwa Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Roofing, Plastering, Painting 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 423,708
estimate
Ksh 500,000

Ralak Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Walling, Palstering, Roofing Of 1 Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 423,600
estimate
Ksh 850,000

St. Josephs Ulanda Primary School

location
North Uholo (in Ugenya)
year first funded
2007
action
Plasteringof Walls,Floor;Fittings Of Windows,Doors;Paintings;Electrification
output
Completion Of 1 Classrooms
implementation status
Stalled
total cost
Ksh 420,000
estimate
Ksh 2,000,000

Sijimbo Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Completion-Of 1 Clroom, Plastering Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 418,980
estimate
Ksh 500,000

Got Omalo Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Admin Block
output
Admin Block
implementation status
Ongoing
total cost
Ksh 414,458
estimate
Ksh 500,000

Rambula Primary School

location
West Uholo (in Ugenya)
year first funded
2006
action
Plastering flooring, doors and windows, painting and Furniture
output
Standardized Fully
implementation status
Complete
total cost
Ksh 404,254
estimate
Ksh 450,000

Nyalenda Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
n/a
output
Standardized 3 Classrooms
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 8,000,000

Uchola Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Construction of 5 Classrooms & Office, walls and floor Plastering, Fitting Windows And Doors, Painting + Renovating 3 Classrooms
output
Standardized 5 Classrooms And An Office
implementation status
Ongoing
total cost
Ksh 400,000
estimate
Ksh 1,875,000

Masamra Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Fitting Windows,Doors;Plastering Of Floors,Walls;Painting
output
Two Modern Classrooms
implementation status
Stalled
total cost
Ksh 400,000
estimate
Ksh 400,000

Sikalame Primary School

location
South Ugenya (in Ugenya)
year first funded
2006
action
Walls,Roofingand Fitting OfshuttersElectification;Painting;General Repair;Two Roomd
output
A Complete Standardized Classroom
implementation status
Ongoing
total cost
Ksh 380,060
estimate
Ksh 510,000

Tihinga Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Completion Of 3 Classrooms Roofing;Plastering Walls/Floor;Fittings Of Windowest Doors;Painting
output
Completion Of Three Cl/Rms
implementation status
Complete
total cost
Ksh 380,000
estimate
Ksh 974,910

Lunjre Primary School

location
East (in Ugenya)
year first funded
2004
action
Plastering Of Floors;Fitting Windowest Panes In 3 Classrooms And 9 Steel Doors;Fencing School Compound;Electrification
output
Rennovation Of 9 Classrooms And Office Block
implementation status
Complete
total cost
Ksh 380,000
estimate
Ksh 800,000

Ng'Op Misenigni Primary School

location
North Uholo (in Ugenya)
year first funded
2007
action
Walling, Plastering, Painting Of 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 371,000
estimate
Ksh 600,000

Ginga Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Plastering Of Walls;Cementing Of The Floors;Fittings Of The Windows;Paintings
output
Completion Of Two Classrooms
implementation status
Complete
total cost
Ksh 370,000
estimate
Ksh 500,000

Wang' Otong Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Fo 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 366,760
estimate
Ksh 500,000

St. Peters Komoro Primary School

location
East Ugenya (in Ugenya)
year first funded
2008
action
Completion Of 1 ClassWalling, Roofing, Installation Of Windows & Doors Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 361,360
estimate
Ksh 500,000

Ichinga Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Construction;Plastering Walls,Floor;Fitting Of Windows,Doors;Paintings
output
1.Standardized Administration Block; 2. 4 Classrooms
implementation status
Ongoing
total cost
Ksh 353,000
estimate
Ksh 1,111,350

Sango Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Constructingecd Classrooms;Plastering Walls Of 8 Classroms;Fittings Of Windows&Doors
output
Standardized Classrooms
implementation status
Stalled
total cost
Ksh 352,000
estimate
Ksh 500,000

Lela Primary School

location
North East Ugenya (in Ugenya)
year first funded
2004
action
Window Fitting, doors, Plastering walls and Floors, Fitting Glass Panes, Classroom Tables,Chairs,Cabinets
output
Standardized 7 Classrooms
implementation status
Ongoing
total cost
Ksh 350,000
estimate
Ksh 1,500,000

Ohando Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Wall Plastering for 8 Classrooms, Painting Inner Walls, Fencing The School, Replacing Mud Walls With Bricks, and Gate
output
1.Plastering 8 Classes2.Replacing Mud Walls3.Fencing4.Gate
implementation status
Stalled
total cost
Ksh 350,000
estimate
Ksh 600,000

Luru Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Constructjion Of 1 Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 350,000
estimate
Ksh 500,000

Uyundo Primary School

location
North Ugenya (in Ugenya)
year first funded
2006
action
Construction Of 1 Classroom;Walling;Foundation;Roofing;Plastering;Painting
output
1 Classroom
implementation status
Complete
total cost
Ksh 350,000
estimate
Ksh 500,000

Mayingo Primary School

location
South Ugenya (in Ugenya)
year first funded
2006
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Stalled
total cost
Ksh 341,540
estimate
Ksh 1,000,000

Lwanda Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Plastering, Installation Of Windows & Doors
output
3 Classrooms
implementation status
Stalled
total cost
Ksh 335,000
estimate
Ksh 800,000

Kirind Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Roofing;Plastering Walls,Floors;Fitting Of Windows;Painting
output
Completion Of 2 Classrooms
implementation status
Complete
total cost
Ksh 331,000
estimate
Ksh 1,000,000

Ligala Kabiero Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Buying Timber & Iron Sheets For Roofing; wall/floor Plastering; Fittings Of Door & Windows; Constructing Black Walls & Painting
output
Standardized 1 Classroom
implementation status
Complete
total cost
Ksh 330,000
estimate
Ksh 350,000

Ugambe Primary School

location
North Ugenya (in Ugenya)
year first funded
2004
action
Casting The Floor Spread Of 3 Classrooms;Raising The Paring Slab Of 5 Classrooms;Construction Of Latrine;Fittings
output
3 Screed Classroom, Floors, Latrine, Slab
implementation status
Complete
total cost
Ksh 325,490
estimate
Ksh 961,640

Lwoka Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Roofing;Plastering;Fitting;Painting;Flooring
output
Completion Of 1 Classrooms
implementation status
Complete
total cost
Ksh 320,090
estimate
Ksh 1,721,500

Ligala Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Roofing;Fitting Of Windows,Doors;Plastering Of Walls/Floor;Paintings
output
Administration Block And Staffroom
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 11,000,000

Udira Kamrembo Primary School

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Plastering Of Floors;Fitting Windows;Painting
output
Standardized 8 Classrooms
implementation status
Stalled
total cost
Ksh 300,000
estimate
Ksh 780,000

Equator Special School

location
West Uholo (in Ugenya)
year first funded
2008
action
Purchase Of 30 Double Decker Beds, 60 Matressess And 3 Fire Extinguishers
output
30 Beds, 60 Matressess And 3 Fire Extinguishers
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Ligose Primary School

location
North Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 2 Classrooms
output
2 Classrooms
implementation status
Ongoing
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Sigomre Small Home

location
East Uholo (in Ugenya)
year first funded
2008
action
Purchase Of Furniture
output
Furniture
implementation status
Complete
total cost
Ksh 300,000
estimate
Ksh 300,000

Ugolwe Primary School

location
South Ugenya (in Ugenya)
year first funded
2009
action
Construction Of A Newest Classroom
output
1 Standardized Classroom
implementation status
Stalled
total cost
Ksh 300,000
estimate
Ksh 500,000

Ogeda Primary School

location
West (in Ugenya)
year first funded
2005
action
Building The Walls Of 4 Classrooms;Fitting Windows(14);Fitting 4 Doors;Rootings;Plastering 2 Classrooms
output
Standardized 8 Classrooms
implementation status
Ongoing
total cost
Ksh 292,000
estimate
Ksh 500,000

Madungu Primary School

location
East Uholo (in Ugenya)
year first funded
2007
action
Completion Of One Classroom
output
One Classroom
implementation status
Complete
total cost
Ksh 291,960
estimate
Ksh 291,960

Ukwala B' Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Construction Of 1 Classsroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 288,590
estimate
Ksh 500,000

Yenga Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Of 2 Classrooms
output
2 Classroom
implementation status
Complete
total cost
Ksh 284,700
estimate
Ksh 500,000

Lifunga Primary School

location
Ukwala (in Ugenya)
year first funded
2008
action
Completion Of 1 Classroom-Walling, Plastering, Roofing
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 279,900
estimate
Ksh 500,000

Luanda Primary School

location
East Ugenya (in Ugenya)
year first funded
2007
action
Construction of One Classroom;Walling;Roofing;Plastering;Painting
output
2 Classroom
implementation status
Complete
total cost
Ksh 263,250
estimate
Ksh 600,000

Jera Sec

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Ring Beam, Roofing, Doors & Windows, Plumbing, Electrical, Fitting & Finishes, Painting
output
3-Bedroomed Staff Residential House(1 Unit)
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 1,634,064

Siror Primary School

location
North (in Ugenya)
year first funded
2006
action
Wall Plastering, flooring, dors, windowd, painting, Fencing, gate
output
1.Complete Fixing Windows And Doors; 2.Fencing The School; 3 Fitting The Gate
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 600,000

Sirisia Sec

location
North East Ugenya (in Ugenya)
year first funded
2005
action
Construction of Admin Block + 2 Classroomsm school fencing and erecting School Gate
output
1.Standardized Two Classroms
implementation status
Ongoing
total cost
Ksh 250,000
estimate
Ksh 1,500,000

Ulowe Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 250,000

Konjira Primary School

location
West Uholo (in Ugenya)
year first funded
2009
action
Completion Of 2 Classrooms-Fitting Windowest Panes And Painting
output
Two Modern Classrooms
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 250,000

Waliera Primary School

location
North East Ugenya (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 250,000
estimate
Ksh 250,000

Lwero Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 248,600
estimate
Ksh 500,000

Mahwi Primary School

location
East Ugenya (in Ugenya)
year first funded
2008
action
Plastering, Painting, Fittings Of 1 Classroom
output
1 Classroom
implementation status
Ongoing
total cost
Ksh 237,700
estimate
Ksh 500,000

Diraho Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 230,350
estimate
Ksh 500,000

Simur Primary School

location
Ukwala (in Ugenya)
year first funded
2006
action
Completion Of 1 Classroom
output
1 Classroom
implementation status
Complete
total cost
Ksh 224,683
estimate
Ksh 500,000

North Uholo Sports Centre

location
North Uholo (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

West Uholo Sports Centre

location
West Uholo (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

Ukwala Sports Centre

location
Ukwala (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

North Ugenya Sports Centre

location
North Ugenya (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

East Ugenya Sports Centre

location
East Ugenya (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

South Ugenya Sports Centre

location
South Ugenya (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

West Ugenya Sports Centre

location
West Ugenya (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 213,637
estimate
Ksh 9,387,065

Musiko Primary School

location
North Uholo (in Ugenya)
year first funded
2005
action
Roofing
output
Standardized 2 Classrooms
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 560,000

Tingare Secondary School

location
North Uholo (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 200,000

Lolwe Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 200,000

Mudhiero Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 200,000

Nyambiro Primary School

location
North Ugenya (in Ugenya)
year first funded
2007
action
Completion Of 2 Classroom
output
2 Classroom
implementation status
Complete
total cost
Ksh 200,000
estimate
Ksh 500,000

Fencing Cdf Office YaRoad

location
West Uholo (in Ugenya)
year first funded
2008
action
Permanently Fence Newly Allocated Cdf Office Yard
output
Permanently Fenced Cdf Office Yard
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 200,000

Ulumba Primary School

location
North East Ugenya (in Ugenya)
year first funded
2006
action
Plasterng Of Walls,Floors;Fittings Of Windows,Doors;Painting
output
1.Building Standardized 4 Newest Classrooms; 2.Fitting And Finishing 4 Newest Classrooms
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 3,000,000

Ligega Primary School Health Centre

location
North East Ugenya (in Ugenya)
year first funded
2006
action
Water System;Fencing;Gate;Electrical Piping
output
Secured Facility With Sufficient Water And Power Supply
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Masamra Primary School

location
North East Ugenya (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 200,000
estimate
Ksh 200,000

Dendyo Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Constructing Two Classrooms;Fittings Of Windows,Doors;Painting
output
Standardized 2 Classrooms
implementation status
Ongoing
total cost
Ksh 200,000
estimate
Ksh 600,000

Central Ugenya Sports

location
Central Ugenya (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 187,740
estimate
Ksh 9,387,065

Uluthe Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Constructjion Of 1 Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 180,190
estimate
Ksh 500,000

Got Nanga

location
North East Ugenya (in Ugenya)
year first funded
2008
action
Construction Of 2 Latrines, 4 Door Each
output
2 Latrines Blocks
implementation status
Complete
total cost
Ksh 180,000
estimate
Ksh 197,000

Daho Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Construction Of One Classroom
output
Construction Of Complete Classroom
implementation status
Stalled
total cost
Ksh 178,300
estimate
Ksh 246,450

Tingare Development Committee Police Post

location
North Uholo (in Ugenya)
year first funded
2006
action
Construction Of 8 Living Rooms;Construction Of Office;Construction Of 2 Cells(Male/Female)
output
1.8 Standardized Living Rooms For Police
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 1,500,000

Ruwe Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 150,000

Sidindi Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 150,000

Nyasanda Primary School

location
West Uholo (in Ugenya)
year first funded
2007
action
Construction Of One Classroom
output
1 Classroom
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 150,000

Ugunja Primary School

location
West Uholo (in Ugenya)
year first funded
2007
action
Construction Of One Classroom
output
One Classroom
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 150,000

Sihay Primary School

location
North East Ugenya (in Ugenya)
year first funded
2007
action
Cementing 3 Classrooms,Floors; ;Construction 2 Newest Classrooms
output
1.Constructing 4 Classrooms; Cementing Existing Classroom Floors
implementation status
Stalled
total cost
Ksh 150,000
estimate
Ksh 500,000

Got Rembo Primary School

location
North West Ugenya (in Ugenya)
year first funded
2007
action
Extension Of Verandah Of 4 Classrooms
output
Verandah For 4 Classrooms
implementation status
Complete
total cost
Ksh 140,299
estimate
Ksh 200,000

St. Pauls Sigomre Secondary School

location
East Uholo (in Ugenya)
year first funded
2009
action
Purchase Of Furniture For The Computer Laboratory
output
Newest Furniture For Computer Lab
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 119,000

Ninga Primary School

location
East Uholo (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Simerro Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of One Classroom
output
-
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Rang'Ala Girls Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of One Classroom
output
-
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Murumba Yiro Primary School

location
South Ugenya (in Ugenya)
year first funded
2007
action
Construction Of 1 Classroom
output
-
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Orao Primary School

location
North Uholo (in Ugenya)
year first funded
2007
action
n/a
output
-
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Ninga Primary School

location
East Uholo (in Ugenya)
year first funded
2006
action
Electrification; ;Building Of Three Classrooms And Plastering Wallls And Floors As Well As Fitting Windows And Doors
output
1.All Classrooms Sto Have Electricity; 2.Standardized 3 Classrooms
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 15,000,000

Konjra Primary School l

location
West Uholo (in Ugenya)
year first funded
2007
action
Construction Of One Classroom
output
One Classroom
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 100,000

Mbosie Primary School

location
West (in Ugenya)
year first funded
2007
action
Completing Administration Block
output
1.Modern Administration Block; 2.Proper Fencing To Stop Tresspass
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 750,000

Ambira Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Construction Of Floor,Walls;Plasering Of Floor,Walls;Fittings Of Windows,Doors;Roofings;Paintings
output
Standardized Two Classrooms
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 1,281,350

Umina Primary School

location
Central Ugenya (in Ugenya)
year first funded
2006
action
Painting2Plastering Of Walls,Floor;Fitting Of Doors,Windows;Electrification
output
1.Glasses2.Floors3.Doors4.Standardized Rooms
implementation status
Ongoing
total cost
Ksh 100,000
estimate
Ksh 500,000

Yuaya Primary School

location
North Uholo (in Ugenya)
year first funded
2006
action
Building Two Classrooms
output
Standardized Two Classrooms
implementation status
Stalled
total cost
Ksh 100,000
estimate
Ksh 600,000

East Uholo Sports Centre

location
East Uholo (in Ugenya)
year first funded
2008
action
Purchase Of Foot Balls, Net Balls, Team Uniforms, Preparation Of Sports Fields, Fixing Of Net Ball Poles, Net Ball Fields
output
Footballs, Netballs, Team Uniforms, Netball Poles, Net Ball Fields
implementation status
Stalled
total cost
Ksh 93,870
estimate
Ksh 9,387,065

St. Domnic Uloma Primary School

location
North Uholo (in Ugenya)
action
Roofing Ofone Classroom;Plaseringof Walls,Floor;Fitting Ofwindows,Doors
output
Completed Nine Classrooms
implementation status
Stalled
total cost
Ksh 0
estimate
Ksh 600,000