The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Vihiga

Mang'Ong'O Water Project

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Construction & Piping
output
Piped Water
implementation status
Pipe Laying In Progress
total cost
Ksh 3,600,000
estimate
Ksh 3,000,000

Chango Secondary School

location
C/Maragoli (in Vihiga)
year first funded
2003
action
Construction
output
Kitchen, H1Science &
implementation status
Phase 3 In Progress
total cost
Ksh 2,798,954
estimate
Ksh 3,053,192

Vihiga Secondary School

location
C/Maragoli (in Vihiga)
year first funded
2005
action
Purchase & Re- Roofing
output
Generator & New Roof
implementation status
Phase 2 Completed
total cost
Ksh 2,400,000
estimate
Ksh 1,400,000

Gavalagi Secondary School

location
S/Maragoli (in Vihiga)
year first funded
2006
action
Construction
output
Classrooms
implementation status
Phase 1 In Progress
total cost
Ksh 2,300,000
estimate
Ksh 8,222,305

Madzuu Kisienya Water Project

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Construction & Piping
output
Piped Water
implementation status
Phase 2 In Progress
total cost
Ksh 2,300,000
estimate
Ksh 8,200,000

Chanda Adc Primary School

location
Wamuluma (in Vihiga)
year first funded
2003
action
Renovation & Electrification
output
Classrooms & Electricity
implementation status
Phase 1 & 2 Completed
total cost
Ksh 2,200,000
estimate
Ksh 1,777,000

Magui Secondary School

location
Lugaga (in Vihiga)
year first funded
2003
action
Construction
output
Laboratory & Classrooms
implementation status
Lab Shell Completed
total cost
Ksh 2,003,000
estimate
Ksh 1,103,000

Vigulu Mahanga Water Project

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Renovation
output
Piped Water
implementation status
Phase I Completed
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Hambale Youth Polytechnic

location
Wamuluma (in Vihiga)
year first funded
2005
action
Construction
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 1,940,000
estimate
Ksh 1,046,460

Busamo Ecd

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Storey Building
implementation status
Phase 2 In Progress
total cost
Ksh 1,900,000
estimate
Ksh 1,100,000

Mbihi Secondary School

location
Wamuluma (in Vihiga)
year first funded
2003
action
Renovation & Equipping
output
Laboratory
implementation status
Phase I Completed
total cost
Ksh 1,850,000
estimate
Ksh 400,000

Idereli Secondary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Construction & Equipping
output
Laboratory & Library
implementation status
Phase I Completed
total cost
Ksh 1,850,000
estimate
Ksh 320,000

Kerongo Secondary School

location
Mung'Oma (in Vihiga)
year first funded
2003
action
Construction & Equipping
output
Lab & Admin Block
implementation status
Phase 3 In Progress
total cost
Ksh 1,800,000
estimate
Ksh 1,678,064

Kegoye Secondary School

location
Wamuluma (in Vihiga)
year first funded
2003
action
Renovation & Equipping
output
Library
implementation status
Phase 1 & 2 Completed
total cost
Ksh 1,785,000
estimate
Ksh 835,000

Madira Secondary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Library Construction
output
Library
implementation status
Phase 2 In Progress
total cost
Ksh 1,400,000
estimate
Ksh 2,136,265

Vigina Secondary School

location
Mung'Oma (in Vihiga)
year first funded
2003
action
Construction
output
Dining Hall
implementation status
Phase 2 Completed
total cost
Ksh 1,400,000
estimate
Ksh 694,510

Ingidi Mkombozi Sec

location
Lugaga (in Vihiga)
year first funded
2007
action
Construction Of Class Rooms
output
Classrooms
implementation status
On Going
total cost
Ksh 1,400,000
estimate
Ksh 1,500,000

South Maragoli Youth Polytechnic

location
S/Maragoli (in Vihiga)
year first funded
2005
action
Construction
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 1,300,000
estimate
Ksh 1,272,267

Masana Secondary School

location
S/Maragol (in Vihiga)
year first funded
2003
action
Construction & Equipping
output
Laboratory
implementation status
Phase I & 2 Completed
total cost
Ksh 1,300,000
estimate
Ksh 773,175

Kengendirova Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 3 In Progress
total cost
Ksh 1,250,000
estimate
Ksh 900,000

Kidundu Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Construction
output
-
implementation status
Phase 3 In Progress
total cost
Ksh 1,250,000
estimate
Ksh 1,216,500

Hambale Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Construction
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 1,150,000
estimate
Ksh 8,735,000

Vumale Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Construction
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 1,150,000
estimate
Ksh 550,000

Keveye Polytechnic

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Construction
output
Dormitory Block
implementation status
Phase 1 Completed
total cost
Ksh 1,140,000
estimate
Ksh 1,491,350

Lodondo Water Project

location
S/Maragoli (in Vihiga)
year first funded
2005
action
Renovation
output
Piped Water
implementation status
Phase 1 In Progress
total cost
Ksh 1,100,000
estimate
Ksh 7,400,000

Bugamagi Health Centre

location
Lugaga (in Vihiga)
year first funded
2004
action
Construction
output
Health Centre
implementation status
Phase 1 & 2 Cmpleted
total cost
Ksh 1,090,000
estimate
Ksh 690,000

Mbihi Primary School

location
Wamuluma (in Vihiga)
year first funded
2005
action
Construction
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 1,075,000
estimate
Ksh 825,000

Emanda Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
4 Classrooms Renovated
total cost
Ksh 1,050,000
estimate
Ksh 750,000

Vihiga Health Centre

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Construction
output
Maternity Block
implementation status
Phase 1 Completed
total cost
Ksh 1,050,000
estimate
Ksh 1,200,000

Matsigulu Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Construction & Renovation
output
Classrooms
implementation status
3 Classrooms Constructed
total cost
Ksh 1,000,000
estimate
Ksh 551,060

Lduku Health Centre

location
Wamuluma (in Vihiga)
year first funded
2003
action
Completion &
output
Health Centre
implementation status
Phase I & 2 Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Mahanga Security Police Post

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Construction
output
Police Post & Staff Houses
implementation status
Phase I Completed
total cost
Ksh 1,000,000
estimate
Ksh 965,270

Navuhi Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms & Adm. Block
implementation status
Phase 2 Completed
total cost
Ksh 950,000
estimate
Ksh 484,540

Mukuli Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 & 2 Completed
total cost
Ksh 950,000
estimate
Ksh 588,834

Igakara Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 950,000
estimate
Ksh 664,311

Ihyagalo Primary School

location
Mung'Oma (in Vihiga)
year first funded
2003
action
Construction & Renovation
output
Classrooms & Admin, Block
implementation status
Phase I & 2 Completed
total cost
Ksh 925,000
estimate
Ksh 500,000

Chavavo Secondary School

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Construction
output
Library
implementation status
Shell Completed
total cost
Ksh 925,000
estimate
Ksh 700,000

Induyani Bridge

location
Wamuluma (in Vihiga)
year first funded
2005
action
Construction
output
Bridge
implementation status
Phase I In Progress
total cost
Ksh 908,000
estimate
Ksh 1,157,805

Mudavadi Girls Secondary School

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Construction & Equipping
output
Laboratory
implementation status
Phase I Completed
total cost
Ksh 900,000
estimate
Ksh 545,000

Womulalu Secondary School

location
C/Maragoli (in Vihiga)
year first funded
2006
action
Construction
output
Classrooms
implementation status
Finishings yet to be done
total cost
Ksh 900,000
estimate
Ksh 1,500,000

Chango Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Renovation & Construction
output
Classrooms & Pit Latrines
implementation status
Phase 2 Completed
total cost
Ksh 900,000
estimate
Ksh 460,280

Kitulu Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 900,000
estimate
Ksh 400,000

Visiru Primary School

location
Lugaga (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 900,000
estimate
Ksh 700,000

Magui Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Administration Block
implementation status
Phase 2 In Progress
total cost
Ksh 850,000
estimate
Ksh 1,094,528

Ikumba Primary School

location
C/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
3 Classrooms Renovated
total cost
Ksh 850,000
estimate
Ksh 600,000

Chavugami Primary School

location
C/Maragoli (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 800,000
estimate
Ksh 600,000

Muhanda Tea Banda

location
Lugaga (in Vihiga)
year first funded
2004
action
Construction
output
Collection Centre Office
implementation status
Phase 3 In Progress
total cost
Ksh 800,000
estimate
Ksh 732,828

Bunandi Tea Buying Centre

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Tea Collection Centre
implementation status
Phase 2 In Progress
total cost
Ksh 800,000
estimate
Ksh 820,850

Lnavi Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Construction
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 800,000
estimate
Ksh 300,000

Gilwadzi Secondary School

location
S/Maragoli (in Vihiga)
year first funded
2003
action
Construction
output
Dining Hall
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 400,000

Enzaro Health Centre

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation Of Solar System
output
Solar Power Supply
implementation status
Phase 2 In Progress
total cost
Ksh 750,000
estimate
Ksh 250,000

Lugaga A, P, Line

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Police Station
implementation status
complete
total cost
Ksh 750,000
estimate
Ksh 0

Mahanga Primary School

location
Mung'Oma (in Vihiga)
year first funded
2003
action
Construction & Renovation
output
Classrooms
implementation status
2 Classrooms Constructed
total cost
Ksh 750,000
estimate
Ksh 400,000

Kisienya Tea Buying Centre

location
MungOma (in Vihiga)
year first funded
2005
action
Renovation & Construction
output
Tea Collection Centre
implementation status
Phase 1 Completed
total cost
Ksh 750,000
estimate
Ksh 400,000

Madzu Primary School

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
5 Classrooms Renovated
total cost
Ksh 725,000
estimate
Ksh 500,000

St. Clare's Maragoli

location
Wamuluma (in Vihiga)
year first funded
2006
action
Construction
output
Classrooms
implementation status
Work In Progress
total cost
Ksh 700,000
estimate
Ksh 700,000

Chanzuvu Primary School

location
Wamuluma (in Vihiga)
year first funded
2003
action
Renovation
output
Classrooms
implementation status
Phase 1 & 2 Completed
total cost
Ksh 700,000
estimate
Ksh 500,000

Kedohi Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 700,000
estimate
Ksh 1,014,910

Muhanda Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
4 Classroms Renovated
total cost
Ksh 650,000
estimate
Ksh 2,120,181

Idavaga Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 650,000
estimate
Ksh 653,580

Kegoye Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 650,000
estimate
Ksh 450,000

Madira Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
4 Classroms Renovated
total cost
Ksh 650,000
estimate
Ksh 350,000

Embaga Primary School

location
Lugaga (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 650,000
estimate
Ksh 450,000

Kisienya Primary School

location
Mung'Oma (in Vihiga)
year first funded
2003
action
Renovation
output
Classrooms
implementation status
4 Classrooms Renovated
total cost
Ksh 600,000
estimate
Ksh 500,000

Central Maragoli Chiefs Office

location
C/Maragoli (in Vihiga)
year first funded
2006
action
Construction
output
Office
implementation status
Finishings yet to be done
total cost
Ksh 600,000
estimate
Ksh 300,000

Vihiga Primary School

location
C/Maragoli (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 600,000
estimate
Ksh 811,987

Buhani Bridge Project

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Construction
output
Bridge
implementation status
Phase 2 Completed
total cost
Ksh 575,000
estimate
Ksh 575,000

Logere Bridge

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Bridge
implementation status
Phase I &2 Completed
total cost
Ksh 550,000
estimate
Ksh 616,000

Lduku Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase I & 2 Completed
total cost
Ksh 550,000
estimate
Ksh 350,000

Hamasana Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 550,000
estimate
Ksh 740,000

Vunandi Primary School

location
Lugaga (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 & 2 Completed
total cost
Ksh 550,000
estimate
Ksh 348,390

Masana APrimary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 3 In Progress
total cost
Ksh 500,000
estimate
Ksh 384,250

Lnyanza Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Construction
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 500,000
estimate
Ksh 259,830

Chambiti Primary School

location
Wamuluma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 490,000
estimate
Ksh 512,340

Chambaje Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress( 4Classrooms Plastered)
total cost
Ksh 475,000
estimate
Ksh 475,000

Madzugi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase1 Completed
total cost
Ksh 450,000
estimate
Ksh 750,000

Gilwadzi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms & Adm. Block
implementation status
Phase 2 In Progress
total cost
Ksh 450,000
estimate
Ksh 450,000

Vigina Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Administration Block
implementation status
Phase 1 Completed
total cost
Ksh 450,000
estimate
Ksh 250,000

Mwoki Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 2 In Progress
total cost
Ksh 420,000
estimate
Ksh 220,000

Womulalu Primary School

location
C/Maragoli (in Vihiga)
year first funded
2003
action
Renovation
output
Classrooms
implementation status
Re-Roofing & Plaster Done
total cost
Ksh 400,000
estimate
Ksh 400,000

Chandugunyi Primary School

location
S/Maragoii (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 & 2 Completed
total cost
Ksh 400,000
estimate
Ksh 300,000

Buliva Bridge

location
Lugaga (in Vihiga)
year first funded
2005
action
Construction
output
Bridge
implementation status
Backfilling To Be Done
total cost
Ksh 400,000
estimate
Ksh 571,680

Matangulu Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
7 Classrooms Plastered
total cost
Ksh 400,000
estimate
Ksh 940,685

Bukuga Tea Banda

location
Mung'Oma (in Vihiga)
year first funded
2006
action
Renovation
output
Tea Collection Centre
implementation status
complete
total cost
Ksh 350,000
estimate
Ksh 200,000

Chanzeywe Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Construction
output
Administration Block
implementation status
At Windows Level
total cost
Ksh 350,000
estimate
Ksh 763,200

Vigetse Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Construction & Renovation
output
Classrooms
implementation status
Phase 1& 2 Completed
total cost
Ksh 350,000
estimate
Ksh 416,220

Masana-Akanda Bridge

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Construction
output
Bridge
implementation status
Phase 2 In Progress
total cost
Ksh 350,000
estimate
Ksh 350,000

Lyamidi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2003
action
n/a
output
Classrooms
implementation status
Phase J Completed
total cost
Ksh 350,000
estimate
Ksh 250,000

South Maragoli Chiefs Office

location
S/Maragoli (in Vihiga)
year first funded
2006
action
Completion Of Office
output
Office
implementation status
Roofing underway
total cost
Ksh 330,000
estimate
Ksh 180,000

Kisingilu Primary School

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Construction
output
Classrooms
implementation status
Phase I & 2 Completed
total cost
Ksh 300,000
estimate
Ksh 407,226

Enanga Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
2 Classrooms Renovated
total cost
Ksh 300,000
estimate
Ksh 351,000

Ideleri Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
6 Classrooms Renovated
total cost
Ksh 300,000
estimate
Ksh 300,000

Kitumba Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase I Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Kerongo Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Library & Pit Latrine
implementation status
Phase I Completed
total cost
Ksh 300,000
estimate
Ksh 411,721

Chavavo Primary School

location
Mung'Oma (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
5 Classrooms Renovated
total cost
Ksh 300,000
estimate
Ksh 300,000

Ingidi Primary School

location
Lugaga (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 1,369,000

Nyira Tea Banda

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation & Equipping
output
Tables & Plastered Wall
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 100,000

Kigadahi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 250,000
estimate
Ksh 250,000

Lyamagale Primary School

location
MungOma (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 225,000
estimate
Ksh 100,000

Lyanaginga Health Centre

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Construction & Wiring
output
Kitchen & Electrification
implementation status
Phase 2 Completed
total cost
Ksh 200,000
estimate
Ksh 289,750

Musunguti Primary School

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

Ehedwe Bridge

location
Wamuluma (in Vihiga)
year first funded
2005
action
Construction
output
Bridge
implementation status
Work In Progress
total cost
Ksh 160,000
estimate
Ksh 185,645

Mbihi - Makutano Culverts

location
Wamuluma (in Vihiga)
year first funded
2006
action
Purchasing & Installing
output
Culverts
implementation status
not known
total cost
Ksh 115,000
estimate
Ksh 115,000

Bokoyani Health Clinic

location
Lugaga (in Vihiga)
year first funded
2006
action
Construction
output
Clinic
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Chandolo Primary School

location
S/Maragoii (in Vihiga)
year first funded
2004
action
Construction
output
Pit Latrines
implementation status
Phase 1 Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Lusavasavi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2004
action
Renovation
output
Classrooms
implementation status
Phase 1 Completed
total cost
Ksh 100,000
estimate
Ksh 100,000

Gavalagi Primary School

location
S/Maragoli (in Vihiga)
year first funded
2005
action
Buying Of Desks
output
Desks
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 126,150

Wamondo Tea Factory

location
C/Maragoli (in Vihiga)
year first funded
2006
action
Setting Up Nurseries
output
-
implementation status
not known
total cost
Ksh 100,000
estimate
Ksh 600,000

Lusavasavi Tea Banda

location
C/Maragoli (in Vihiga)
year first funded
2006
action
Renovation
output
Tea Collection Centre
implementation status
Phase 1 In Progress
total cost
Ksh 100,000
estimate
Ksh 383,149

Vigetse Tea Banda

location
S/Maragoii (in Vihiga)
year first funded
2004
action
Renovation
output
Tea Collection Centre
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 111,870

Bugami Tea Buying Centre

location
Lugaga (in Vihiga)
year first funded
2006
action
Renovation
output
Tea Collection Centre
implementation status
complete
total cost
Ksh 100,000
estimate
Ksh 100,000

Mahanga Playing Ground

location
Mung'Oma (in Vihiga)
year first funded
2005
action
Fixing Goal Post
output
Goal Posts
implementation status
Completed
total cost
Ksh 50,000
estimate
Ksh 47,140

Chango Tea Banda

location
C/Maragoli (in Vihiga)
year first funded
2006
action
Renovation
output
Tea Collection Centre
implementation status
Co-funded by the Community
total cost
Ksh 50,000
estimate
Ksh 50,000