The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Mang'Ong'O Water Project
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Piping
- output
- Piped Water
- implementation status
- Pipe Laying In Progress
- total cost
- Ksh 3,600,000
- estimate
- Ksh 3,000,000
Chango Secondary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2003
- action
- Construction
- output
- Kitchen, H1Science &
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 2,798,954
- estimate
- Ksh 3,053,192
Vihiga Secondary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Purchase & Re- Roofing
- output
- Generator & New Roof
- implementation status
- Phase 2 Completed
- total cost
- Ksh 2,400,000
- estimate
- Ksh 1,400,000
Gavalagi Secondary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- Phase 1 In Progress
- total cost
- Ksh 2,300,000
- estimate
- Ksh 8,222,305
Madzuu Kisienya Water Project
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Piping
- output
- Piped Water
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 2,300,000
- estimate
- Ksh 8,200,000
Chanda Adc Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2003
- action
- Renovation & Electrification
- output
- Classrooms & Electricity
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 2,200,000
- estimate
- Ksh 1,777,000
Magui Secondary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2003
- action
- Construction
- output
- Laboratory & Classrooms
- implementation status
- Lab Shell Completed
- total cost
- Ksh 2,003,000
- estimate
- Ksh 1,103,000
Vigulu Mahanga Water Project
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Piped Water
- implementation status
- Phase I Completed
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Hambale Youth Polytechnic
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 1,940,000
- estimate
- Ksh 1,046,460
Busamo Ecd
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Storey Building
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,100,000
Mbihi Secondary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2003
- action
- Renovation & Equipping
- output
- Laboratory
- implementation status
- Phase I Completed
- total cost
- Ksh 1,850,000
- estimate
- Ksh 400,000
Idereli Secondary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Equipping
- output
- Laboratory & Library
- implementation status
- Phase I Completed
- total cost
- Ksh 1,850,000
- estimate
- Ksh 320,000
Kerongo Secondary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2003
- action
- Construction & Equipping
- output
- Lab & Admin Block
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,678,064
Kegoye Secondary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2003
- action
- Renovation & Equipping
- output
- Library
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 1,785,000
- estimate
- Ksh 835,000
Madira Secondary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Library Construction
- output
- Library
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 1,400,000
- estimate
- Ksh 2,136,265
Vigina Secondary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2003
- action
- Construction
- output
- Dining Hall
- implementation status
- Phase 2 Completed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 694,510
Ingidi Mkombozi Sec
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2007
- action
- Construction Of Class Rooms
- output
- Classrooms
- implementation status
- On Going
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,500,000
South Maragoli Youth Polytechnic
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,272,267
Masana Secondary School
- location
-
S/Maragol
(in Vihiga)
- year first funded
- 2003
- action
- Construction & Equipping
- output
- Laboratory
- implementation status
- Phase I & 2 Completed
- total cost
- Ksh 1,300,000
- estimate
- Ksh 773,175
Kengendirova Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 1,250,000
- estimate
- Ksh 900,000
Kidundu Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- -
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,216,500
Hambale Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 1,150,000
- estimate
- Ksh 8,735,000
Vumale Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 1,150,000
- estimate
- Ksh 550,000
Keveye Polytechnic
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Dormitory Block
- implementation status
- Phase 1 Completed
- total cost
- Ksh 1,140,000
- estimate
- Ksh 1,491,350
Lodondo Water Project
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Piped Water
- implementation status
- Phase 1 In Progress
- total cost
- Ksh 1,100,000
- estimate
- Ksh 7,400,000
Bugamagi Health Centre
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Health Centre
- implementation status
- Phase 1 & 2 Cmpleted
- total cost
- Ksh 1,090,000
- estimate
- Ksh 690,000
Mbihi Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 1,075,000
- estimate
- Ksh 825,000
Emanda Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 4 Classrooms Renovated
- total cost
- Ksh 1,050,000
- estimate
- Ksh 750,000
Vihiga Health Centre
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Maternity Block
- implementation status
- Phase 1 Completed
- total cost
- Ksh 1,050,000
- estimate
- Ksh 1,200,000
Matsigulu Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Renovation
- output
- Classrooms
- implementation status
- 3 Classrooms Constructed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 551,060
Lduku Health Centre
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2003
- action
- Completion &
- output
- Health Centre
- implementation status
- Phase I & 2 Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Mahanga Security Police Post
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Police Post & Staff Houses
- implementation status
- Phase I Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 965,270
Navuhi Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms & Adm. Block
- implementation status
- Phase 2 Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 484,540
Mukuli Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 588,834
Igakara Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 664,311
Ihyagalo Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2003
- action
- Construction & Renovation
- output
- Classrooms & Admin, Block
- implementation status
- Phase I & 2 Completed
- total cost
- Ksh 925,000
- estimate
- Ksh 500,000
Chavavo Secondary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Library
- implementation status
- Shell Completed
- total cost
- Ksh 925,000
- estimate
- Ksh 700,000
Induyani Bridge
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Bridge
- implementation status
- Phase I In Progress
- total cost
- Ksh 908,000
- estimate
- Ksh 1,157,805
Mudavadi Girls Secondary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Equipping
- output
- Laboratory
- implementation status
- Phase I Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 545,000
Womulalu Secondary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- Finishings yet to be done
- total cost
- Ksh 900,000
- estimate
- Ksh 1,500,000
Chango Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation & Construction
- output
- Classrooms & Pit Latrines
- implementation status
- Phase 2 Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 460,280
Kitulu Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 900,000
- estimate
- Ksh 400,000
Visiru Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 700,000
Magui Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Administration Block
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 850,000
- estimate
- Ksh 1,094,528
Ikumba Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 3 Classrooms Renovated
- total cost
- Ksh 850,000
- estimate
- Ksh 600,000
Chavugami Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 600,000
Muhanda Tea Banda
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Collection Centre Office
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 732,828
Bunandi Tea Buying Centre
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Tea Collection Centre
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 820,850
Lnavi Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 800,000
- estimate
- Ksh 300,000
Gilwadzi Secondary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2003
- action
- Construction
- output
- Dining Hall
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Enzaro Health Centre
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation Of Solar System
- output
- Solar Power Supply
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 750,000
- estimate
- Ksh 250,000
Lugaga A, P, Line
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Police Station
- implementation status
- complete
- total cost
- Ksh 750,000
- estimate
- Ksh 0
Mahanga Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2003
- action
- Construction & Renovation
- output
- Classrooms
- implementation status
- 2 Classrooms Constructed
- total cost
- Ksh 750,000
- estimate
- Ksh 400,000
Kisienya Tea Buying Centre
- location
-
MungOma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation & Construction
- output
- Tea Collection Centre
- implementation status
- Phase 1 Completed
- total cost
- Ksh 750,000
- estimate
- Ksh 400,000
Madzu Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 5 Classrooms Renovated
- total cost
- Ksh 725,000
- estimate
- Ksh 500,000
St. Clare's Maragoli
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2006
- action
- Construction
- output
- Classrooms
- implementation status
- Work In Progress
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Chanzuvu Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2003
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Kedohi Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 1,014,910
Muhanda Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- 4 Classroms Renovated
- total cost
- Ksh 650,000
- estimate
- Ksh 2,120,181
Idavaga Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 650,000
- estimate
- Ksh 653,580
Kegoye Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Madira Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- 4 Classroms Renovated
- total cost
- Ksh 650,000
- estimate
- Ksh 350,000
Embaga Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Kisienya Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2003
- action
- Renovation
- output
- Classrooms
- implementation status
- 4 Classrooms Renovated
- total cost
- Ksh 600,000
- estimate
- Ksh 500,000
Central Maragoli Chiefs Office
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Construction
- output
- Office
- implementation status
- Finishings yet to be done
- total cost
- Ksh 600,000
- estimate
- Ksh 300,000
Vihiga Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 600,000
- estimate
- Ksh 811,987
Buhani Bridge Project
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Bridge
- implementation status
- Phase 2 Completed
- total cost
- Ksh 575,000
- estimate
- Ksh 575,000
Logere Bridge
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Bridge
- implementation status
- Phase I &2 Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 616,000
Lduku Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase I & 2 Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 350,000
Hamasana Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 550,000
- estimate
- Ksh 740,000
Vunandi Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 348,390
Masana APrimary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 3 In Progress
- total cost
- Ksh 500,000
- estimate
- Ksh 384,250
Lnyanza Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 259,830
Chambiti Primary School
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 490,000
- estimate
- Ksh 512,340
Chambaje Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress( 4Classrooms Plastered)
- total cost
- Ksh 475,000
- estimate
- Ksh 475,000
Madzugi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase1 Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 750,000
Gilwadzi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms & Adm. Block
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Vigina Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Administration Block
- implementation status
- Phase 1 Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 250,000
Mwoki Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 420,000
- estimate
- Ksh 220,000
Womulalu Primary School
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2003
- action
- Renovation
- output
- Classrooms
- implementation status
- Re-Roofing & Plaster Done
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Chandugunyi Primary School
- location
-
S/Maragoii
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 & 2 Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Buliva Bridge
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Bridge
- implementation status
- Backfilling To Be Done
- total cost
- Ksh 400,000
- estimate
- Ksh 571,680
Matangulu Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- 7 Classrooms Plastered
- total cost
- Ksh 400,000
- estimate
- Ksh 940,685
Bukuga Tea Banda
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2006
- action
- Renovation
- output
- Tea Collection Centre
- implementation status
- complete
- total cost
- Ksh 350,000
- estimate
- Ksh 200,000
Chanzeywe Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Administration Block
- implementation status
- At Windows Level
- total cost
- Ksh 350,000
- estimate
- Ksh 763,200
Vigetse Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction & Renovation
- output
- Classrooms
- implementation status
- Phase 1& 2 Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 416,220
Masana-Akanda Bridge
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Bridge
- implementation status
- Phase 2 In Progress
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Lyamidi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2003
- action
- n/a
- output
- Classrooms
- implementation status
- Phase J Completed
- total cost
- Ksh 350,000
- estimate
- Ksh 250,000
South Maragoli Chiefs Office
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Completion Of Office
- output
- Office
- implementation status
- Roofing underway
- total cost
- Ksh 330,000
- estimate
- Ksh 180,000
Kisingilu Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Classrooms
- implementation status
- Phase I & 2 Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 407,226
Enanga Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 2 Classrooms Renovated
- total cost
- Ksh 300,000
- estimate
- Ksh 351,000
Ideleri Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 6 Classrooms Renovated
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kitumba Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase I Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kerongo Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Library & Pit Latrine
- implementation status
- Phase I Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 411,721
Chavavo Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- 5 Classrooms Renovated
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Ingidi Primary School
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,369,000
Nyira Tea Banda
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation & Equipping
- output
- Tables & Plastered Wall
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 100,000
Kigadahi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Lyamagale Primary School
- location
-
MungOma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 225,000
- estimate
- Ksh 100,000
Lyanaginga Health Centre
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Construction & Wiring
- output
- Kitchen & Electrification
- implementation status
- Phase 2 Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 289,750
Musunguti Primary School
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ehedwe Bridge
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2005
- action
- Construction
- output
- Bridge
- implementation status
- Work In Progress
- total cost
- Ksh 160,000
- estimate
- Ksh 185,645
Mbihi - Makutano Culverts
- location
-
Wamuluma
(in Vihiga)
- year first funded
- 2006
- action
- Purchasing & Installing
- output
- Culverts
- implementation status
- not known
- total cost
- Ksh 115,000
- estimate
- Ksh 115,000
Bokoyani Health Clinic
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2006
- action
- Construction
- output
- Clinic
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Chandolo Primary School
- location
-
S/Maragoii
(in Vihiga)
- year first funded
- 2004
- action
- Construction
- output
- Pit Latrines
- implementation status
- Phase 1 Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Lusavasavi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gavalagi Primary School
- location
-
S/Maragoli
(in Vihiga)
- year first funded
- 2005
- action
- Buying Of Desks
- output
- Desks
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 126,150
Wamondo Tea Factory
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Setting Up Nurseries
- output
- -
- implementation status
- not known
- total cost
- Ksh 100,000
- estimate
- Ksh 600,000
Lusavasavi Tea Banda
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Renovation
- output
- Tea Collection Centre
- implementation status
- Phase 1 In Progress
- total cost
- Ksh 100,000
- estimate
- Ksh 383,149
Vigetse Tea Banda
- location
-
S/Maragoii
(in Vihiga)
- year first funded
- 2004
- action
- Renovation
- output
- Tea Collection Centre
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 111,870
Bugami Tea Buying Centre
- location
-
Lugaga
(in Vihiga)
- year first funded
- 2006
- action
- Renovation
- output
- Tea Collection Centre
- implementation status
- complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mahanga Playing Ground
- location
-
Mung'Oma
(in Vihiga)
- year first funded
- 2005
- action
- Fixing Goal Post
- output
- Goal Posts
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 47,140
Chango Tea Banda
- location
-
C/Maragoli
(in Vihiga)
- year first funded
- 2006
- action
- Renovation
- output
- Tea Collection Centre
- implementation status
- Co-funded by the Community
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000