The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Projects in Voi
Marungu Secondary School
- location
-
Marungu
(in Voi)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms, Admin Block And Toilets
- output
- Improved Facilities
- implementation status
- 2 Classrooms Completed
- total cost
- Ksh 6,700,000
- estimate
- Ksh 8,200,000
Irima Water Project
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Construction Of Pipeline From Mzima Mains
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 6,500,000
- estimate
- Ksh 28,000,000
Ndovu Dispensary
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Construction Of Health Facility
- output
- Improved Services
- implementation status
- Done
- total cost
- Ksh 6,500,000
- estimate
- Ksh 4,500,000
Mbogholinyi Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Construction Of Silt Tank And Pipe Laying
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 5,200,000
- estimate
- Ksh 10,625,523
Talio Chini Borehole
- location
-
Sagalla
(in Voi)
- year first funded
- 2009
- action
- Drilling Of Borehole And Distribution
- output
- -
- implementation status
- On Going
- total cost
- Ksh 4,500,000
- estimate
- Ksh 0
Buguta West Borehole
- location
-
Kasigau
(in Voi)
- year first funded
- 2008
- action
- Drilling Of Borehole And Distribution
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 4,400,000
- estimate
- Ksh 0
David Kayanda Secondary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Construction Of Admin Block
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 4,354,000
- estimate
- Ksh 3,458,507
Mwakitawa Secondary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Construction Of Milti Purpose Hall
- output
- Improved Facilities
- implementation status
- 90% Complete
- total cost
- Ksh 4,300,000
- estimate
- Ksh 4,942,224
Coast Institute Of Technology
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction And Completion Of Admin Block
- output
- Improved Facilities
- implementation status
- Project 95% Complete
- total cost
- Ksh 4,250,000
- estimate
- Ksh 5,055,000
Ikanga/Kirutai Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2008
- action
- Drilling Of Borehole And Distribution
- output
- Improved Facilities
- implementation status
- not known
- total cost
- Ksh 3,930,000
- estimate
- Ksh 3,930,000
Kayanda Dispensary
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Construction Of Dispensary
- output
- Improved Health Services
- implementation status
- Completed
- total cost
- Ksh 3,775,000
- estimate
- Ksh 2,500,000
Mbulia Borehole
- location
-
Ngolia
(in Voi)
- year first funded
- 2008
- action
- Drilling Of Borehole And Distribution
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 3,600,000
- estimate
- Ksh 0
Buguta East Borehole
- location
-
Kasigau
(in Voi)
- year first funded
- 2008
- action
- Drilling Of Borehole And Distribution
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 3,600,000
- estimate
- Ksh 0
Mbulia Dispensary
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Construction Of Dispensary
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 3,600,000
- estimate
- Ksh 2,272,890
Kasigau Health Centre
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Constrcution Of Staff House And Generator
- output
- Improved Services
- implementation status
- On Going
- total cost
- Ksh 3,400,000
- estimate
- Ksh 1,900,000
Ingire Jora Community Water Project
- location
-
Kasigau
(in Voi)
- year first funded
- 2007
- action
- Drilling Of Borehole And Distribution
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 3,400,000
- estimate
- Ksh 0
Tausa Health Centre
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Construction Of Wards, Laundry And Kitchen.2009/2010 Funds For Electrification.
- output
- Improved Health Services
- implementation status
- Completed
- total cost
- Ksh 3,330,000
- estimate
- Ksh 3,500,000
Mwaghogho Secondary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Construction Of Computer Lab And Admin Block
- output
- Improved Facilities
- implementation status
- Computer Lab Completed. Admin Block Is 90% Complete
- total cost
- Ksh 3,317,000
- estimate
- Ksh 3,054,037
Moi Secondary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom Block,Rehabilitation Of Dormitory And School Bus
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 3,200,000
- estimate
- Ksh 5,060,470
Mwangea Secondary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms/Laboratories
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 1,306,842
Kajire Secondary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Construction Of Dormitory
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 3,000,000
- estimate
- Ksh 4,987,080
Olops Secondary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Construction Of Dormitory
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 2,800,000
- estimate
- Ksh 6,100,000
Settlements Schooleme
- location
-
Voi
(in Voi)
- year first funded
- 2009
- action
- Survey Work And Preparation Of Title Deeds
- output
- -
- implementation status
- New
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Maungu Health Centre
- location
-
Marungu
(in Voi)
- year first funded
- 2009
- action
- Construction Of Outpatient Department
- output
- Improved Access To Health Services
- implementation status
- On Going
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
Kimwa Water Project
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Purchase Of Pipes And Connection
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 2,300,000
- estimate
- Ksh 1,200,000
Mwambiti Secondary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Construction Of Laboratory And Water Pump
- output
- Improved Facilities
- implementation status
- Water Pump Fixed And In Use
- total cost
- Ksh 2,116,000
- estimate
- Ksh 1,552,801
Mraru Secondary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2009
- action
- Construction Of Two Classrooms And Administration Block
- output
- Improved Facilities
- implementation status
- New
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Tlaio Chini Secondaru School
- location
-
Sagalla
(in Voi)
- year first funded
- 2009
- action
- Construction Of Two Classrooms And Administration Block
- output
- -
- implementation status
- New
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Kizumanzi Secendary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Construction Of 4 Classrooms, Admin Block And Toilets
- output
- Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 4,000,000
Makwasinyi Secondary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2009
- action
- Construction Of Two Classrooms And Administration Block
- output
- -
- implementation status
- New
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Marungu/Buguta Water Project
- location
-
Marungu
(in Voi)
- year first funded
- 2005
- action
- Survey Works
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 1,926,000
- estimate
- Ksh 4,200,000
Kajire Dispensary
- location
-
Sagalla
(in Voi)
- year first funded
- 2007
- action
- Expansion Of Health Facility
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,500,000
Mwalui/Mbengeronyi Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Distribution Of Piped Water To The Community
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 200,000
Mwakiki Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Supply Of Clean Piped Water To The Community
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,800,000
- estimate
- Ksh 3,916,365
Loghola Water Project
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- -
- total cost
- Ksh 1,800,000
- estimate
- Ksh 2,000,000
Buguta/Makwasinyi Water Project
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction of Storage Tank
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,800,000
- estimate
- Ksh 600,000
Voi Secondary School
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Construction Of Staff House
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,918,000
Tausa Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Supply Water To Tausa Health Centre And Its Environs
- output
- Meet Water Demand
- implementation status
- Completed
- total cost
- Ksh 1,650,000
- estimate
- Ksh 2,600,000
Ghazi Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of 2 Storage Watre Tanks
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 872,000
Manyani Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Dormitory
- output
- Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 1,600,000
- estimate
- Ksh 500,000
Miasenyi Dispensary
- location
-
Marungu
(in Voi)
- year first funded
- 2004
- action
- Construction Of Dispensary And Staff Houses
- output
- Improved Facilities
- implementation status
- Dispensary Block Completed
- total cost
- Ksh 1,550,000
- estimate
- Ksh 2,189,795
Bungule Dispensary
- location
-
Kasigau
(in Voi)
- year first funded
- 2007
- action
- Construction Of Dispensary
- output
- Improved Facilities
- implementation status
- Not Done
- total cost
- Ksh 1,500,000
- estimate
- Ksh 2,000,000
Kasigau Dam
- location
-
Kasigau
(in Voi)
- year first funded
- 2008
- action
- Construction Of Water Pan
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Mwarovo Water Tank
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Provision Of Water Tank
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,480,000
- estimate
- Ksh 800,000
Buguta Borehole
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Sinking Of Borehole
- output
- Improved Water Supply
- implementation status
- Stalled
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,000,000
Sagalla Health Centre
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Construction Of 2 Staff Houses
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,362,750
- estimate
- Ksh 2,400,000
Marapu Water Project
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Construction Of Pump House, Replacement Of Pump And Repair Of Generator
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,331,000
- estimate
- Ksh 900,000
Ndome Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Distribution Of Piped Water To The Community
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,500,000
Makwasinyi Dispensary
- location
-
Kasigau
(in Voi)
- year first funded
- 2003
- action
- Construction Of A Dispensary
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 1,260,000
- estimate
- Ksh 700,000
Kiteghe Water Project
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Survey Work And Piping
- output
- Improved Water Supply
- implementation status
- Survey Work Completed
- total cost
- Ksh 1,214,000
- estimate
- Ksh 214,000
Mwanyambo Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of Toilets And Desks
- output
- Improved Facilities
- implementation status
- Toilets Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 600,000
Zungulukani Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 1,150,000
- estimate
- Ksh 148,900
Miasenyi Primary School
- location
-
Marungu
(in Voi)
- year first funded
- 2003
- action
- Renovvation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,145,000
- estimate
- Ksh 883,730
Ikanga Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Construction Of Toilets And Renovations Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,000,000
Sasenyi Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2004
- action
- Construction Of Toilets And Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,050,000
- estimate
- Ksh 300,000
Tausa Welfare Community Dias
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Construction Of Dias
- output
- To Improve Religious Activities
- implementation status
- Completed
- total cost
- Ksh 1,040,945
- estimate
- Ksh 500,000
Manyani Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2006
- action
- Distribution Of Piped Water To The Community
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Allan Mjomba Secondary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Installation Of Solar
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Matolonyi/Tolome Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- in use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Buguta Secondary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2007
- action
- Construction Of Classrooms
- output
- Improved Facilities
- implementation status
- Not Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,000,000
Buguta Dispensary
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of Taff Houses
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Mshiri Dam
- location
-
Kasigau
(in Voi)
- year first funded
- 2009
- action
- Rehabilitation Of Dam
- output
- -
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Mwakichuchu Secondary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Construction Of Laboratory And Library
- output
- Improved Facilities
- implementation status
- Stalled
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,740,000
Mkwachunyi Multi Purpose Hall
- location
-
Mbololo
(in Voi)
- year first funded
- 2007
- action
- Construction Of Milti Purpose Hall
- output
- Improved Facilities
- implementation status
- Not Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,500,000
Kiriwenyi Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Distribution Of Piped Water To The Community
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 2,261,625
Ndile Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 800,000
Marungu Primary School
- location
-
Marungu
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classrromm And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Classroom Block Constructed To Lentel
- total cost
- Ksh 950,000
- estimate
- Ksh 300,000
Kisimenyi Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of Admin Block And Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 950,000
- estimate
- Ksh 660,998
Kalambe Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Constructed One Classroom To Completetion
- output
- Improved Facilities
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 400,000
Tausa Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Construction Of Two Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 1,000,000
Gimba Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 820,000
- estimate
- Ksh 400,000
Boniface Mganga Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 810,000
- estimate
- Ksh 1,100,000
Kirongwe Water Project
- location
-
Kasigau
(in Voi)
- year first funded
- 2007
- action
- Construction Of Intake, Tanks And Piping
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Mashigati Water Project
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Supply Wkln 40/4 Phase 1
- output
- Improved Water Supply
- implementation status
- Stalled
- total cost
- Ksh 800,000
- estimate
- Ksh 1,000,000
Talio Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Admin Block
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 745,000
- estimate
- Ksh 1,400,000
Sasenyi /Magwede Borehole
- location
-
Kasigau
(in Voi)
- year first funded
- 2008
- action
- Rehabilitation Of Borehole
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Sagalla Youth Polytechnic
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Construction Of Workshop And Equipments
- output
- Improved Facilities
- implementation status
- Workshop Not Done
- total cost
- Ksh 700,000
- estimate
- Ksh 900,000
Mraru Youth Polytechnic
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Construction Of Workshop, Renovations And Equipments
- output
- Improved Training Facilities
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 935,235
Ghazi Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 560,895
Ghazi Youth Polytechnic
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classroom And Purchase Of Equipments
- output
- Improved Facilities
- implementation status
- Classroom Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 841,610
Bungule Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of Kitche And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Kitchen Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 2,806,000
Rukanga Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of Modern Jiko, Class And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Jiko And Desks Completed
- total cost
- Ksh 560,000
- estimate
- Ksh 600,000
Mkamenyi Primar School
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of 2 Classrooms
- output
- Improved Facilities
- implementation status
- One Class Complete
- total cost
- Ksh 550,000
- estimate
- Ksh 617,860
Mwakajo Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Ecd Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 550,000
- estimate
- Ksh 825,668
G Sowa Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 545,000
- estimate
- Ksh 550,000
Mwambiti Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 545,000
- estimate
- Ksh 550,000
Kishoenyi/Mwalui Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- -
- total cost
- Ksh 540,000
- estimate
- Ksh 812,000
Kaloleni Water Project
- location
-
Voi
(in Voi)
- year first funded
- 2007
- action
- Piping And Construction Of Reservoir Tank
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Zongwani Water Pan
- location
-
Sagalla
(in Voi)
- year first funded
- 2009
- action
- Construction Of Water Pan
- output
- -
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Salaita Water Pan
- location
-
Ngolia
(in Voi)
- year first funded
- 2009
- action
- Construction Of Water Pan
- output
- -
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ndome Dispensary
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Construction Of Fence
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Kambito Water Pan
- location
-
Mbololo
(in Voi)
- year first funded
- 2009
- action
- Construction Of Water Pan
- output
- Improved Water Supply
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Ngambenyi Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2009
- action
- Construction Of One Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kipipiri Borehole
- location
-
Marungu
(in Voi)
- year first funded
- 2005
- action
- Installation Of Generator
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Mabomani Water Project
- location
-
Voi
(in Voi)
- year first funded
- 2009
- action
- Construction Of Water Tank
- output
- Improved Water Supply
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Mlondo Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 480,000
- estimate
- Ksh 200,000
Marie Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Marasi Primary School
- location
-
Marungu
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classrromm And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Classroom Not Done
- total cost
- Ksh 450,000
- estimate
- Ksh 190,000
Kale Primary School
- location
-
Marungu
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 445,000
- estimate
- Ksh 200,000
G Mosi Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 430,000
- estimate
- Ksh 682,700
Marungu Dispensary
- location
-
Marungu
(in Voi)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Not Done
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Itinyi Primary School
- location
-
Marungu
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- -
- total cost
- Ksh 400,000
- estimate
- Ksh 300,000
Ndome Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classrooms And Construction Of Water Tank
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 395,000
- estimate
- Ksh 350,000
Kirumbi Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 370,000
- estimate
- Ksh 200,000
Buguta Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 360,000
- estimate
- Ksh 670,820
Ore Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Construction Of 4 Classrooms, Admin Block
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 330,000
- estimate
- Ksh 600,000
Ghazi Fda Water Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Rehabilitation Of Dips
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Tausa Youth Polytechnic
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Purchase Of Equipments For Practical Training
- output
- Improved Training Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Kirutai Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 485,050
Mwambirwa Dispensary
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Dispensary
- output
- Improved Health Services
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 1,200,000
Mwakoma Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2009
- action
- Construction Of One Classroom
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Sagalla Community Welfare
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Social Hall
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 250,000
Makwasinyi Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classroom And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 510,844
Brick Making Machine
- location
-
Voi
(in Voi)
- year first funded
- 2009
- action
- Purchase Of Brick Making Machine
- output
- -
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Kalela Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Renovation Of 2 Classrooms
- output
- Improved Facilities
- implementation status
- -
- total cost
- Ksh 300,000
- estimate
- Ksh 205,800
Mwamunga Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of 2 Classrooms And Desks
- output
- Improved Facilities
- implementation status
- One Class Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 621,438
Voi Youth Polytechnic
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Construction of Boys Hostel
- output
- Improved Facilities
- implementation status
- -
- total cost
- Ksh 300,000
- estimate
- Ksh 4,691,828
Mole Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 669,097
Mrangi Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 854,400
Wongonyi Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2004
- action
- Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 228,000
Buguta Aps Post
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of Aps Post
- output
- Improved Security Services
- implementation status
- Completed
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Ghazi Dispensary
- location
-
Ngolia
(in Voi)
- year first funded
- 2006
- action
- Renovation Of Office Block
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 240,000
- estimate
- Ksh 500,000
Mwakuni Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 232,000
- estimate
- Ksh 425,440
Kajire Pimarry School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom And Office
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 230,000
- estimate
- Ksh 100,000
Kizumanzi Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 220,000
- estimate
- Ksh 200,000
Sagalla Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 220,000
- estimate
- Ksh 600,000
Mlangonyi Community Project
- location
-
Ngolia
(in Voi)
- year first funded
- 2006
- action
- Renovation Of Ngolia Chief'S Office
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Voi Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of Toilets And Desks
- output
- Improved Facilities
- implementation status
- Partially Done
- total cost
- Ksh 200,000
- estimate
- Ksh 1,284,783
Mwakingali Primary School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 824,400
Upper Kariakor Water Project
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Piped Water Distribution
- output
- Improved Water Supply
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 450,000
Kie Workshop
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Construction Of Workshop
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Bungule Youth Polytechnic
- location
-
Kasigau
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Workshops
- output
- -
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Kiteghe Pimary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2005
- action
- Construction Of Modern Jiko And Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 466,215
Jora Primary School
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Renovation Of 3 Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 400,000
Mwambiti Prolytechnic
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Construction Of Workshop
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 800,000
Kajire Water Pump House
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Construction Of Pump House
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Wray Primary School
- location
-
Sagalla
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Kambito Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Kirindinyi Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Provision Of Desks And Tables
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 221,000
Llangenyi Cattle Dip
- location
-
Mbololo
(in Voi)
- year first funded
- 2007
- action
- Construction Of Cattle Dip
- output
- Improved Services
- implementation status
- Not Done
- total cost
- Ksh 200,000
- estimate
- Ksh 300,000
Mkwachunyi Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwakiki Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mwambolembole Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Completion Of 2 Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 407,390
Tausa Do's House
- location
-
Mbololo
(in Voi)
- year first funded
- 2006
- action
- Construction Of Soak Pit And Septic Tanks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 241,000
Mlundinyi Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2006
- action
- Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Mbulia Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 180,000
- estimate
- Ksh 400,000
Makutano Cattle Dip
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 180,000
- estimate
- Ksh 200,000
Sagalla Community Centre
- location
-
Sagalla
(in Voi)
- year first funded
- 2004
- action
- Construction Of Pit Latrines, Bathrooms And Provision Of Water
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 166,000
- estimate
- Ksh 30,000
Mlegwa Cattle Dip
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Renovation Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 160,000
- estimate
- Ksh 599,980
Mbololo Chief's Office
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Chief'S Office
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 155,000
- estimate
- Ksh 155,000
Tausa Nursery School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 260,000
Mkwachunyi Cattle Dip
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Renovation Of The Dip
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Ndii Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 400,000
Mwangea AsSt. Chief's Office
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Construction Of Office
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kalela Nursery School
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 287,916
Mnaoni Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 300,000
Majengo Pre-School
- location
-
Marungu
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 200,000
Voi Chief's Office
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Renovation Of Buildings
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Marungu Social Hall
- location
-
Marungu
(in Voi)
- year first funded
- 2006
- action
- n/a
- output
- -
- implementation status
- -
- total cost
- Ksh 120,000
- estimate
- Ksh 120,000
Mwakingali Welfare Water Project
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Piped Water Distribution
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 110,000
- estimate
- Ksh 360,000
Youth Football Clubs
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Purchase Of Footballs
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Miasenyi Cattle Dip
- location
-
Marungu
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kasarani Pre-School
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Mwambani Pre-School
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Ngambenyi Pre-School
- location
-
Kasigau
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Kiruru Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 160,000
Ikagora Water Project
- location
-
Mbololo
(in Voi)
- year first funded
- 2006
- action
- Replacement Of Pipes
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Wongonyi Cattle Dip
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mbulia Cattle Dip
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Ndome Cattle Dip
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Cattle Dip
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 200,000
Mchanga Pre-School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 50,000
Maweni Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Construction Of Latrine
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 154,930
Sikujua Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Kalembe Nursery School
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 241,000
Mwakingali Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 150,000
Ndii Pre-School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 99,375
- estimate
- Ksh 200,000
Kwa Mvura Rock Catchment
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Distribution Tank
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 90,000
- estimate
- Ksh 200,000
Majengo Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 60,000
- estimate
- Ksh 100,000
Mlundinyi Pre-School
- location
-
Ngolia
(in Voi)
- year first funded
- 2005
- action
- Purchase Of Desks
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
G Mosi Pre-School
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mchanga Nursery School
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 110,000
Gora Primary School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 196,580
Mkwachuni Pre-School
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 120,270
Kirindinyi Nursery School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- n/a
- output
- -
- implementation status
- not known
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Mwambolembole Pre-School
- location
-
Mbololo
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 294,415
Makiboro Water Project
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Provide Piped Water
- output
- Improved Water Supply
- implementation status
- Done
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Mlekenyi S Schooleme
- location
-
Voi
(in Voi)
- year first funded
- 2006
- action
- Installation Of Water Tank
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Sofia Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Mabomani Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Standrews Pre-School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Stbartholomew Nursery School
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- Renovation Of Classrooms
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Birikani Nursery School
- location
-
Voi
(in Voi)
- year first funded
- 2005
- action
- Renovation Of Classrooms And Construction Of Pit Latrine
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 150,000
Itinyi Pre-School
- location
-
Marungu
(in Voi)
- year first funded
- 2004
- action
- Construction Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000
Imani Women Group
- location
-
Marungu
(in Voi)
- year first funded
- 2005
- action
- Goat Rearing
- output
- Improved Farming
- implementation status
- Completed
- total cost
- Ksh 35,000
- estimate
- Ksh 35,000
Kunda Rock Catchment
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Cost Sharing Contribution To Ttap
- output
- Completion Of Catchment Distribution Of Water To The Community
- implementation status
- Completed
- total cost
- Ksh 35,000
- estimate
- Ksh 296,719
Mwachoki Pre-School
- location
-
Sagalla
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Done
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Mlilo Primary School
- location
-
Ngolia
(in Voi)
- year first funded
- 2003
- action
- Renovation Of Classroom
- output
- Improved Facilities
- implementation status
- Completed
- total cost
- Ksh 30,000
- estimate
- Ksh 100,000
Me-Mwasigwa Rock Catchment
- location
-
Mbololo
(in Voi)
- year first funded
- 2003
- action
- Tapping Water
- output
- Meet Water Demand
- implementation status
- Cost Sharing Contribution From Cdf
- total cost
- Ksh 28,194
- estimate
- Ksh 526,249
Lata Dam
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Construction Of Dam
- output
- Improved Water Supply
- implementation status
- Completed
- total cost
- Ksh 24,000
- estimate
- Ksh 150,000
Zongwani Dispensary
- location
-
Sagalla
(in Voi)
- year first funded
- 2006
- action
- Provision Of Equipments
- output
- Improved Services
- implementation status
- Done
- total cost
- Ksh 21,000
- estimate
- Ksh 150,000
Mwakilacha Women Group
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Goat Rearing
- output
- Improved Milk Supply
- implementation status
- Completed
- total cost
- Ksh 20,000
- estimate
- Ksh 35,000
Mzinyi Youth Group
- location
-
Mbololo
(in Voi)
- year first funded
- 2004
- action
- Purchase Of Farm Inputs
- output
- Improved Farming Methods
- implementation status
- Completed
- total cost
- Ksh 20,000
- estimate
- Ksh 479,600
Jua Kali Women Group
- location
-
Voi
(in Voi)
- year first funded
- 2004
- action
- n/a
- output
- -
- implementation status
- -
- total cost
- Ksh 12,000
- estimate
- Ksh 12,000
Kirutai Power Supply
- location
-
Mbololo
(in Voi)
- action
- Supply Of Electricity To Kirutai
- output
- -
- implementation status
- New
- total cost
- Ksh 0
- estimate
- Ksh 0
Nyangala Community Welfare
- location
-
Kasigau
(in Voi)
- action
- Renovation Of Do'S Offices
- output
- Improved Services
- implementation status
- Completed
- total cost
- Ksh 0
- estimate
- Ksh 1,500,000