The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Fencing & Equin Youth Center
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2007
- action
- Fencing &Equips
- output
- Improve youth dev
- implementation status
- Complete
- total cost
- Ksh 2,980,000
- estimate
- Ksh 2,980,000
Construction of a dam at Sarman
- location
-
Sarman
(in Wajir East)
- year first funded
- 2006
- action
- Construction of a dam
- output
- Mutigate water Shortage
- implementation status
- Complete
- total cost
- Ksh 2,400,000
- estimate
- Ksh 2,400,000
Sabunley secondary school
- location
-
jugbaro
(in Wajir East)
- year first funded
- 2005
- action
- Construction of a library
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 2,200,000
- estimate
- Ksh 2,200,000
Wagberi boys secondary
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2006
- action
- Construction of a library
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 2,050,000
- estimate
- Ksh 2,050,000
Construction of A dispensary at Duntow
- location
-
Duntow
(in Wajir East)
- year first funded
- 2007
- action
- Const. of A dispensary
- output
- Improve Access to H/care
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
duntow primary
- location
-
duntow
(in Wajir East)
- year first funded
- 2006
- action
- Const. of dining Hall
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 1,900,000
- estimate
- Ksh 1,900,000
construction of a maternity wing at wajir bor
- location
-
wajirbor
(in Wajir East)
- year first funded
- 2009
- action
- construction of maternity
- output
- improve acess to heatlh
- implementation status
- complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Construction & Equiping of a dispensary at wagberi
- location
-
wagberi
(in Wajir East)
- year first funded
- 2004
- action
- Construction of a Disp.
- output
- Increase Access to H/care
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,500,000
Construction &Equiping of a dispensary at Dasheeg
- location
-
Dasheeg
(in Wajir East)
- year first funded
- 2005
- action
- Constructionof a dispensary
- output
- Improve Access to H/care
- implementation status
- Complete
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,750,000
Construction of dispensary at a Lafaley Location
- location
-
Lafaley
(in Wajir East)
- year first funded
- 2004
- action
- Construction of a Disp.
- output
- Increase Access to H/care
- implementation status
- Complete
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,650,000
Fencing of Bakalo &Kutulo group farm
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2007
- action
- Fencing shamba
- output
- Improve Agri. Prod.
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Construction of dispensary at a Elben
- location
-
Elben
(in Wajir East)
- year first funded
- 2004
- action
- Construction of a Disp.
- output
- Increase Access to H/care
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,600,000
Wajir Girls secondary
- location
-
Jubaru
(in Wajir East)
- year first funded
- 2004
- action
- Construction of shaft hse
- output
- Provide belt garments to teachers
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Wajir bor primary school
- location
-
Wajir bor
(in Wajir East)
- year first funded
- 2006
- action
- Const. of Admitory
- output
- Supply of desks
- implementation status
- Complete
- total cost
- Ksh 1,400,000
- estimate
- Ksh 1,400,000
Riba primary school
- location
-
Riba
(in Wajir East)
- year first funded
- 2007
- action
- Const. of Staff host*
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Construction of Maternity wing at Tarbaj
- location
-
Tarbaj
(in Wajir East)
- year first funded
- 2008
- action
- Const. of Maternity wing
- output
- Reduce child *
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Hodhan Primary school
- location
-
Hodhan
(in Wajir East)
- year first funded
- 2008
- action
- Fencing of Pri. school
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
construction of staff quarter at tarbaj health centre
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2009
- action
- construction of staff quarter
- output
- improve acess to health
- implementation status
- complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Downtown primary
- location
-
dunto
(in Wajir East)
- year first funded
- 2004
- action
- Construction of a dormitory
- output
- Increase Involvement
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,206,000
Wajir Equip. Polytechnic
- location
-
Wajir
(in Wajir East)
- year first funded
- 2004
- action
- Supply of Equipments
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 1,190,000
- estimate
- Ksh 1,190,000
Construction of 7 pitlatrins at Riba
- location
-
Riba
(in Wajir East)
- year first funded
- 2007
- action
- Improve sanitation
- output
- Improve sanitation
- implementation status
- Complete
- total cost
- Ksh 1,167,880
- estimate
- Ksh 1,167,880
Dunto Primary school
- location
-
wagberi
(in Wajir East)
- year first funded
- 2004
- action
- Construction of 5 septic tanks
- output
- Improve sanitation
- implementation status
- Complete
- total cost
- Ksh 1,140,000
- estimate
- Ksh 1,140,000
Tarbaj primary school
- location
-
Tarbaj
(in Wajir East)
- year first funded
- 2008
- action
- Const. of Staff host*
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,100,000
Dasheeg primary
- location
-
Dasheeg
(in Wajir East)
- year first funded
- 2004
- action
- Construction of 3 classrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 1,028,657
- estimate
- Ksh 1,028,657
Construction of maternity wing of Wajir Bor
- location
-
Wajir Bor
(in Wajir East)
- year first funded
- 2008
- action
- Const. of maternity wing
- output
- Improve Health Care
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
wajir high school
- location
-
hodhan
(in Wajir East)
- year first funded
- 2008
- action
- Purchase of school
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,100,000
Constr. & Equiping of youth friendly centre.
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2006
- action
- Constr. &Equiping of Youth Centre
- output
- Improve youth development
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
construction of a dispensaryenasry at tarbaj
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2008
- action
- construction of a dispenasry
- output
- improve acess to health
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Riba primary
- location
-
Riba
(in Wajir East)
- year first funded
- 2004
- action
- Construction of an Adm. Block
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Purchase of Generator for Dambas Location
- location
-
Dambas
(in Wajir East)
- year first funded
- 2004
- action
- purchase of gen. set
- output
- mutigate water shortage
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Wagberi boys
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2006
- action
- Construction of 2 classrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 950,000
- estimate
- Ksh 950,000
renovations of 3 dispensaryensaries in 3 lotions
- location
-
wajir bor,elben,alimaow
(in Wajir East)
- year first funded
- 2008
- action
- renovations of 3 dispensaries
- output
- improve acess to health
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Wagberi boys sec
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2006
- action
- Constructionof 6 vultlatrines
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Wagberi primary school
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2008
- action
- Const. of 2 classrooms
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
sabunley secondary school
- location
-
Jugbaro
(in Wajir East)
- year first funded
- 2008
- action
- Const. of 2 classrooms
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
construction of staff quarter at riba dispensary
- location
-
riba
(in Wajir East)
- year first funded
- 2009
- action
- construction of staff qauter
- output
- improve acess to heatlh
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
dambas primary school
- location
-
dambas
(in Wajir East)
- year first funded
- 2009
- action
- construction of staff qauter
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Construction of staff qtrs. at Dambas Health center
- location
-
Dambas
(in Wajir East)
- year first funded
- 2008
- action
- Const. of Staff Qtrs.
- output
- Improve Access to H/care
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
constructio of staff quarter at dashek dispensary
- location
-
dasheeq
(in Wajir East)
- year first funded
- 2009
- action
- construction of staff qauter
- output
- improve acess to heatlh
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
construction of staff quarter at duntow dispensary
- location
-
duntow
(in Wajir East)
- year first funded
- 2009
- action
- construction of staff qauter
- output
- improve acess to heatlh
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Dasheek primary school
- location
-
Dasheeq
(in Wajir East)
- year first funded
- 2008
- action
- Const. of 2 classrooms
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
sarman primary school
- location
-
sarman
(in Wajir East)
- year first funded
- 2009
- action
- construction of 2 classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
dambas dining hall
- location
-
dambas
(in Wajir East)
- year first funded
- 2009
- action
- renovation of 26classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
wajir yoth polytechnic
- location
-
wagberi
(in Wajir East)
- year first funded
- 2009
- action
- renovation of 6 classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
wajir girls primary
- location
-
Jugbaru
(in Wajir East)
- year first funded
- 2005
- action
- Construction of Kitulo
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 740,000
- estimate
- Ksh 740,000
Wajir High
- location
-
hodhan
(in Wajir East)
- year first funded
- 2006
- action
- Equiping of a library
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Tarbaj School
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2003
- action
- construction of class rows
- output
- increase enrolment
- implementation status
- complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
tarbaj primary school
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2007
- action
- Renovation of a domitory
- output
- Increased enrolment
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Supply of water pumps to Abdiazi location
- location
-
Wagberi
(in Wajir East)
- year first funded
- 2007
- action
- Supply of water pumps
- output
- Improve Agri/Prod.
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
digging and capping of 4 wells at wagberi location
- location
-
wagberi
(in Wajir East)
- year first funded
- 2009
- action
- digging and capping of 4 wells
- output
- mitigate water shortage
- implementation status
- complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Construction and Digging shallow wells of water at wagberi
- location
-
wagberi
(in Wajir East)
- year first funded
- 2003
- action
- Digging of shallow wells
- output
- metyate water shotage
- implementation status
- complete
- total cost
- Ksh 320,000
- estimate
- Ksh 320,000
Dambas primary school
- location
-
dambas
(in Wajir East)
- year first funded
- 2008
- action
- renovation of 2 classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Wajir Girls secondary school
- location
-
Jugbaru
(in Wajir East)
- year first funded
- 2008
- action
- Supply of Computers
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
jubaro primary school
- location
-
jugbaro
(in Wajir East)
- year first funded
- 2009
- action
- renovation of 2 classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
supply and installation of plastic tank to duntow dispensary
- location
-
duntow
(in Wajir East)
- year first funded
- 2009
- action
- supply/instaaltion of tanks
- output
- mitigate water shortage
- implementation status
- supplied
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
supply and installation of plastic tank to wajirbor dispensary
- location
-
wajirbor
(in Wajir East)
- year first funded
- 2009
- action
- supply/instaaltion of tanks
- output
- mitigate water shortage
- implementation status
- supplied
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
kalkacha primary school
- location
-
kalkacha
(in Wajir East)
- year first funded
- 2009
- action
- renovation of 2 classrooms
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
supply and installation of plastic tank to tarbaj maternity
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2009
- action
- supply/instaaltion of tanks
- output
- mitigate water shortage
- implementation status
- supplied
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Digging & capping of 6 wells at Hodhan
- location
-
Hodhan
(in Wajir East)
- year first funded
- 2005
- action
- Digg. & Cappy of wells
- output
- Mutigate water shortage
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Digging & capping of 6 wells at Jugbaro
- location
-
jugbaro
(in Wajir East)
- year first funded
- 2005
- action
- Digging & Cappy of 6 wells
- output
- Mutigate water shortage
- implementation status
- Complete
- total cost
- Ksh 240,000
- estimate
- Ksh 240,000
Downtown primary school
- location
-
Dunto
(in Wajir East)
- year first funded
- 2005
- action
- Matress & bed supply
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 232,000
- estimate
- Ksh 232,000
Duntow primary
- location
-
duntow
(in Wajir East)
- year first funded
- 2006
- action
- Supply of Deds & Matts
- output
- Increase Enrolment
- implementation status
- Complete
- total cost
- Ksh 230,000
- estimate
- Ksh 230,000
Renovation of Staff Qtrs at Tarbaj dispensary
- location
-
Tarbaj
(in Wajir East)
- year first funded
- 2008
- action
- Renovtn of Staff Qtrs.
- output
- Improve Access to H/care
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Digging & Capping of wells at Dasheeq location
- location
-
Dasheeq
(in Wajir East)
- year first funded
- 2008
- action
- Digging & Capping of supply of water tank
- output
- Mitigate Water Shortage
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
dambas primary school
- location
-
dambas
(in Wajir East)
- year first funded
- 2009
- action
- construction of 2 toilets
- output
- improve sanitation
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Dunto primary
- location
-
dunto
(in Wajir East)
- year first funded
- 2005
- action
- Const. of 2 pitlatrines & 2 bathrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
kalkacha primary school
- location
-
kalkacha
(in Wajir East)
- year first funded
- 2009
- action
- construction of 2 toilets
- output
- improve sanitation
- implementation status
- complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Lafaley Primary school
- location
-
Lafaley
(in Wajir East)
- year first funded
- 2008
- action
- Renov. Of classrooms
- output
- Improve learning
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Dasheeg primary
- location
-
Dasheeg
(in Wajir East)
- year first funded
- 2005
- action
- Supply of desks
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 165,000
- estimate
- Ksh 165,000
riba primary
- location
-
riba
(in Wajir East)
- year first funded
- 2009
- action
- supply & transp.of 40 desks
- output
- improve learning
- implementation status
- supplied
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
tarbaj primary
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2009
- action
- supply & transp.of 40 desks
- output
- improve learning
- implementation status
- supplied
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
wagberi primary
- location
-
wagberi
(in Wajir East)
- year first funded
- 2009
- action
- supply & transp.of 40 desks
- output
- improve learning
- implementation status
- supplied
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
duntow primary
- location
-
duntow
(in Wajir East)
- year first funded
- 2009
- action
- supply & transp.of 40 desks
- output
- improve learning
- implementation status
- supplied
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
dasheeq primary
- location
-
dasheeq
(in Wajir East)
- year first funded
- 2009
- action
- supply & transp.of 40 desks
- output
- improve learning
- implementation status
- supplied
- total cost
- Ksh 140,000
- estimate
- Ksh 140,000
duntow primary school
- location
-
duntow
(in Wajir East)
- year first funded
- 2009
- action
- supply of motorbike
- output
- improve learning
- implementation status
- complete
- total cost
- Ksh 135,000
- estimate
- Ksh 135,000
Construction of 2 toilets of Wajir bor dispensary
- location
-
Wajir Bor
(in Wajir East)
- year first funded
- 2003
- action
- Construction of 2 toilets
- output
- Improve sanitation
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Tarbaj primary
- location
-
Tarbaj
(in Wajir East)
- year first funded
- 2005
- action
- Supply of desks
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Dasheeg School
- location
-
Dasheeg
(in Wajir East)
- year first funded
- 2005
- action
- Construction of a varandah
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
tarbaj School
- location
-
tarbaj
(in Wajir East)
- year first funded
- 2005
- action
- Const. of 2 Classrooms
- output
- Improve Learning
- implementation status
- Complete
- total cost
- Ksh 50,000
- estimate
- Ksh 50,000