The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Buna Boys Secondary School
- location
-
Buna
(in Wajir North)
- year first funded
- 2005
- action
- n/a
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 8,025,865
- estimate
- Ksh 8,025,865
Wataraya Water Pan
- location
-
Bute
(in Wajir North)
- year first funded
- 2005
- action
- Excavate A New Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 5,000,000
- estimate
- Ksh 5,000,000
Kulani Water Project
- location
-
Gurar
(in Wajir North)
- year first funded
- 2006
- action
- n/a
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Gagaba Water Project
- location
-
Dugo
(in Wajir North)
- year first funded
- 2006
- action
- n/a
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Leveling Of Showriqako Hill
- location
-
Gurar
(in Wajir North)
- year first funded
- 2005
- action
- Improve Road Network
- output
- Improve Roads
- implementation status
- Complete
- total cost
- Ksh 4,000,000
- estimate
- Ksh 4,000,000
Ajawa Water Pan
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2006
- action
- A New Pan
- output
- Improve Water Standard
- implementation status
- Complete
- total cost
- Ksh 3,500,000
- estimate
- Ksh 2,500,000
Excavation Of Anew Pan
- location
-
Buna
(in Wajir North)
- year first funded
- 2007
- action
- Excavation Of Ter Pan
- output
- Improve Water Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
District Commissioner House In Bute
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of Dc House
- output
- Improve Administration Facilities.
- implementation status
- No Yet Started.
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Construction Of Maternity Ward In Bute
- location
-
Bute
(in Wajir North)
- year first funded
- 2003
- action
- Site Survey. Construction of Maternity Ward
- output
- Support Health Facilities
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,300,000
Drilling Of Borehole In Quadama
- location
-
Quadama
(in Wajir North)
- year first funded
- 2003
- action
- Drilled Water Supply
- output
- Improve Water Supply
- implementation status
- Drilled
- total cost
- Ksh 2,000,787
- estimate
- Ksh 2,000,787
Drilling Of Borehole In Dobu
- location
-
Quadama
(in Wajir North)
- year first funded
- 2004
- action
- Drilled Borehole
- output
- Improve Water
- implementation status
- Drilled
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Expansion Of Road Network In Gurar
- location
-
Gurar
(in Wajir North)
- year first funded
- 2007
- action
- Expansion Of Road
- output
- Improve Road Net Work
- implementation status
- Not Yet Started
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Danaba Water pan
- location
-
Danaba
(in Wajir North)
- year first funded
- 2006
- action
- A New Pan
- output
- Improve Water Atandard
- implementation status
- Complete
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Drilling Of Borehole In Ajawa
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2004
- action
- Drilled Borehole
- output
- Improve Water
- implementation status
- Drilled
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Quadama Dispensary
- location
-
Quadama
(in Wajir North)
- year first funded
- 2006
- action
- Construction of A Dispensary And 2 Toilets
- output
- Improve Health
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Excavation Of A New Water Pan Ingirir
- location
-
Ingirir
(in Wajir North)
- year first funded
- 2007
- action
- Excavation Of A New Pan
- output
- Improve Water Access
- implementation status
- No Work Yet Done
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Bute Library Hall
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of Reading Hall
- output
- Improving Education Standard
- implementation status
- Not Yet Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Laboratory For Bute Girls Secondary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of A Laboratory
- output
- Improvement Of Education Standards
- implementation status
- Not Yet Started
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Adadijole Dispensary
- location
-
Orgoji
(in Wajir North)
- year first funded
- 2006
- action
- n/a
- output
- Improve Health
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Dispensary In Dugo
- location
-
Dugo
(in Wajir North)
- year first funded
- 2005
- action
- Improve Road Network
- output
- Improve Health
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Dispensary In Orgoji
- location
-
Orgoji
(in Wajir North)
- year first funded
- 2005
- action
- Construction of Dispensary And 2 Toilets
- output
- Improve Health
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Quadama Dispensary
- location
-
Quadama
(in Wajir North)
- year first funded
- 2004
- action
- Construction of Dispensary And 2 Toilets
- output
- Improve Health Standard
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Bute Girls School
- location
-
Bute
(in Wajir North)
- year first funded
- 2004
- action
- Survey, Construction of A House
- output
- To Improve Housing In School
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
H M House In Bute Girls Secondary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2004
- action
- Construction Of Staff House
- output
- Support Housing In School
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Ingirir Dispensary
- location
-
Ingirir
(in Wajir North)
- year first funded
- 2006
- action
- Construction of A Dispensary And 2 Toilets
- output
- -
- implementation status
- Ongoing
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Bute Helu Pump House
- location
-
Bute Helu
(in Wajir North)
- year first funded
- 2006
- action
- To Be Reallocated For A Dormitory
- output
- Improve Education
- implementation status
- -
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Rooms For Administration Police
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of 3 Rooms
- output
- Improve Security House
- implementation status
- Not Yet Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Danaba School
- location
-
Danaba
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of 3 Classroom
- output
- Improve Education Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Gurar School
- location
-
Gurar
(in Wajir North)
- year first funded
- 2006
- action
- Renovation Of 8 Classrooms
- output
- -
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Additional Fund To Gagaba Water Project
- location
-
Dugo
(in Wajir North)
- year first funded
- 2007
- action
- Excavation Of New Pan
- output
- Improve Water Facilities
- implementation status
- Compete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Disilting Of Quadama Pan
- location
-
Quadama
(in Wajir North)
- year first funded
- 2004
- action
- Disilt A Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Disilting Of Pan Korondille
- location
-
Korondille
(in Wajir North)
- year first funded
- 2005
- action
- Disilt A Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Saka Girls Secondary School
- location
-
Saka (Gsa)
(in Wajir North)
- year first funded
- 2006
- action
- Construction of A Domitory
- output
- Improve Education Standard
- implementation status
- -
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Additional Funding To Wataraya Water Project In Bute
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Excavation Of Water Pan
- output
- Improve Water Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Godoma Primary School
- location
-
Godoma
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of Adormitory
- output
- Improve Housing Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Additional Fund To Ajawa Pan
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2007
- action
- Excavation Of Apan
- output
- Improve Water Standard
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Korondille Primary School
- location
-
Korondille
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of 1 Dormitory
- output
- Improve Education Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bute Helu Primary School
- location
-
Bute Helu
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of A Dormitory
- output
- Improve Education Standards
- implementation status
- No Work Yet Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Desilting A Pan In Qudama
- location
-
Qudama
(in Wajir North)
- year first funded
- 2007
- action
- Desilting A Water Pan
- output
- Improve Water Access
- implementation status
- No Work Yet Done
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Buna New Primary School
- location
-
Buna
(in Wajir North)
- year first funded
- 2003
- action
- Site Survey, Construction of 2No. Classrooms, Toilet, Water Tank
- output
- Support Education Programme
- implementation status
- Complete
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Orgoji Water Pan
- location
-
Ogorji
(in Wajir North)
- year first funded
- 2004
- action
- Excavate A New Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Equipping Of Dispensaryies
- location
-
Godama, Dugo, Ogorji, Malkagufu, Qudama, Adadijole.
(in Wajir North)
- year first funded
- 2007
- action
- Equipping Of Dispensaries
- output
- Improve Access To Health Facilities
- implementation status
- No Work Yet Done
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Water Tank At Korondille
- location
-
Korondille
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of A Water Tank
- output
- Improve Access To Water
- implementation status
- Not Yet Started
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Fanabua Primary School
- location
-
Buna
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Improve Education Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Dugo School
- location
-
Dugo
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of Class Room
- output
- Improve Education Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Integrated Primary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms
- output
- Improvement Of Education Standards
- implementation status
- Not Yet Started.
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Malaba Primary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2006
- action
- Renovation 8 Classrooms
- output
- Improve Education Standard
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Noclassrooms In Ogorji
- location
-
Ogorji
(in Wajir North)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Improve Education
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Water Tank On Lakole North
- location
-
Lakole North
(in Wajir North)
- year first funded
- 2006
- action
- Reallocated For 2 Classrooms
- output
- -
- implementation status
- On Going
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Ajawa Dispensary
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2005
- action
- Renovate A Dispensary
- output
- Improve Health
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
No Classrooms In Dugo
- location
-
Dugo
(in Wajir North)
- year first funded
- 2005
- action
- Construction of 2 No. Classrooms
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Noclassrooms In Ingirir
- location
-
Ingirir
(in Wajir North)
- year first funded
- 2005
- action
- Construction of 2 No. Classrooms
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Noclassrooms In Danaba
- location
-
Danaba
(in Wajir North)
- year first funded
- 2005
- action
- Construction of 2 No. Classrooms
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Ajawa Water Pan
- location
-
Ajawa
(in Wajir North)
- year first funded
- 2004
- action
- Construction of Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Water Pan In Ingirir
- location
-
Ingirir
(in Wajir North)
- year first funded
- 2003
- action
- Site Survey, Excavate Water Pan
- output
- Help Water Issue
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Dugo Water Pan
- location
-
Dugo
(in Wajir North)
- year first funded
- 2004
- action
- Excavate A Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Noclassrooms In Quadama
- location
-
Quadama
(in Wajir North)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- To Improve Education Standard
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Noclassrooms In Ingirir
- location
-
Ingirir
(in Wajir North)
- year first funded
- 2004
- action
- Construction of 2 Classrooms
- output
- Improve Education Standard
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Noclassrooms In Adadijole
- location
-
Ogorji
(in Wajir North)
- year first funded
- 2004
- action
- Construction of A Classroom
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Distilling Of Pan In Danaba
- location
-
Danaba
(in Wajir North)
- year first funded
- 2004
- action
- Disilt A Pan
- output
- Improve Water
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Equipping Bute Community Library
- location
-
Bute
(in Wajir North)
- year first funded
- 2004
- action
- Equip Library
- output
- Improve Library Service
- implementation status
- Equipped
- total cost
- Ksh 560,000
- estimate
- Ksh 560,000
Head Teacher House In Buna Secondary School
- location
-
Buna
(in Wajir North)
- year first funded
- 2007
- action
- Completion Of Head Teacher House
- output
- Improve Education Facilities
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Furniture In Bute Girls
- location
-
Bute
(in Wajir North)
- year first funded
- 2006
- action
- Purchase Furniture For School
- output
- Improve Education
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Underground Wall Tank For Bute Boys Secondary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Construction Of Water Tank
- output
- Improving Water Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
One Classroom In Korondille
- location
-
Korondille
(in Wajir North)
- year first funded
- 2006
- action
- Construction of A Classroom
- output
- Improve Education
- implementation status
- -
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Furniture In Bute Boys
- location
-
Bute
(in Wajir North)
- year first funded
- 2006
- action
- Procumbent Stage
- output
- -
- implementation status
- -
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Bute Arid Zone Primary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2007
- action
- Purchase Of Furnitures
- output
- Improving Education Facilities
- implementation status
- Not Yet Started
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Pipe Of Water In Bute Secondary School
- location
-
Bute
(in Wajir North)
- year first funded
- 2003
- action
- Pipe Water
- output
- Support Waer In School
- implementation status
- Complee
- total cost
- Ksh 270,000
- estimate
- Ksh 270,000
Bute Air Strip
- location
-
Bute
(in Wajir North)
- year first funded
- 2004
- action
- Air Strip Constructed
- output
- -
- implementation status
- not known
- total cost
- Ksh 143,999
- estimate
- Ksh 143,999