The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Wajir South

Salalmaa Borehole

location
Diff (in Wajir South)
year first funded
2004
action
Geosurvey,Drilling & Equipping Of Salalmaa Borehole
output
Access To Clean Water To Community
implementation status
Completed & Operational
total cost
Ksh 6,150,000
estimate
Ksh 6,150,000

Abakore / Sabuli Drift

location
Abakore (in Wajir South)
year first funded
2006
action
Construction Of A Drift Btw Abakore / Sabuli Roads.
output
Improve Road Accessibility During Rainy Season.
implementation status
Completed
total cost
Ksh 5,800,000
estimate
Ksh 5,800,000

Khalif Mude Road

location
Habaswein (in Wajir South)
year first funded
2009
action
Constructions Of A 40M Drift At Khalif Mude Road.
output
Improvement Of Infrastructure
implementation status
Completed And In Use.
total cost
Ksh 5,500,000
estimate
Ksh 5,500,000

Habaswein Cdf Office

location
Habaswein (in Wajir South)
year first funded
2007
action
Construction & Equipping Of Cdf Office
output
Improve Administration
implementation status
Completed
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Diff Airstrip

location
Diff (in Wajir South)
year first funded
2007
action
Fencing & Grading Of Airstrip
output
Improve Infrastructure
implementation status
Completed
total cost
Ksh 5,000,000
estimate
Ksh 5,000,000

Drift At Kursin/ Sukela Road

location
Kursin (in Wajir South)
year first funded
2007
action
Construction Of A Drift At Kursin/ Sukela Road
output
Improve Infrastructure During Rainy Season
implementation status
Completed
total cost
Ksh 4,500,000
estimate
Ksh 4,500,000

Habaswein Secondary School

location
Habaswein (in Wajir South)
year first funded
2007
action
Construction Of 2 Staff Houses & 2 Classrooms At Habaswein Boys Secondary
output
Improve Accommodation And Education Facilities
implementation status
Completed
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Drift Between Habaswein & Dilmanyale

location
Habaswein/ Dilmanyale (in Wajir South)
year first funded
2006
action
Making Drift Between Habaswein/ Dilmanyale
output
Access To Improved Roads During Rainy Season
implementation status
Completed
total cost
Ksh 4,000,000
estimate
Ksh 4,000,000

Administration Block At Habaswein District Hospital

location
Habaswein (in Wajir South)
year first funded
2007
action
Construction Of An Administration Block
output
Improve Administration Facilities
implementation status
Completed
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Dadaja Bulla Replacement Borehole

location
Dadaja Bulla (in Wajir South)
year first funded
2004
action
Drilling A Replacement Borehole
output
Access To Clean Water By Community
implementation status
Completed & Operational
total cost
Ksh 3,000,000
estimate
Ksh 3,000,000

Dagahley Location Dispensary

location
Dagahley (in Wajir South)
year first funded
2008
action
Construction Of A Dispensary, Two Toilets And Furniture
output
Improve Health Standards
implementation status
Completed And In Use.
total cost
Ksh 2,250,000
estimate
Ksh 2,250,000

Kulaley Dispensary And Two Toilets

location
Kulaley (in Wajir South)
year first funded
2009
action
Construction Of A Dispensary And Two Toilets
output
Improve Health Access
implementation status
Completed And In Use.
total cost
Ksh 2,100,000
estimate
Ksh 2,100,000

Maternity Ward At Diff Health Centre

location
Diff (in Wajir South)
year first funded
2008
action
Construction Of A Maternity Ward.
output
Improve Health Standards
implementation status
Completed And In Use.
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Habaswein Girls Secondary School

location
Habaswein (in Wajir South)
year first funded
2003
action
Construction Of Dormitory & Adm Block
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Administration Block For Security Personnel In Diff

location
Diff (in Wajir South)
year first funded
2009
action
Construction Of An Administration Block And Two Toilets At Diff Ap Camp.
output
Improve Security
implementation status
Ongoing
total cost
Ksh 1,900,000
estimate
Ksh 1,900,000

Water Treatment Plant At Kursin

location
Kursin (in Wajir South)
year first funded
2008
action
Water Treatment Plant. Reallocated To Two Classrooms And A Genset.
output
Access To Clean Water By Community
implementation status
Completed And In Use.
total cost
Ksh 1,850,000
estimate
Ksh 1,850,000

Dagahley Borehole

location
Dagahley (in Wajir South)
year first funded
2005
action
Construction Of Pump House, Troughs & Rectification.
output
Improve Access To Clean Water.
implementation status
Completed
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Dadaja Bulla Primary School

location
Dadaja Bulla (in Wajir South)
year first funded
2009
action
Construction Of One Dormitory.
output
Improvement Of Education Standards.
implementation status
Ongoing
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Bush Clearing At Macheza Salalma

location
Diff /Macheza (in Wajir South)
year first funded
2006
action
Bush Clearing Between Salalmaa & Macheza
output
Access To Assist Pastoralist In Moving
implementation status
Completed
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Burder Dispensary

location
Burder (in Wajir South)
year first funded
2003
action
Construction Of Dispensary
output
Improvement Of Health Standards
implementation status
Completed
total cost
Ksh 1,800,000
estimate
Ksh 1,800,000

Biyamathow Primary School

location
Banane (in Wajir South)
year first funded
2008
action
Construction Of A Dining Hall
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Habaswein Girls Secondary School

location
Habaswein (in Wajir South)
year first funded
2009
action
Construction Of One Dormitory.
output
Improve Education Standards
implementation status
Ongoing
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Masonry Water Tank And Troughs At Macheza Borehole

location
Macheza (in Wajir South)
year first funded
2008
action
Construction Of A Masonry Tank, A Trough And Reticulation.
output
Access To Clean Water By Community
implementation status
Completed And In Use.
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Habaswein Boys Secondary School

location
Habaswein (in Wajir South)
year first funded
2008
action
Construction Of A Dormitory
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,700,000
estimate
Ksh 1,700,000

Dadaja Bulla Dispensary

location
Dadaja Bula (in Wajir South)
year first funded
2007
action
Construction Of 1 Staff House At Dadajabulla Dispensary
output
Improve Accommodation Facilities
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Genset For Macheza Borehole

location
Macheza (in Wajir South)
year first funded
2006
action
Purchase Of A Genset For Macheza Borehole
output
Improve Access To Clean Water
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Abubakar Sadiq Orphanage Centre

location
Hodhan (in Wajir South)
year first funded
2006
action
Completion Of 3 Dormitories, Dining Hall Kitchen & Store
output
Improvement Of Education Quality
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Genset For Dadajabulla Borehole

location
Dadajabulla (in Wajir South)
year first funded
2005
action
Purchase Of 1 Genset For Dadajabula Borehole
output
Improve Access To Clean Water.
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Maternity Ward

location
Sabuli (in Wajir South)
year first funded
2004
action
Construction Of Maternity Ward
output
Improvement Of Health Standards
implementation status
Completed
total cost
Ksh 1,500,000
estimate
Ksh 1,500,000

Argani Dispensary

location
Argani (in Wajir South)
year first funded
2004
action
Construction Of Dispensary
output
Improvement Of Health Standards
implementation status
Completed
total cost
Ksh 1,441,740
estimate
Ksh 1,441,740

Salalmaa Water Tank

location
Diif (in Wajir South)
year first funded
2005
action
Construction Of A Water Tank
output
Improve Water Access.
implementation status
Completed
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Hodhan Primary School

location
Hodhan (in Wajir South)
year first funded
2008
action
Fencing Of The School Compound.
output
Improve Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,400,000
estimate
Ksh 1,400,000

Laboratory At Habaswein Girls Secondary School

location
Habaswein (in Wajir South)
year first funded
2006
action
Construction Of School Laboratory
output
Improve Education Standards.
implementation status
Completed
total cost
Ksh 1,300,000
estimate
Ksh 1,300,000

Gulletdere Water Pan

location
Burder (in Wajir South)
year first funded
2004
action
Geo- Survey And Digging Of Water Pan.
output
Improve Water Access
implementation status
Completed.
total cost
Ksh 1,250,000
estimate
Ksh 1,250,000

Construction Of Trough And Piping To Km

location
Abakore (in Wajir South)
year first funded
2004
action
Construction Of 3 Troughs & Piping System.
output
Improvement Of The Livestock During The High Temperatures
implementation status
Completed
total cost
Ksh 1,240,000
estimate
Ksh 1,240,000

Habaswein Mixed Secondary School

location
Habaswein (in Wajir South)
year first funded
2008
action
Construction Of Two Classrooms & 2 Toilets.
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Abdille Gab Primary School

location
Dagahley (in Wajir South)
year first funded
2008
action
Construction Of Two Classrooms And Two Toilets.
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Kursin Water Tank

location
Kursin (in Wajir South)
year first funded
2005
action
Construction Of Kursin Elevated Tank.
output
Improve Access To Water.
implementation status
Completed
total cost
Ksh 1,200,000
estimate
Ksh 1,200,000

Gerille Primary School

location
Gerille (in Wajir South)
year first funded
2008
action
Construction Of Two Classrooms & 2 Toilets
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Biyamathow Secondary School

location
Banane (in Wajir South)
year first funded
2008
action
Construction Of Two Class
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Burder Primary School

location
Burder (in Wajir South)
year first funded
2008
action
Construction Of Two Classrooms
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,100,000
estimate
Ksh 1,100,000

Kursin Water Pan

location
Kursin (in Wajir South)
year first funded
2004
action
Digging Of Kursin Water Pan
output
Access To Water Service To Community
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

School Bus For Wajir Secondary School

location
Hodhan (in Wajir South)
year first funded
2009
action
Purchase Of School Bus. Co- Funding With Cdf Wajir East, Wajir West And Wajir North.
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Burder Water Pans

location
Burder (in Wajir South)
year first funded
2006
action
Desilting Of 2 Water Pans At Burder
output
Improve Access To Water
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Burder Water Pan

location
Burder (in Wajir South)
year first funded
2006
action
Fencing 2 Water Pans At Burder
output
Improved Access To Clean Water.
implementation status
Completed
total cost
Ksh 1,000,000
estimate
Ksh 1,000,000

Hambalash Water Pan

location
Diff (in Wajir South)
year first funded
2006
action
Desilting Water Pan
output
Improve Access To Water
implementation status
Completed
total cost
Ksh 850,000
estimate
Ksh 850,000

Macheza Underground Water Tank

location
Macheza (in Wajir South)
year first funded
2004
action
Construction Of Under Ground Water Tank
output
Access To Clean Drinking Water By Pastoralists
implementation status
Completed
total cost
Ksh 840,000
estimate
Ksh 840,000

Office Computers And Tables, Cabinet And Fitting Of Registry And Kitchen

location
Habaswein (in Wajir South)
year first funded
2009
action
Purchase Of Two Office Computers, 2 Computer Tables, Fitting Of Kitchen And Registry With Drawers.
output
Improvement Of Office Administration
implementation status
Completed And In Use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Sarif Dispensary Staff Houses

location
Sarif (in Wajir South)
year first funded
2004
action
Construction Of Staff Houses For The Dispensary
output
Access To Improve Health Status
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Kursin Primary School

location
Kursin (in Wajir South)
year first funded
2004
action
Construction Of 2 Classroom At Kursin Pry School
output
Improvement Of Education Status
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Haraqotqot Genset

location
Tesorie (in Wajir South)
year first funded
2004
action
Supply Genset
output
Improvement Of Water Access To Community
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Dagahley Primary School

location
Dagahley (in Wajir South)
year first funded
2004
action
Construction Of 2 Classrooms At Dagahley Pry School
output
Improve Education Standards
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Dilmanyale Primary School

location
Dilmanyale (in Wajir South)
year first funded
2005
action
Construction Of 2 Classroom
output
Improve Access To Edu.
implementation status
Completed.
total cost
Ksh 800,000
estimate
Ksh 800,000

Habaswein Dispensary

location
Habaswein (in Wajir South)
year first funded
2005
action
Construction Of Kitchen & Store.
output
Improve Health Standards.
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Hodhan Primary School

location
Hodhan (in Wajir South)
year first funded
2006
action
Construction Of 2 Classrooms
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Sarif Primary School

location
Sarif (in Wajir South)
year first funded
2006
action
Construction Of 2 Staff Houses
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Dagahley Primary School

location
Dagahley (in Wajir South)
year first funded
2006
action
Construction Of 2 Class
output
Improve Access To Education.
implementation status
Completed
total cost
Ksh 800,000
estimate
Ksh 800,000

Habaswein Mixed Secondary School

location
Habaswein (in Wajir South)
year first funded
2008
action
Construction Of H/MasterS Office & Staff
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Completion Of A Maternity Ward At Sabule Hc

location
Sabule (in Wajir South)
year first funded
2008
action
Construction Of A Septic Tank, Placenta Pit & 1 Toilet
output
Improve Health Standards
implementation status
Completed And In Use.
total cost
Ksh 800,000
estimate
Ksh 800,000

Harakotqot / Kursin Pumps

location
Tesorie (in Wajir South)
year first funded
2006
action
2 Submersible Pumps At Harakotqot & Kursin Boreholes.
output
Improve Access To Water
implementation status
Completed
total cost
Ksh 740,000
estimate
Ksh 740,000

Kulaaley Primary School

location
Kulaaley (in Wajir South)
year first funded
2008
action
Construction Of Two Staff Houses
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 700,000
estimate
Ksh 700,000

Habaswein Production Centre For Energy Saving Jikos

location
Habaswein (in Wajir South)
year first funded
2009
action
Construction Of Production Centre For Energy Saving Jikos.
output
Improvement Of Living Standards
implementation status
Completed And In Use.
total cost
Ksh 700,000
estimate
Ksh 700,000

Reconstruction Of Old Dispensary At Habaswein

location
Habaswein (in Wajir South)
year first funded
2009
action
Reconstruction Of Old Building At The Habaswein Dispensary.
output
Improve Health Standards
implementation status
not known
total cost
Ksh 700,000
estimate
Ksh 700,000

Troughs And Reticulation At Dilmanyale Borehole

location
Dilmanyale (in Wajir South)
year first funded
2008
action
Construction Of 3 Troughs And Reticulation.
output
Access To Clean Water By Community
implementation status
Completed And In Use.
total cost
Ksh 700,000
estimate
Ksh 700,000

Burder Primary School

location
Burder (in Wajir South)
year first funded
2008
action
Supply Of 80 Beds, Mattresses And 160 Bedsheets To Burder Primary
output
Improve Education Standards
implementation status
Completed And In Use.
total cost
Ksh 700,000
estimate
Ksh 700,000

Physical Planning For Habaswein Township

location
Habaswein (in Wajir South)
year first funded
2009
action
Physical Planning
output
Create Properly Planned Town.
implementation status
Ongoing
total cost
Ksh 600,000
estimate
Ksh 600,000

Habaswein Mixed Secondary School

location
Habaswein (in Wajir South)
year first funded
2009
action
Construction Of One Class
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 600,000
estimate
Ksh 600,000

Wajir Primary School

location
Hodhan (in Wajir South)
year first funded
2009
action
Construction Of One Class
output
Improve Education Standards
implementation status
Completed And In Use
total cost
Ksh 600,000
estimate
Ksh 600,000

Habaswein Library

location
Habaswein (in Wajir South)
year first funded
2006
action
Construction Of Library Office Store.
output
Improve Access To Reading.
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 600,000

Sabuli Dispensary Staff Houses

location
Sabuli (in Wajir South)
year first funded
2006
action
Renovation Of Dispensary & Staff Houses
output
Assist In Improvement Of Health Services
implementation status
Completed
total cost
Ksh 600,000
estimate
Ksh 600,000

Laboratory At Habaswein Girls Secondary School

location
Habaswein (in Wajir South)
year first funded
2008
action
Installation And Fitting At The School Laboratory
output
Improve Education Standards
implementation status
Completed And In Use.
total cost
Ksh 550,000
estimate
Ksh 550,000

Tesorie Primary School

location
Tesorie (in Wajir South)
year first funded
2008
action
Construction Of One Classroom
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 500,000
estimate
Ksh 500,000

Diff Water Pan

location
Diif (in Wajir South)
year first funded
2006
action
Desilting Of Diff Water Pan
output
Improved Access To Water
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Harakotqot Water Pan

location
Tesorie (in Wajir South)
year first funded
2006
action
Desilting Of Harakotqot Water Pan
output
Improved Access To Water Services.
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Pump For Macheza Borehole

location
Macheza (in Wajir South)
year first funded
2005
action
A Submersible Pump Supply.
output
Improve Access To Water
implementation status
Completed.
total cost
Ksh 500,000
estimate
Ksh 500,000

Diff Primary School

location
Diff (in Wajir South)
year first funded
2005
action
Construction Of Kitchen & Store
output
Improve Health Standards
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Sarif Community Pan

location
Sarif (in Wajir South)
year first funded
2005
action
Desilting Of Sarif Water Pan
output
Access To Clean Water Service To Community
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Renovation Of Dispensary Staff House

location
Biyamathow (in Wajir South)
year first funded
2004
action
Renovation Of Dispensary Staff Houses.
output
Improvement Of Health Standards.
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Abakore Primary School

location
Abakore (in Wajir South)
year first funded
2009
action
Construction Of HeadmasterS Office
output
Improvement Of Education Standards.
implementation status
Completed
total cost
Ksh 500,000
estimate
Ksh 500,000

Beds For Sabunley Secondary School

location
Hodhan (in Wajir South)
year first funded
2009
action
Purchase Of 60 Beds
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 500,000
estimate
Ksh 500,000

Capping Of Wells At Wajir Bor

location
Wajir Bor (in Wajir South)
year first funded
2008
action
Capping Of 15 Public Wells At Wajir Bor Location
output
Access To Clean Water By Community
implementation status
Completed And In Use.
total cost
Ksh 500,000
estimate
Ksh 500,000

Rahma Primary School

location
Hodhan (in Wajir South)
year first funded
2008
action
Construction Of Two Classrooms
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 500,000
estimate
Ksh 500,000

Macheza Primary School

location
Macheza (in Wajir South)
year first funded
2008
action
Construction Of One Classroom
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 500,000
estimate
Ksh 500,000

Submersible Pump For Habaswein Borehole

location
Habaswein (in Wajir South)
year first funded
2009
action
Purchase Of ;5 Kw Submersible Pump.
output
Improvement Of Water Access.
implementation status
Completed And In Use.
total cost
Ksh 490,000
estimate
Ksh 490,000

Dagahley & Haraqotkot Boreholes

location
Dagahley / Tesorie (in Wajir South)
year first funded
2006
action
Purchase Of 2 Control Panels For The Boreholes.
output
Improve Access To Water
implementation status
Completed
total cost
Ksh 460,000
estimate
Ksh 460,000

Office Photocopier, Printer, Scanner And Binding Machine

location
Habaswein (in Wajir South)
year first funded
2009
action
Purchase Office Photocopier, Printer, Scanner And Heavy Duty Binding Machine.
output
Improvement Of Office Administration.
implementation status
Completed And In Use.
total cost
Ksh 452,386
estimate
Ksh 452,386

Hodhan Primary School

location
Hodhan (in Wajir South)
year first funded
2009
action
Construction Of A Kitchen.
output
Improve Education Standards
implementation status
Completed And In Use.
total cost
Ksh 400,000
estimate
Ksh 400,000

Clinical Room At Hodhan Dispensary

location
Hodhan (in Wajir South)
year first funded
2008
action
Construction Of A Clinical Room
output
Improve Health Standards
implementation status
Completed And In Use.
total cost
Ksh 400,000
estimate
Ksh 400,000

Solar System For Abakore & Meri Primary School s

location
Abakore/ Meri (in Wajir South)
year first funded
2008
action
Installation Of Solar System For Two Classrooms Each In Abakore And Meri Primary Schools
output
Improvement Of Education Standards
implementation status
Completed And In Use.
total cost
Ksh 400,000
estimate
Ksh 400,000

Wajir Bor Primary School

location
Wajir Bor (in Wajir South)
year first funded
2006
action
Construction Of 1 Classroom
output
Improve Access To Education.
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Abakore Primary School

location
Abakore (in Wajir South)
year first funded
2005
action
Construction Of 1 Classroom
output
Improve Access To Edu.
implementation status
Completed.
total cost
Ksh 400,000
estimate
Ksh 400,000

Habaswein Boys Secondary School

location
Habaswein (in Wajir South)
year first funded
2005
action
Construction Of One Class
output
Improve Access To Education.
implementation status
Completed.
total cost
Ksh 400,000
estimate
Ksh 400,000

H/T Office At Wajir-Bor Primary School

location
WajirBor (in Wajir South)
year first funded
2005
action
Construction Of 1 Classroom
output
Improve Education Standards
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Diff Water Supply

location
Diff (in Wajir South)
year first funded
2004
action
Construction Of A Water Kiosk And Supply System.
output
Improve Access To Water.
implementation status
Completed.
total cost
Ksh 400,000
estimate
Ksh 400,000

Habaswein Primary School

location
Habaswein (in Wajir South)
year first funded
2003
action
Completion Of Four Classrooms
output
Improve Education Standards
implementation status
Completed
total cost
Ksh 400,000
estimate
Ksh 400,000

Dadajabulla Troughs

location
Dadajabulla (in Wajir South)
year first funded
2006
action
Construction Of 3 Troughs
output
Improve Access To Water By Animals
implementation status
Completed
total cost
Ksh 375,000
estimate
Ksh 375,000

H/T Office At Dadajabulla Primary School

location
Dadajabulla (in Wajir South)
year first funded
2006
action
Construction Of H/Teachers Office.
output
Improve Access To Education.
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Kursin Primary School

location
Kursin (in Wajir South)
year first funded
2006
action
Construction Of H/Teachers Office.
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Admin Block At Hodhan Primary School

location
Hodhan (in Wajir South)
year first funded
2005
action
Construction Of An Adm. Block.
output
Improve Access To Education.
implementation status
Completed.
total cost
Ksh 350,000
estimate
Ksh 350,000

H/T Office At Sarif Primary School

location
Sarif (in Wajir South)
year first funded
2005
action
Construction Of 1 H/Teachers Office
output
Improve Education Standards
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Ndege Primary School

location
Ndege (in Wajir South)
year first funded
2004
action
Construction Of H/Masters Office
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Dilmanyale Primary School

location
Dilmanyale (in Wajir South)
year first funded
2004
action
Construction Of H/Masters Office
output
Improvement Of Education Standard
implementation status
Completed
total cost
Ksh 350,000
estimate
Ksh 350,000

Toilets For Dagahley Primary School

location
Dagahley (in Wajir South)
year first funded
2009
action
Construction Of 4 Pit Latrines.
output
Improvement Of Health Standards
implementation status
Completed And In Use
total cost
Ksh 320,000
estimate
Ksh 320,000

Water Tower And Two Public Toilets At Treasury

location
Habaswein (in Wajir South)
year first funded
2009
action
Construction Of Water Tower & 2 Public Toilets
output
Improvement Of Health Standards
implementation status
Ongoing.
total cost
Ksh 300,000
estimate
Ksh 300,000

Wajir Bor Water Tank

location
Wajir Bor (in Wajir South)
year first funded
2006
action
Construction Of A Water Tank
output
Improve Access To Water
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Diff Dispensary

location
Diff (in Wajir South)
year first funded
2004
action
Renovation Of Diff Dispensary
output
Improve Health Standards
implementation status
Completed
total cost
Ksh 300,000
estimate
Ksh 300,000

Old Habaswein Primary School

location
Habaswein (in Wajir South)
year first funded
2008
action
Renovation Of Stores For Sfp.
output
Improve Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 250,000
estimate
Ksh 250,000

Dadajabulla Pump House

location
Dadajabulla (in Wajir South)
year first funded
2005
action
Construction Of Pump House
output
Improve Water Access.
implementation status
Completed
total cost
Ksh 250,000
estimate
Ksh 250,000

Triple Pulley Borehole Kit For The District

location
Habaswein (in Wajir South)
year first funded
2009
action
Purchase Of Borehole Retrieval Kit Consisting Of Triple Pulley Kit For Emergencies.
output
Improvement Of Water Standards.
implementation status
Completed And In Use.
total cost
Ksh 200,000
estimate
Ksh 200,000

Dadaja Bulla Primary School

location
Dadaja Bulla (in Wajir South)
year first funded
2003
action
Re-Roofing Of 3 Classes At Dadaja Bulla Pry. School
output
Improvement Of Education Standards
implementation status
Completed
total cost
Ksh 200,000
estimate
Ksh 200,000

El Adow Primary School

location
Kulaaley (in Wajir South)
year first funded
2008
action
Construction Of 2 Toilets & 50 Desks
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 200,000
estimate
Ksh 200,000

Reticulation At Dadaja Bula Borehole

location
Dadaja Bulla (in Wajir South)
year first funded
2008
action
Reticulation To 3 Troughs.
output
Access To Clean Water By Community
implementation status
Completed And In Use.
total cost
Ksh 200,000
estimate
Ksh 200,000

Dagahley Primary School

location
Dagahley (in Wajir South)
year first funded
2009
action
Renovation Of Two Classrooms- Floor, Doors And Windows.
output
Improve Education Standards
implementation status
Completed And In Use
total cost
Ksh 200,000
estimate
Ksh 200,000

Electrification Of Rahma Primary School

location
Hodhan (in Wajir South)
year first funded
2009
action
Wiring And Installation Of The School.
output
Improvement Of Education Standards.
implementation status
Completed And In Use.
total cost
Ksh 200,000
estimate
Ksh 200,000

Burder Public Toilets

location
Burder (in Wajir South)
year first funded
2004
action
Construction Of 4 Public Toilets
output
Improve Of Health Standards
implementation status
Completed
total cost
Ksh 160,000
estimate
Ksh 160,000

Haraqotqot Pump House

location
Tesorie (in Wajir South)
year first funded
2004
action
Construction Of Pump House
output
Improvement To Borehole Facilities
implementation status
Completed
total cost
Ksh 150,000
estimate
Ksh 150,000

Dispensary Furniture For BuRoader Dispensary

location
Burder (in Wajir South)
year first funded
2009
action
Purchase Of 4 Tables And 10 Chairs For The Dispensary
output
Improve Health Standards.
implementation status
Completed And In Use.
total cost
Ksh 150,000
estimate
Ksh 150,000

Toilets At Biyamathow Ap Camp

location
Biyamathow (in Wajir South)
year first funded
2009
action
Construction Of 2 Pit Latrines.
output
Improvement Of Health Standards
implementation status
Completed And In Use.
total cost
Ksh 150,000
estimate
Ksh 150,000

Three Public Toilets At Salalmaa

location
Diff (in Wajir South)
year first funded
2005
action
Construction Of 3 Public Toilets.
output
Improve Sanitation And Health Standard
implementation status
Completed
total cost
Ksh 120,000
estimate
Ksh 120,000

Sarif Community Toilets

location
Sarif (in Wajir South)
year first funded
2004
action
Construction Of 3 Public Toilets
output
Improve Of Health Standards
implementation status
Completed
total cost
Ksh 120,000
estimate
Ksh 120,000

Habaswein Girls Secondary School

location
Habaswein (in Wajir South)
year first funded
2005
action
Demarcation Of The School.
output
Improve Security Of The School.
implementation status
Completed
total cost
Ksh 100,000
estimate
Ksh 100,000