The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Boji Heri , Wachir , Basir , Athibohol Hadado South Girls & Barmil Schools
- location
-
Boji Heri, Wachir, Basir, Hadado South, Barmil(Total C/Rooms )
(in Wajir West)
- year first funded
- 2005
- action
- Construction Of 15 Classrooms
- output
- Improvement Of Education Standards. Create More Sitting Spaces.
- implementation status
- Completed
- total cost
- Ksh 6,000,000
- estimate
- Ksh 0
Construction Of Dispensary At Ademasajida, Elnur, Basir & Ward At Griftu
- location
-
Ademasajida, Elnur, Basir and Griftu
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of Health Facilities
- output
- Improve Health Services
- implementation status
- Complete And In Use
- total cost
- Ksh 5,600,000
- estimate
- Ksh 0
Construction Of Police Post At Arbajahan
- location
-
Arbajahan
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of Police Post And Fencing
- output
- Improve Security Along Wajir / Moyale/Marsabit Border
- implementation status
- Complete But Project Not Operational As Police Not Posted
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Hon Khalif Girls Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of Fence & Laboratory
- output
- Improve Security At Girls Sch & Provide Lab Services
- implementation status
- Completed
- total cost
- Ksh 5,000,000
- estimate
- Ksh 0
Construction Of Dispensary At Ganyure, Garse Qoftu & Maternity Ward At Hadado
- location
-
Ganyure, Garse Qoftu and Hadado
(in Wajir West)
- year first funded
- 2005
- action
- Construction Of Health Care Facilities In 3 Centers
- output
- Improvement In Health Care
- implementation status
- Completed?
- total cost
- Ksh 4,920,000
- estimate
- Ksh 0
Construction Of Cdf Offices At Griftu
- location
-
Griftu
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Cdf Offices + Toilets At Griftu
- output
- Establish Offices At Constituency Headquarters
- implementation status
- Complete & In Use
- total cost
- Ksh 4,160,000
- estimate
- Ksh 0
Hadado North Secondary School
- location
-
Hadado North
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Admin Block, Classrooms, Dormitory & Toilets
- output
- Establish More Schools For Pry Sch Graduates
- implementation status
- On Going As More Funds Needed As Project Underbudgeted
- total cost
- Ksh 3,583,686
- estimate
- Ksh 0
Wagalla Primary and Eldas Secondary School
- location
-
Wagalla and Eldas
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of D/Halls
- output
- Improve Cooking & Eating Places At 2 Schools
- implementation status
- Completed
- total cost
- Ksh 3,200,000
- estimate
- Ksh 0
Eldas Secondary School
- location
-
Eldas
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of Basic Sec Sch Requirements
- output
- Improvement In Access To Sec Sch By Students
- implementation status
- Completed
- total cost
- Ksh 3,150,000
- estimate
- Ksh 0
Dela Primary School
- location
-
Dela
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Various Project Components
- output
- Improve Retention Of Pastoral Children
- implementation status
- Complete
- total cost
- Ksh 2,300,000
- estimate
- Ksh 0
Ademasajida Secondary School
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Classrooms
- output
- Improve Access To Sec Education
- implementation status
- Ongoing
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Youth Empowerment Centre
- location
-
Eldas
(in Wajir West)
- year first funded
- 2008
- action
- Establishing Various Recreational Facilities
- output
- Improve Vacational Training For Youth
- implementation status
- Reallocated Kshs 2,000,000 For Barmish & Lolkuta North Pry Schs C/Rooms & Purchase Of Water Tank For Cdf Office
- total cost
- Ksh 2,000,000
- estimate
- Ksh 0
Hon Khalif Girls Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Dormitory & Kitchen At Honk Khalif Girls Sec Sch
- output
- Improve Living Conditions Of Students
- implementation status
- Compete In Use
- total cost
- Ksh 1,850,000
- estimate
- Ksh 0
Construction Of Admin Police Housing Units At Eldas
- location
-
Eldas
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Admin Police Housing Uints At Eldas Ap Post
- output
- Improve Morale Of Staff And Increase Retention
- implementation status
- Complete And In Use
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Tulatula Primary School
- location
-
Tulatula
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Dormitory
- output
- Improve Retention Of Pastoral Children
- implementation status
- Complete
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Arbajahan Primary School
- location
-
Arbajahan
(in Wajir West)
- year first funded
- 2003
- action
- Completion Of Dormitory
- output
- Provide Conducive Environment To Learners?
- implementation status
- Completed & Operational
- total cost
- Ksh 1,800,000
- estimate
- Ksh 0
Construction Of Cdf Staff Houses
- location
-
Cdf Office At Griftu
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Staff House/Guest House
- output
- Improve Staff Morale
- implementation status
- Ongoing
- total cost
- Ksh 1,773,280
- estimate
- Ksh 0
Eldas Secondary School
- location
-
Eldas
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Science Lab And 4 Toilets
- output
- Improve Performance In Science Subjects
- implementation status
- Complete And In Use
- total cost
- Ksh 1,740,000
- estimate
- Ksh 0
Maternity At Eldas Dispensary
- location
-
Eldas
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Maternity
- output
- Improve Maternal Child Health
- implementation status
- Ongoing
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Ademasajida Secondary School
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Admin Block
- output
- Improve Sch Facilities
- implementation status
- Not Started
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Ap Houses At El-Nur
- location
-
ElNur
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Houses
- output
- Improve Housing Condition Of Officers
- implementation status
- Complete
- total cost
- Ksh 1,600,000
- estimate
- Ksh 0
Construction Of Social Hall At Hadado North
- location
-
Hadado North
(in Wajir West)
- year first funded
- 2005
- action
- Funds Spent On Construction Of Staff House At Hadado Sec Sch
- output
- Reallocated For Staff Hse Const At Hadado Sec 2008/2009
- implementation status
- Project Reallocated For Const Of Staff Hse At Hadado Sec Sch
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Digging Of Borehole At Tula Tula
- location
-
Tulatula
(in Wajir West)
- year first funded
- 2004
- action
- Digging Of A Borehole
- output
- Project Got Another Financier When A Third Of Funds Were Spent
- implementation status
- Not Known As Project Taken Over By Another Financier?
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Griftu Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2004
- action
- Construction Of Staff House
- output
- Improve Morale Of Teaching Staff
- implementation status
- Completed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Hon Khalif Girls Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of Classrooms & Toilets
- output
- Improve Education & Sanitation Standards.
- implementation status
- Completed?
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Construction Of Dispensary At Shanta Abaq
- location
-
Shanta Abaq
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of Dispensary
- output
- Improvement Of Health Care System
- implementation status
- Completed
- total cost
- Ksh 1,400,000
- estimate
- Ksh 0
Dela
- location
-
Dela
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of 4 Classrooms
- output
- Improve Access & Standards To Education
- implementation status
- Completed
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Const Of Dos Office At Arbajahan
- location
-
Arbajahan
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Do'S Office
- output
- Improve Working Condition
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Const Of Dos Office At Ademasajida
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Do'S Office
- output
- Improve Working Condition
- implementation status
- Not Started
- total cost
- Ksh 1,200,000
- estimate
- Ksh 0
Dam And Diversion Of Laga At Ademasajida
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2004
- action
- Pan Completion & Laga Diversion
- output
- Harvest Surface Rain Water & Reduce Flooding
- implementation status
- Completed
- total cost
- Ksh 1,100,000
- estimate
- Ksh 0
Basir School
- location
-
Basir
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Improve Learning Facilities
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Griftu Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2003
- action
- Fencing & Completion Of 2 Classrooms
- output
- Secure Sch Property And Provide Classrooms For Learners
- implementation status
- Completed & Operational
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Construction Of Dispensary Staff House At Tula Tula
- location
-
Tulatula
(in Wajir West)
- year first funded
- 2006
- action
- Construction Of Staff House
- output
- Improve Staff Morale
- implementation status
- Completed
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Shanta Abaq Dispensary
- location
-
Shanta Abaq
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Staff House
- output
- Improve Housing Condition Of Officers
- implementation status
- Complete
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Laghbogol Dispensary
- location
-
Laghbogol
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Staff House
- output
- Improve Housing Condition Of Officers
- implementation status
- Not Started
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Lolkuta North Primary School
- location
-
Lolkuta North
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms At Lolkuta North Pry
- output
- Improve Learning Facilities
- implementation status
- Ongoing, Funds Reallocated From Youth Empowerement Centre
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Wachiir School
- location
-
Wachiir
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Classrooms
- output
- Improve Learning Facilities
- implementation status
- Ongoing
- total cost
- Ksh 1,000,000
- estimate
- Ksh 0
Const Of Kitchen & Purchase Of Dd Beds And Matresses
- location
-
Tula Tula
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Kitchen& Supply Of Beddings
- output
- Improve Boarding Facilities For Pastoral Children For Retention??
- implementation status
- Not Started
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Boji Yarey Primary School
- location
-
Bojiyarey
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Classroom & Staff House
- output
- Improve Learning Facilities
- implementation status
- Ongoing
- total cost
- Ksh 950,000
- estimate
- Ksh 0
Boji Yarey Centre
- location
-
Boji Yarey Center
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of 2 Classrooms & 2 Toilets At Boji Yarey Center
- output
- Improve Access To Sch As Center Has No Sch
- implementation status
- Complete And In Use
- total cost
- Ksh 920,000
- estimate
- Ksh 0
Digging Of A Pan At Lolkuta South
- location
-
Lolkuta South
(in Wajir West)
- year first funded
- 2004
- action
- Pan Excavation.
- output
- Improve Water Supply And Catchement
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Digging Of A Pan At Lolkuta North
- location
-
Lolkuta North
(in Wajir West)
- year first funded
- 2004
- action
- Pan Excavation
- output
- Improve Water Catchement & Supply?
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Digging Of A Pan At Boji Yarey
- location
-
Boji Yarey
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of Pan Construction
- output
- Harvest Surface Run During Rainy Season For Domestic Use
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Rehabilitatin Of C/Rooms At Eldas Primary School
- location
-
Eldas
(in Wajir West)
- year first funded
- 2009
- action
- Repair Of Classrooms
- output
- Improve Learning Facilities
- implementation status
- Not Started
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Dela Primary School
- location
-
Dela
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Admin Block At Dela Pri
- output
- Improve Sch Infrastructure
- implementation status
- Complete And In Use
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Petitioning Of Griftu Community Library
- location
-
Griftu
(in Wajir West)
- year first funded
- 2007
- action
- Petitioning Of Griftu Community Library
- output
- Improve Education Standards In Schools & Community Members
- implementation status
- Compete But Facility Not Opened
- total cost
- Ksh 720,000
- estimate
- Ksh 0
Equipping Of Dispensaryies At Adhibohol & Shanta Abaqadditional Aie
- location
-
Adhibohol and Shanta Abaq
(in Wajir West)
- year first funded
- 2006
- action
- Purchase Of Standard Dispensary Equipments For 3 Dispensaries
- output
- Improve Health Care & Enable Dispensaries To Be Opened.
- implementation status
- Complete And In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 0
Kilkiley School
- location
-
Kilkiley
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Facilities
- output
- Improve Learning Facilities
- implementation status
- Not Started
- total cost
- Ksh 640,000
- estimate
- Ksh 0
Wagalla Primary School
- location
-
Wagalla
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of Fence & Toilets/Bathrooms
- output
- Secure Sch Compound & Improve Sanitation Standards
- implementation status
- Completed?
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Ganyure School
- location
-
Ganyure
(in Wajir West)
- year first funded
- 2004
- action
- Completion Of Staff House
- output
- Improve Sch Staff Morale & Standards
- implementation status
- Completed
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Water Reticulation At Ademasijida
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2003
- action
- Reticulation Of Water
- output
- Provision Of Clean Water Closer To Community
- implementation status
- Completed?
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Griftu Milk Processing House
- location
-
Griftu
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Cooling Housing
- output
- Improve Quality And Quantity Of Milk Suply
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Laghbogol Dispensary
- location
-
Laghbogol
(in Wajir West)
- year first funded
- 2009
- action
- Additional Cost For Disp Construction
- output
- Move Disp To A Better Site
- implementation status
- Not Started
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Rehahilitation Of Griftu Polytechnic
- location
-
Griftu
(in Wajir West)
- year first funded
- 2008
- action
- Rehabilitation Of Facilities
- output
- Improve Learning Facilities
- implementation status
- Not Started. Reallocation Sort.
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Waso Girls School
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2008
- action
- Construction Of Classroom
- output
- Improve Sch Infrastructure
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Eldas Secondary School Lab
- location
-
Eldas
(in Wajir West)
- year first funded
- 2008
- action
- Completion Of Laboratory
- output
- Improve School Science Performance
- implementation status
- Ongoing
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Construction Of Underground Water Tank At War Adey Acentre
- location
-
Eldas Division, War Adey Centre
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of Under Ground Water Tank At War Adey
- output
- Improve Water Supply And? Catchment
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Bush Clearing On Eldas War Adey Road
- location
-
Eldas War Adey Road
(in Wajir West)
- year first funded
- 2007
- action
- Bush Clearing On Eldas War Adey Rd
- output
- Improve Accessibility Btwn 2 Centres
- implementation status
- Complete And In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Water Reticulation For Hadado South
- location
-
Hadado South
(in Wajir West)
- year first funded
- 2005
- action
- Water Reticulation
- output
- Improvement Of Water Access To Community
- implementation status
- Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Lmd School
- location
-
Ademasajida
(in Wajir West)
- year first funded
- 2007
- action
- Construction 1 Classroom & 1 Toilet At Lmd Centre
- output
- Improve Access To Sch As Center Had No School
- implementation status
- Complete And In Use
- total cost
- Ksh 460,000
- estimate
- Ksh 0
El-Nur Primary School repair
- location
-
ElNur
(in Wajir West)
- year first funded
- 2008
- action
- Repair Of Administration Block
- output
- Repair Works
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Griftu Boys Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom
- output
- Reduce Congestion At Existing Facility
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Development Of Physical Plan For Eldas
- location
-
Eldas
(in Wajir West)
- year first funded
- 2009
- action
- Stakeholders Meeting, Launching Of Plan
- output
- Improve Town Plan
- implementation status
- Ongoing
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Tulatula School
- location
-
Tula Tula
(in Wajir West)
- year first funded
- 2003
- action
- Construction Of 1 Classroom
- output
- Improve Education Standards
- implementation status
- Completed
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Hon Khalif Secondary School Dorm
- location
-
Griftu
(in Wajir West)
- year first funded
- 2008
- action
- Completion Of Project
- output
- Completion
- implementation status
- Completion
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Griftu Boys Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2007
- action
- Griftu Boys Sec Sch
- output
- Improve Sch Infrastructure
- implementation status
- Compete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Kilkiley Primary School
- location
-
Kilkiley
(in Wajir West)
- year first funded
- 2007
- action
- Construction Of 1 Classroom At Kilkiley Pri Sch
- output
- Improve School Infrastructure & Increase Access
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Additional Funds For Dela & Anole Primary School Admin Block
- location
-
Dela and Anole
(in Wajir West)
- year first funded
- 2007
- action
- Additional Funds For Dela Pri Sch Admin Block Construction
- output
- Improve Sch Facilities
- implementation status
- Complete And In Use
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Purchase Of Office Equipment
- location
-
Cdf Office At Griftu
(in Wajir West)
- year first funded
- 2009
- action
- Purchase Of Office Equipments
- output
- Improve Working Condition
- implementation status
- Spent And Bought
- total cost
- Ksh 304,507
- estimate
- Ksh 0
Supply Of Double Decker Beds At Hon Khalif Secondary School
- location
-
Griftu
(in Wajir West)
- year first funded
- 2009
- action
- Purchase Of Dormitory Beds
- output
- Improve Boarding Facilities For Pastoral Children For Retention??
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Wagalla Primary School Staff Hse
- location
-
Wagalla
(in Wajir West)
- year first funded
- 2008
- action
- Completion Of Staff House
- output
- Complete
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Shanta Abaq Dispensary Staff Hse
- location
-
Shanta Abaq
(in Wajir West)
- year first funded
- 2009
- action
- Finishing Of Disp Staff House
- output
- Improve Housing For Health Care Staff
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Const Of B/Room & Toilet At Elnur Ap Hse
- location
-
Elnur
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Sanitation Facilities
- output
- Improve Sanitation For Users
- implementation status
- Complete
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Const Of Public Toilets At Kilkiley
- location
-
Kilkiley
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Toilets
- output
- Improve Community Sanitation
- implementation status
- Not Started
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Lolkuta North Primary School
- location
-
Lolkuta North
(in Wajir West)
- year first funded
- 2009
- action
- Construction Of Toilets
- output
- Improve Sanitation Standards At The School
- implementation status
- Not Started
- total cost
- Ksh 140,000
- estimate
- Ksh 0
Arbajahan Primary School Boarding
- location
-
Arbajahan
(in Wajir West)
- year first funded
- 2009
- action
- Roofing Of Dormitory
- output
- Improve Boarding Facilities For Pastoral Children For Retention??
- implementation status
- Not Started
- total cost
- Ksh 100,000
- estimate
- Ksh 0