The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.
It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.
Education Bursary
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- For Emergency Situation
- output
- Disaster Addressed
- implementation status
- On Going
- total cost
- Ksh 19,881,211
- estimate
- Ksh 36,738,088
Emergency Funds
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Management And Supervision
- output
- Project Completion
- implementation status
- On Going
- total cost
- Ksh 12,837,833
- estimate
- Ksh 5,325,144
Office And Administration Funds
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2003
- action
- n/a
- output
- -
- implementation status
- in use
- total cost
- Ksh 8,142,796
- estimate
- Ksh 3,501,456
Riakimai Model School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Electricity Installation
- output
- Electridicity
- implementation status
- Completed
- total cost
- Ksh 4,749,727
- estimate
- Ksh 3,349,727
Nami Secondary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Completed In Use
- total cost
- Ksh 4,400,000
- estimate
- Ksh 1,800,000
Nyamira Tech Secondary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Supply Of Water Tank
- output
- Water Tank
- implementation status
- Completed In Use
- total cost
- Ksh 3,650,000
- estimate
- Ksh 8,000,000
Mp's Office Construction
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Completed In Use
- total cost
- Ksh 3,200,000
- estimate
- Ksh 3,200,000
Nyamaiya Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- 1 Class Roofed And One At Lintal Stage
- total cost
- Ksh 2,900,000
- estimate
- Ksh 300,000
Motagara Secondary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- At Finishing Level
- total cost
- Ksh 2,800,000
- estimate
- Ksh 1,000,000
Igena Itambe Health Centre
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 2,800,000
- estimate
- Ksh 2,800,000
Nyamaiya-Karota road
- location
-
W.Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- output
- -
- implementation status
- not known
- total cost
- Ksh 2,700,000
- estimate
- Ksh 0
Mongorisi Despensary
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Completed
- total cost
- Ksh 2,650,000
- estimate
- Ksh 1,400,000
Bonyunyu Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 2,600,000
- estimate
- Ksh 4,000,000
Nyamatoki-Geteri -Mabundu-Sironga road
- location
-
Bogichora/Keera
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 2,600,000
- estimate
- Ksh 0
Rangenyo Girls Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- Completed
- total cost
- Ksh 2,550,000
- estimate
- Ksh 3,750,000
Gucha Secondary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- At Finishing Stage
- total cost
- Ksh 2,500,000
- estimate
- Ksh 2,500,000
Nyameru Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Roofed
- total cost
- Ksh 2,500,000
- estimate
- Ksh 0
St. Peters Nyakemincha Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Plastering
- total cost
- Ksh 2,300,000
- estimate
- Ksh 2,000,000
Rural Electricity To All Schools
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 2,260,000
- estimate
- Ksh 760,000
Kenyenya-Kiambere Road
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 2,200,000
- estimate
- Ksh 600,000
Kerobe Bridge
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 2,200,000
- estimate
- Ksh 500,000
Nyakeore Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of Library
- output
- Library
- implementation status
- Flooring Doors
- total cost
- Ksh 2,150,000
- estimate
- Ksh 1,950,000
Riakinaro Health Centre
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Male Wing
- output
- Male Wing
- implementation status
- At Lintal Stage
- total cost
- Ksh 2,150,000
- estimate
- Ksh 500,000
Ogango Health Centre
- location
-
Keera
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of Male Wing
- output
- Male Wing
- implementation status
- New
- total cost
- Ksh 2,060,000
- estimate
- Ksh 2,060,000
Ekenyoro Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- Painting Windowest Pares
- total cost
- Ksh 2,025,000
- estimate
- Ksh 1,650,000
Bonyamatuta Rural Electrification
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Electrification
- output
- -
- implementation status
- New
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Keera Rural Electrification
- location
-
Keera
(in West Mugirango)
- year first funded
- 2004
- action
- Power Installation
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 2,000,000
- estimate
- Ksh 2,000,000
Marindi Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,970,000
- estimate
- Ksh 1,970,000
Getaari Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- 4 Classrooms
- output
- Classrooms
- implementation status
- Plastering Xxx
- total cost
- Ksh 1,850,000
- estimate
- Ksh 2,500,000
Matierio Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- At Roofing Stage
- total cost
- Ksh 1,800,000
- estimate
- Ksh 750,000
Motontera Health Centre
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 1,800,000
- estimate
- Ksh 1,800,000
Nyachururu Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Contruction of admin block
- output
- Adm. Block
- implementation status
- On Going
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,300,000
Kenyambi Dispensary
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 1,750,000
- estimate
- Ksh 1,300,000
Marani Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of School Office
- output
- School Office
- implementation status
- Completed In Use
- total cost
- Ksh 1,710,000
- estimate
- Ksh 1,500,000
Keera Water Springs
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Repair Of Pines
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 1,700,000
- estimate
- Ksh 300,000
St. Joseph Kemasare Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- At Finishing Stage
- total cost
- Ksh 1,700,000
- estimate
- Ksh 2,600,000
Geta Pag Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Finishing Stage
- total cost
- Ksh 1,700,000
- estimate
- Ksh 1,100,000
Kuura Secondary School Dormitory
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- Completed In Use
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,410,000
Makairo Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 1,650,000
- estimate
- Ksh 1,600,000
Rateti Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Completed In Use
- total cost
- Ksh 1,600,000
- estimate
- Ksh 1,500,000
St. Mary's Mogorisi Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Finishing Stage
- total cost
- Ksh 1,600,000
- estimate
- Ksh 2,400,000
Gianchore Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Plastering
- total cost
- Ksh 1,600,000
- estimate
- Ksh 4,100,000
West M Location Water Spring
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 1,500,000
- estimate
- Ksh 700,000
Nyansangio Dispensary
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- At Finishing Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Masosa Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Dinnaing Hall And Adm. Block
- output
- Dinn Ing Hall And Adm Block
- implementation status
- At Lintal Stage
- total cost
- Ksh 1,500,000
- estimate
- Ksh 4,000,000
Miruka/Nyamaiya Power Project
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 1,500,000
- estimate
- Ksh 1,500,000
Kionyomo Water Project
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 1,500,000
- estimate
- Ksh 0
Nyabisimba Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 1,475,000
- estimate
- Ksh 1,500,000
Gekomoni Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of dining Hall
- output
- dining Hall
- implementation status
- At Cable Level
- total cost
- Ksh 1,475,000
- estimate
- Ksh 1,800,000
Nyamokenye Dispensary
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,450,000
- estimate
- Ksh 1,300,000
Nyansabakwa Dispensary
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- -
- implementation status
- in use
- total cost
- Ksh 1,350,000
- estimate
- Ksh 2,300,000
Gianchore Health Centre
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Completed In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,300,000
Nyachogochog Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Contruction of laboratory
- output
- Laboratory
- implementation status
- At Finishing Level
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,000,000
Moikabondo Primary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Finishing Stage
- total cost
- Ksh 1,300,000
- estimate
- Ksh 1,400,000
Nyairicha Special School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- At Finishing Stage
- total cost
- Ksh 1,300,000
- estimate
- Ksh 3,500,000
Riongige Dispensary
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Completed In Use
- total cost
- Ksh 1,300,000
- estimate
- Ksh 500,000
Mangongo Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Complete
- total cost
- Ksh 1,300,000
- estimate
- Ksh 850,000
Getaari Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Completed In Use
- total cost
- Ksh 1,280,000
- estimate
- Ksh 900,000
Kenyenya Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- At Finishing Stage
- total cost
- Ksh 1,275,000
- estimate
- Ksh 300,000
Etono Health Centre
- location
-
Keera
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Completed
- total cost
- Ksh 1,250,000
- estimate
- Ksh 1,250,000
Tonga Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- At Lintal Stage
- total cost
- Ksh 1,220,000
- estimate
- Ksh 1,000,000
Nyamaiya Health Centre
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,700,000
Bosiago Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Stalled Proejct Questioned
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,400,000
Kenyerere H/ Centre
- location
-
Bonyatuta Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Staff House
- output
- Staff House
- implementation status
- Complete
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,200,000
Bomorito Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Dormitory
- output
- Dormitory
- implementation status
- On Going
- total cost
- Ksh 1,200,000
- estimate
- Ksh 4,000,000
Sasati Primary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- in -use
- total cost
- Ksh 1,200,000
- estimate
- Ksh 1,000,000
Senator Kebaso Secondary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2003
- action
- Construction of dining Hall
- output
- dining Hall
- implementation status
- Phase 1 Finishing Stage
- total cost
- Ksh 1,150,000
- estimate
- Ksh 1,150,000
Model Girls School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Library
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 1,139,938
- estimate
- Ksh 11,399,382
Motagara Health Centre
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- At Finishing Stage
- total cost
- Ksh 1,100,000
- estimate
- Ksh 300,000
Etono Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,200,000
Mongorisi Water Supply
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2004
- action
- Profection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 700,000
Nyangweta Dispensary
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 300,000
Kiambere Multpurpose Hall
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction Of Chief Camp
- output
- Chief'S Camp
- implementation status
- On Going
- total cost
- Ksh 1,100,000
- estimate
- Ksh 1,400,000
Omokonge Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction-Library
- output
- 1 Classroom
- implementation status
- Completed In Use
- total cost
- Ksh 1,100,000
- estimate
- Ksh 500,000
Kianginda Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Contruction of library
- output
- Library
- implementation status
- Completed In Use
- total cost
- Ksh 1,050,000
- estimate
- Ksh 850,000
Protection Of Springs (Miruka)
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Spring protection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 1,031,000
- estimate
- Ksh 200,000
Kenyenya SDA Boarding
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Library
- output
- Library
- implementation status
- At Lintal Level
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,800,000
Riasindai Primary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- 3 Classrooms Roofed & One At Cable
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,400,000
Bogichora Sironga Electrification
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2004
- action
- Murraming
- output
- Road
- implementation status
- New
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Bosiango Dispensary Male Wing
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 650,000
Nyabisimba Water Supply
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Dispesary
- output
- Dispesary
- implementation status
- At Lintal Stage
- total cost
- Ksh 1,000,000
- estimate
- Ksh 1,000,000
Gesiaga primary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- To Assist Needy Student
- output
- High School Completion
- implementation status
- On Going
- total cost
- Ksh 1,000,000
- estimate
- Ksh 500,000
Riakimai Boarding Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- At Completion Stage
- total cost
- Ksh 950,000
- estimate
- Ksh 2,300,000
Ramba Health centre
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Dispensary
- output
- -
- implementation status
- in use
- total cost
- Ksh 950,000
- estimate
- Ksh 1,500,000
Embonga Dispensary
- location
-
Keera
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- Completed In Use
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Motagara Health Centre
- location
-
Bomasaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 300,000
Bosamaro Chache Chief's Camp
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 600,000
Sironga Girls Secondary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Admin Block
- output
- Classrooms
- implementation status
- Foundation Stage
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Riamandere Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 900,000
- estimate
- Ksh 500,000
St. Patrice Nyantaro Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Library
- output
- Library
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 4,500,000
Bosamaro Masaba Water Springs
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Spring protection
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 900,000
- estimate
- Ksh 900,000
Ikonge Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Completed In Use
- total cost
- Ksh 850,000
- estimate
- Ksh 800,000
Tinga Health Centre-Staff Houses
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Health Centre
- output
- Health Centre
- implementation status
- On Going
- total cost
- Ksh 850,000
- estimate
- Ksh 750,000
St. Joseph Enchoro Secondary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Repairs Of Office
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 850,000
- estimate
- Ksh 850,000
Nyaigesa Ploytechnic
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Admn. Block
- output
- Admn. Block
- implementation status
- Phase 1 At Finishing Stage
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Bosamaro Chache Water Springs
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Water Supply
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 800,000
- estimate
- Ksh 400,000
Embonga Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Omosasa Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2005
- action
- 3 Classrooms Construction
- output
- Classrooms
- implementation status
- At Finishing Stage
- total cost
- Ksh 800,000
- estimate
- Ksh 600,000
Kenyambi-Getiongo road
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 800,000
- estimate
- Ksh 0
Riamisire Bridge
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2003
- action
- Spring protection
- output
- Water
- implementation status
- New
- total cost
- Ksh 800,000
- estimate
- Ksh 800,000
Gesiaga-Umwar road
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 760,000
- estimate
- Ksh 760,000
Bundo Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Ibucha Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Completed In Use
- total cost
- Ksh 750,000
- estimate
- Ksh 550,000
Gesore Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 1 Adm. Office 4 Classrooms
- output
- 1 Adm. Office 4 Classrooms
- implementation status
- At Finishging Stage
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Geseneno Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Admn Block
- output
- Admn Block
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Bomondo Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 750,000
- estimate
- Ksh 750,000
Gucha Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of dining Hall
- output
- dining Hall
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 150,000
Kemasare Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- On Going
- total cost
- Ksh 750,000
- estimate
- Ksh 700,000
Rirumi Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 710,000
- estimate
- Ksh 3,800,000
Nyabomite-Embonga Road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 701,200
- estimate
- Ksh 1,500,000
Getaari Secondary School , Mototera Dispensary And Masosa Secondary School /Primary School electricity
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2008
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
St Joseph Nyamiranga Dispensary
- location
-
Bomasaro Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- Phase 1 Completed
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Bosamaro Chief Camp
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Installation Of Electricity
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 700,000
Ikobe D.O.K primary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Constaruction Of 4 Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 700,000
- estimate
- Ksh 1,200,000
Gekomoni Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Bugo Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 3 Classrooms
- output
- 3 Classrooms
- implementation status
- Two Classrooms In Use
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Kianungu Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 300,000
Nyagachi Secondary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Adm. Block
- output
- Adm. Block
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 500,000
Bundo Kianyabongere Bridge
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 700,000
- estimate
- Ksh 400,000
Bosamaro Masaba Rura Electrification
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- New
- total cost
- Ksh 699,630
- estimate
- Ksh 699,630
Bosamaro Masaba Rual Electrification
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- On Going
- total cost
- Ksh 699,630
- estimate
- Ksh 699,630
Nyabisimba Rural Electrification
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 650,000
- estimate
- Ksh 650,000
Bonyamatuta Water Springs
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 650,000
- estimate
- Ksh 250,000
Riakimai Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Library
- output
- Library
- implementation status
- On Going
- total cost
- Ksh 650,000
- estimate
- Ksh 450,000
Nyamatoki-Nyamitentemi road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Matierio-Nyabweri road
- location
-
W.Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Miruka-Nyaigesa-Nyandoche Ibere road
- location
-
W.Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- complete
- total cost
- Ksh 600,000
- estimate
- Ksh 0
Gianchore Dispensarydary, Gianchore Secondary School And Geteri Market Electricity
- location
-
Keera
(in West Mugirango)
- year first funded
- 2008
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Bonyunyu Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 600,000
- estimate
- Ksh 800,000
Rateti Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Lintal Stage
- total cost
- Ksh 600,000
- estimate
- Ksh 600,000
Kebirigo Primary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Multipurpose Hall
- output
- Multipurpose Hall
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 700,000
Nyamotentemi Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 600,000
- estimate
- Ksh 900,000
Nyaigesa Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Finishing Level
- total cost
- Ksh 600,000
- estimate
- Ksh 350,000
Egesieri Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Admn.Block
- output
- Admn.Block
- implementation status
- On Going
- total cost
- Ksh 550,000
- estimate
- Ksh 700,000
Bobembe Boys Boarding Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 4 Classrooms
- output
- 4 Classrooms
- implementation status
- At Completion Level
- total cost
- Ksh 550,000
- estimate
- Ksh 791,000
Ratandi Chief Camp
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Kiambere Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Marara Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Constrution
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 550,000
- estimate
- Ksh 0
Rangenyo Water Spring
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Spring protection
- output
- Water
- implementation status
- New
- total cost
- Ksh 550,000
- estimate
- Ksh 250,000
Bosose Nyamokeri Road
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Supply Of Eletricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Keera Youth Project Bumburia Road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gucha Esani Road
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Esani Bridge
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Bridge
- output
- Bridge
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Tinga Water Supply
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2003
- action
- Water Supply
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kianginda Dispensary
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Power Installation
- output
- Electricity
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,000,000
Keera Youth Project
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Mp'S Office
- output
- Mp'S Office
- implementation status
- On Going
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Kabatia Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 500,000
- estimate
- Ksh 900,000
Sironga Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Ekerama Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- Roofed
- total cost
- Ksh 500,000
- estimate
- Ksh 400,000
Nyaisa Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- At Completion Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 200,000
Bomorito Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Completion Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Endabu Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- At Roofing Stage
- total cost
- Ksh 500,000
- estimate
- Ksh 100,000
Bosose Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Supply Of Water Tank
- output
- Water Tank
- implementation status
- Completed In Use
- total cost
- Ksh 500,000
- estimate
- Ksh 700,000
Nyamwetureko Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Phase 1 Completed
- total cost
- Ksh 500,000
- estimate
- Ksh 600,000
Kianyabongere Primary School -Water
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- 2 Classrooms Construction
- output
- Classrooms
- implementation status
- in-use
- total cost
- Ksh 500,000
- estimate
- Ksh 300,000
Gesore secondary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2009
- action
- Contruction
- output
- Library
- implementation status
- On going
- total cost
- Ksh 500,000
- estimate
- Ksh 1,500,000
Kiambere Multi Purpose Hall
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 0
Kenyenya-Nyairisa Road
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Gesero-Nyachogochog road
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 500,000
- estimate
- Ksh 500,000
Bondeka Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Plastering Classrooms
- output
- Multipurpose Hall
- implementation status
- New
- total cost
- Ksh 450,000
- estimate
- Ksh 350,000
Kebirigo Secondary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2005
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Completed
- total cost
- Ksh 450,000
- estimate
- Ksh 450,000
Embonga primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2009
- action
- Contruction
- output
- Classrooms
- implementation status
- On-going
- total cost
- Ksh 450,000
- estimate
- Ksh 1,000,000
Nkora School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- in use
- total cost
- Ksh 450,000
- estimate
- Ksh 0
Ekoro P.A.G primary school
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 450,000
- estimate
- Ksh 800,000
Nyangoso Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2007
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 450,000
- estimate
- Ksh 325,000
Omosocho Tea Buying centre
- location
-
W. Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- Contruction
- output
- Buying Centre
- implementation status
- On-going
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Nyansabakwa Secondary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Gianchore Health Centre
- location
-
Keera
(in West Mugirango)
- year first funded
- 2007
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Riamandere Secondary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 0
Mabundi -Sironga Pipled Water
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Profection
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Mabundu-Sironga Pipled Water
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Water Supply
- output
- Water
- implementation status
- in use
- total cost
- Ksh 400,000
- estimate
- Ksh 400,000
Nyainogu Primary School
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Administration Block
- output
- 1 Administration Block
- implementation status
- Roofed, Plastering And Flaming
- total cost
- Ksh 400,000
- estimate
- Ksh 500,000
Marindi Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 450,000
Kenyambi Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Adms Block
- output
- Adms Block
- implementation status
- New
- total cost
- Ksh 400,000
- estimate
- Ksh 200,000
Nyamira Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 400,000
- estimate
- Ksh 75,000
Kegori Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Getaari Gravity Water Project
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- In use
- total cost
- Ksh 350,000
- estimate
- Ksh 0
Nyamira Water Springs
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Siamani Water Springs
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Nyanturago Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Repair Of Toilets
- output
- Repair Of Toilets
- implementation status
- On Going
- total cost
- Ksh 350,000
- estimate
- Ksh 750,000
Nyanchogochogo Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Plastering And Flooring 1 Newest
- output
- 4 Newest Classrooms
- implementation status
- Repairs
- total cost
- Ksh 350,000
- estimate
- Ksh 350,000
Mongorisi Primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- Rental Level
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Gucha Youth Polytechnic
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamaiya Service Nyamaiya/Monga Electricity
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- in use
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Miruka-Matierio School Ratandi Road Yout
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Ikurucha Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 0
Nyansabakwa-Matierio Road
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction Of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- New
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Mangonga Water Spring
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Spring protection
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Nyamira Township Water Springs
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Water Supply
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 300,000
- estimate
- Ksh 100,000
Eronge Health Centre
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- On Going
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Rangenyo Day Mixed Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 2 Classrooms
- output
- 2 Classrooms
- implementation status
- One Roofed & 1 At Lintal Stage
- total cost
- Ksh 300,000
- estimate
- Ksh 450,000
Bonyaiguba Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- Project In Question
- total cost
- Ksh 300,000
- estimate
- Ksh 200,000
Matierio Village Polytechnic
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Phase 1 In Use
- total cost
- Ksh 300,000
- estimate
- Ksh 300,000
Tente Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2003
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 275,000
- estimate
- Ksh 75,000
Mborogo-Ikurucha-Geteri Road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Moruga Primary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2009
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Goin G
- total cost
- Ksh 250,000
- estimate
- Ksh 800,000
Ratandi primary School
- location
-
W. Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- Construction
- output
- Classroom
- implementation status
- On-going
- total cost
- Ksh 250,000
- estimate
- Ksh 500,000
Riamandere primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2009
- action
- Construcdtion
- output
- Latrine
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kianungu primary School
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2009
- action
- Construction
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Tinga D.O.K primary
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2009
- action
- Construction
- output
- Classroom
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Tonga Omonuri Boarding Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Nyatigo-Bundo-Sironga Road Youth Projec
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Hall
- output
- Hall
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 0
Kebirigo Water Springs
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Water Supply
- output
- Water
- implementation status
- Complete
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Enchoro Water Springs
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2004
- action
- Profection
- output
- Water
- implementation status
- On Going
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Kebirigo/Nyakeore Rural Electricity
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 250,000
- estimate
- Ksh 250,000
Bosamaro Chache Road Youth Projec
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 240,000
- estimate
- Ksh 0
Nyaisa Secondary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- Completed In Use
- total cost
- Ksh 220,650
- estimate
- Ksh 1,400,000
Bwokongo Buying Centre
- location
-
W.Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- output
- Buying Centre
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyainogu Rionyiego Road Youth Projec
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Otanyore Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyabomite Nurseries
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- Dry
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyamatoki -Kioge -Daraja Road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2007
- action
- n/a
- output
- -
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Rangenyo Road Youth Projec
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyabomite Nyangoko/Nyasangio Factory
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Ramba primary School
- location
-
Bogichora
(in West Mugirango)
- year first funded
- 2009
- action
- Construction
- output
- Classrooms
- implementation status
- On-going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Rangenyo primary Boarding
- location
-
W.Mugirango
(in West Mugirango)
- year first funded
- 2009
- action
- Renovation
- output
- Classrooms
- implementation status
- On-going
- total cost
- Ksh 200,000
- estimate
- Ksh 500,000
Kebirigo-Riakinaro road
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Mobamba -Nyakemincha road
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2009
- action
- Maintaince
- output
- Road
- implementation status
- Complete
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Nyameru ELCK primary
- location
-
Keera
(in West Mugirango)
- year first funded
- 2009
- action
- Contruction
- output
- Classrooms
- implementation status
- On-going
- total cost
- Ksh 200,000
- estimate
- Ksh 1,500,000
Nyameru Primary School
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Dormitory
- output
- 1 Dormitory
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 350,000
Mariba Primary School
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Construction Of 2 Classrooms
- output
- Classrooms
- implementation status
- On-Going
- total cost
- Ksh 200,000
- estimate
- Ksh 600,000
Bosose Borehole
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Water Supply
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Riochari Water Spring
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Spring protection
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Iranda-Endabu-Riatura Road
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tente-Bomondo Road
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
St. George Geseneno Road
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Ekerubo-Gesiango Road
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Gesero-Ndurumo Road
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Rianyabao Road
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Tinga Bosamaro Chache Power Project
- location
-
Bosamaro Chache
(in West Mugirango)
- year first funded
- 2004
- action
- Construction of Chief'S Camp
- output
- Chief'S Camp
- implementation status
- On Going
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Keera Chief's Camp
- location
-
Keera
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Matierio Chief's Camp Office
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Road Construction
- output
- Road
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Egesieri Kemasare Road
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Power Installation
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyangoko Coffee Factory
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Electricity
- output
- Electricity
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyasangio Coffee Factory
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of Coffee Factory
- output
- Coffee
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 200,000
Nyabisimba Borehole
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Dispensary
- output
- Dispensary
- implementation status
- not known
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Riatima Nyakemincha Road Youth Project
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Water Supply
- output
- Water
- implementation status
- New
- total cost
- Ksh 200,000
- estimate
- Ksh 0
Masauri-Nyamotentemi Road
- location
-
Keera
(in West Mugirango)
- year first funded
- 2008
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Gucha Secondary School -Lab
- location
-
Bosamaro Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Enchoro Primary School
- location
-
Bomasaro Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Laboratory
- output
- Laboratory
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Chief Camp Mateierio School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Classrooms
- output
- Classrooms
- implementation status
- New
- total cost
- Ksh 150,000
- estimate
- Ksh 0
Rianchongi Water Spring
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2008
- action
- Spring protection
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Kiabiraa Borehole
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Rehabilition Of Borehole
- output
- Borehole
- implementation status
- On Going
- total cost
- Ksh 150,000
- estimate
- Ksh 150,000
Masosa Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2007
- action
- Construction of Road
- output
- Road
- implementation status
- New
- total cost
- Ksh 100,000
- estimate
- Ksh 0
Siamani Water Springs
- location
-
Bonyamatuta Chache
(in West Mugirango)
- year first funded
- 2006
- action
- Water Supply
- output
- Water
- implementation status
- Completed
- total cost
- Ksh 100,000
- estimate
- Ksh 100,000
Gekomoni Primary School
- location
-
West Mugirango
(in West Mugirango)
- year first funded
- 2006
- action
- Construction of 1 Classroom
- output
- 1 Classroom
- implementation status
- At Lintal Stage
- total cost
- Ksh 75,000
- estimate
- Ksh 75,000
Nyabisimba Water Springs
- location
-
Bonyamatuta Masaba
(in West Mugirango)
- year first funded
- 2007
- action
- Spring protection
- output
- -
- implementation status
- Operational
- total cost
- Ksh 50,000
- estimate
- Ksh 0
Nyairicha Primary School
- location
-
Bonyamatuta Chache
(in West Mugirango)
- action
- Classroms Repairs
- output
- Classrooms
- implementation status
- Complete
- total cost
- Ksh 0
- estimate
- Ksh 75,000