The Constituencies Development Fund was established through the CDF Act, 2003 as a public funded kitty that targets development projects at the grassroots level.

It is one of the several devolved funds set up by the Government to mitigate poverty and to harmonize the spread of development throughout the country. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency. It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

It aims at ensuring a portion of the Government Annual Revenue is earmarked for constituencies to finance development projects qualified on a priority basis arrived at by members of a constituency.

Projects in Wundanyi

Bursary Funds

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Bursary Allocation
output
Improve Education Standards
implementation status
Bursary Allocated
total cost
Ksh 22,053,156
estimate
Ksh 0

Emergency Fund

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Disaster Management
output
Mitigate Risks
implementation status
Meet Constituents Unforeseen Calamities Within Resources
total cost
Ksh 9,990,352
estimate
Ksh 0

Werugha Multipurpose Hall

location
Werugha (in Wundanyi)
year first funded
2004
action
Rehabillitation Of Old Hall
output
Meeting Place
implementation status
Ground Floor Re-Done & Furniture Bought
total cost
Ksh 7,100,000
estimate
Ksh 8,000,000

Grader Project

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Buy A Constituency Grader
output
Make Road Construction Easy & Fast
implementation status
Equipment Maintainance Logistics Difficult
total cost
Ksh 7,000,000
estimate
Ksh 21,000,000

Administration

location
Wundanyi (in Wundanyi)
year first funded
2003
action
Pay For Office Administrative Expenses
output
Smooth Office Administration
implementation status
Prompt Services To All Stake Holders
total cost
Ksh 6,464,467
estimate
Ksh 0

Rural Electrification

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Connect Most Of The Public Institutions With Power
output
Lighting & Support Jua Kali Sector Initiatives
implementation status
Waiting For Implementation Moderates From Rural Electrification Authority
total cost
Ksh 5,000,000
estimate
Ksh 10,000,000

Kiloghwa-Kishenyi-Lolo N

location
Mghange (in Wundanyi)
year first funded
2004
action
Intake Construction & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Survey, Intake & Tank Complete. Pipe Purchase In Tendering Process
total cost
Ksh 4,500,000
estimate
Ksh 16,000,000

Saghasa-Vighombonyi

location
Wumingu (in Wundanyi)
year first funded
2003
action
Construction Of Irizi Tank, Pump Installation & Pipe Laying
output
Access Water For Domestic Use
implementation status
Tank Constructed, Pump Purchased & Pipe Laying In Progress
total cost
Ksh 4,400,000
estimate
Ksh 10,000,000

Iyale-Msidunyi

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Tank, Intake Construction & Pipe Laying
output
Clean Water For Domestic Use
implementation status
Tank, Intake Construction, Pipes Laid & Others To Be Bought
total cost
Ksh 4,100,000
estimate
Ksh 6,000,000

Kishushe

location
Kishushe (in Wundanyi)
year first funded
2006
action
Construction Of ChiefS Office & Build A Modern Community Hall
output
Meeting Place
implementation status
Chief Office Built & Hall Biuld To Windows Level
total cost
Ksh 2,900,000
estimate
Ksh 7,000,000

Mbale

location
Mbale (in Wundanyi)
year first funded
2006
action
Construction of A Modern Community
output
Meeting Place
implementation status
Rough Stones & Sand Bought, Bq Done, Scoping Foundation
total cost
Ksh 2,700,000
estimate
Ksh 7,000,000

Majughu-Mwanda

location
Mwanda (in Wundanyi)
year first funded
2003
action
Survey, Tank & Intake Construction
output
Clean Water For Domestic Use
implementation status
Survey Done, Intake & Tank Constructed
total cost
Ksh 2,693,605
estimate
Ksh 10,000,000

Kakimwaita

location
Kishushe (in Wundanyi)
year first funded
2003
action
Sinking Of Borehole, Pump & Pipe Laying
output
Access Water For Domestic Use
implementation status
Borehole Sunk, Water Salty & Pump Submerged
total cost
Ksh 2,535,921
estimate
Ksh 36,349,860

Constituency Office

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Acquire Land & Build A Cdf Office
output
Acquire A Permanent Office Space
implementation status
Land Identified, Part Development Plan In Place. Boundaries Marked Out, Waiting For The Bq
total cost
Ksh 2,500,000
estimate
Ksh 12,000,000

Ngelenyi Dam

location
Wumingu (in Wundanyi)
year first funded
2005
action
Water Permit, Construction Of 3 Water Pans
output
Access Water For Irrigation Use
implementation status
Bushes Around 6 Acre Dam Cleared, Indigenous Trees Planted & Pans Just Tendered
total cost
Ksh 2,300,000
estimate
Ksh 6,000,000

Wesu District Hospital

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Repair Of 4 Chamber Mortuary, Oxygen Concentrators, Wheel Chairs & Baby Incubator
output
Quality Health Facilities Nearer To People
implementation status
Mortuary Repaired & Equipment Ordered
total cost
Ksh 2,240,905
estimate
Ksh 3,000,000

Mwanyalo School

location
Wumingu (in Wundanyi)
year first funded
2003
action
4 New Classroom Construction
output
Better Classrooms
implementation status
4 Classes Completed & Other 4 Raised To Window Level
total cost
Ksh 2,150,000
estimate
Ksh 5,000,000

Sangeroko

location
Werugha (in Wundanyi)
year first funded
2006
action
Purchase Of Equipment, Construction Of Lab & 2 Staff Houses
output
Health Facilities Nearer To People
implementation status
Equipment Bought - 2 Staff Houses Constructed & At Plastering Stage
total cost
Ksh 2,100,000
estimate
Ksh 3,000,000

Recurrent Expenditure

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Meet Office Recurrent Expences
output
Smooth Office Administration
implementation status
Fueling Of Motor Cycles, Maintainace Of All Office Epuipment
total cost
Ksh 2,016,680
estimate
Ksh 0

Mbela Secondary School

location
Kishushe (in Wundanyi)
year first funded
2004
action
Construction Of 4 New Classrooms & A Laboratory
output
Better Lerning Enviroment
implementation status
2Classrooms Complete
total cost
Ksh 2,010,000
estimate
Ksh 5,500,000

Mghange Dawida

location
Mghange (in Wundanyi)
year first funded
2008
action
Construction Of A Modern Community Hall
output
Meeting Place
implementation status
Bq& Arc Drawings Done, Tendering Stage
total cost
Ksh 2,000,000
estimate
Ksh 7,000,000

Sirienyi School

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Construction Of 2 New Classrooms And Renovations
output
Better Classrooms
implementation status
Renovations Done & 2 New Classrooms Done But Missing Doors & Windows
total cost
Ksh 2,000,000
estimate
Ksh 2,000,000

Mwangea School

location
Mghange (in Wundanyi)
year first funded
2005
action
Renovation Of 7 Classrooms, Building Of Pre-School.
output
Better Classrooms
implementation status
Renovations Done, 1 Class Complete, Toilet Excavated
total cost
Ksh 2,000,000
estimate
Ksh 5,277,079

Wundanyi Cooling Plant

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Build Shell/Building To Accommodate Cooling Plant
output
Support Agri-Business
implementation status
Waiting For Project Approval By Cdf Board
total cost
Ksh 2,000,000
estimate
Ksh 5,000,000

Jkuat Taita

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Install Lpg Facilities
output
Provide Improved & Environment Friendly Energy
implementation status
Tendering Process In Progress
total cost
Ksh 2,000,000
estimate
Ksh 0

Funju Secondary School

location
Wumingu (in Wundanyi)
year first funded
2004
action
Construction Of 4 New Classrooms & A Laboratory
output
Better Classrooms
implementation status
3 Classrooms Completed & Furnished
total cost
Ksh 1,910,000
estimate
Ksh 5,000,000

Mjajenyi

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Tank & Intake Construction & Pipe Laying
output
Clean Water For Domestic Use
implementation status
Tank, Intake Construction Complete Pipes In Tendering Process
total cost
Ksh 1,900,000
estimate
Ksh 6,000,000

Mwarekeronyi

location
Mghange (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Intake Done, Purchase Of Pipes In Tendering Process
total cost
Ksh 1,900,000
estimate
Ksh 5,000,000

Monitoring & Evaluation

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Capacity Build M&E Activities Of Cdf Projects
output
Ensure Projects Are Implemented As Required
implementation status
Exercise Carried Out Periodically & Advice To Pmc Provided Where Need Arises
total cost
Ksh 1,839,416
estimate
Ksh 0

Snr Chief Mwangeka

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Dorm Construction
output
Better Environment
implementation status
Work In Progress
total cost
Ksh 1,800,000
estimate
Ksh 5,000,000

Manalonyi

location
Wumingu (in Wundanyi)
year first funded
2006
action
Construction Of Intake, Tank & Pipe Laying
output
Access Water For Domestic Use
implementation status
Intake Constructed, Pipes Laid
total cost
Ksh 1,800,000
estimate
Ksh 3,000,000

Ndumbinyi School

location
Mwanda (in Wundanyi)
year first funded
2005
action
Construction Of 2 New Classroom & Renovations
output
Conducive Learning Environment
implementation status
2 New Classroom Constructed
total cost
Ksh 1,700,000
estimate
Ksh 5,277,079

Ngolia School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Construction Of 4New Classrooms
output
Conducive Learning Environment
implementation status
Classes Raised To Window Level & Furniture Made
total cost
Ksh 1,600,000
estimate
Ksh 5,227,079

Mwanda

location
Mwanda (in Wundanyi)
year first funded
2005
action
Construction Of A Modern Community Hall & Offices
output
Meeting Place
implementation status
Extending Foundation As Advised By Dwo
total cost
Ksh 1,600,000
estimate
Ksh 7,000,000

Mwanda Dispensary

location
Mwanda (in Wundanyi)
year first funded
2007
action
Tank Construction & Pipe Laying
output
Access Water For Domestic Use
implementation status
Pipes Tendering In Progress
total cost
Ksh 1,600,000
estimate
Ksh 6,000,000

Ngerenyi

location
Wundanyi (in Wundanyi)
year first funded
2008
action
n/a
output
-
implementation status
200,000/= from emergency
total cost
Ksh 1,500,000
estimate
Ksh 7,000,000

Nguraru School

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation Of 7 Classrooms
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 1,500,000
estimate
Ksh 5,000,000

Funju/Mwaroko

location
Mghange (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Intake Done, Some Pipes Laid & More To Be Bought
total cost
Ksh 1,500,000
estimate
Ksh 3,786,619

Mlamba School

location
Mwanda (in Wundanyi)
year first funded
2004
action
New Classroom Construction
output
Better Classrooms
implementation status
3 New Classrooms Complete
total cost
Ksh 1,500,000
estimate
Ksh 5,000,000

Mghange Dawida

location
Mghange (in Wundanyi)
year first funded
2005
action
Purchase Of Equipment, Construction Of Lab & 2 Staff Houses
output
Health Facilities Nearer To People
implementation status
Equipment Bought -2 Staff Houses Tender In Progress
total cost
Ksh 1,500,000
estimate
Ksh 3,000,000

Mraru

location
Wumingu (in Wundanyi)
year first funded
2007
action
Bridge Construction
output
Easier Transport
implementation status
Funds Inadequate
total cost
Ksh 1,500,000
estimate
Ksh 2,000,000

Choke School

location
Mbale (in Wundanyi)
year first funded
2003
action
Renovation Of 3 Classrooms & Purchase Of Desks
output
Better Classrooms
implementation status
Renovations Done & Desks Purchased
total cost
Ksh 1,450,000
estimate
Ksh 5,000,000

Mwataru

location
Mbale (in Wundanyi)
year first funded
2003
action
Purchase Of Piping Materials
output
Access Water For Domestic Use
implementation status
Materials Bought
total cost
Ksh 1,400,000
estimate
Ksh 5,000,000

Kiamachughu School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Construction Of 4New Classrooms
output
Conducive Learning Environment
implementation status
4 Classrooms Built Not Plastered & Equipped With Wooden Desks, Tables & Chairs
total cost
Ksh 1,400,000
estimate
Ksh 5,227,079

Mbauro School

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovations
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 1,300,000
estimate
Ksh 5,000,000

Loghia

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Survey, Intake, Tank & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Survey, Intake, Tank Complete & Pipes In Tendering Process
total cost
Ksh 1,200,000
estimate
Ksh 2,000,000

Mbanga Ngwale

location
Mwanda (in Wundanyi)
year first funded
2005
action
Intake Renovations, Tank Construction & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Tank Constructed & Pipes Laid
total cost
Ksh 1,200,000
estimate
Ksh 4,000,000

Sangenyi School

location
Werugha (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations & Desks Purchased
total cost
Ksh 1,200,000
estimate
Ksh 5,000,000

Iyale School

location
Mghange (in Wundanyi)
year first funded
2006
action
Construction Of 3 New Classroom
output
Conducive Learning Environment
implementation status
2 Classes Complete, 3Rd At Foundation Level
total cost
Ksh 1,200,000
estimate
Ksh 5,000,000

Daku School

location
Kishushe (in Wundanyi)
year first funded
2006
action
Construction Of 4 New Classrooms
output
Conducive Learning Environment
implementation status
2 Classrooms Complete, 2 Built Without Doors And Windows
total cost
Ksh 1,200,000
estimate
Ksh 5,227,079

Sangenyi Kishushe

location
Kishushe (in Wundanyi)
year first funded
2007
action
Pipes Laying
output
Clean Water For Domestic Use
implementation status
Pipes Tendering In Progress
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Nyache School

location
Wumingu (in Wundanyi)
year first funded
2004
action
Renovations Of 4 Classrooms
output
Better Classrooms
implementation status
Renovations Done & Furniture Bought
total cost
Ksh 1,100,000
estimate
Ksh 5,000,000

Kishushe School

location
Kishushe (in Wundanyi)
year first funded
2005
action
Renovations & Construction Of 1 New Classroom
output
Conducive Learning Environment
implementation status
Class Build But Without Windows & Door
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Shigharo School

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations Complete
total cost
Ksh 1,100,000
estimate
Ksh 5,000,000

Shimbo School

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Text Books
output
Better Classrooms & Good Results
implementation status
Books Purchased
total cost
Ksh 1,100,000
estimate
Ksh 3,000,000

Toro

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Survey, Intake, Tank & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Survey, Intake & Tank Complete. Pipes In Tendering Process
total cost
Ksh 1,100,000
estimate
Ksh 6,354,650

Matasenyi

location
Werugha (in Wundanyi)
year first funded
2003
action
Pipes Laying
output
Clean Water For Domestic Use
implementation status
Pipes Tendering In Progress
total cost
Ksh 1,100,000
estimate
Ksh 5,000,000

Ngonda Nursery Hall

location
Wundanyi (in Wundanyi)
year first funded
2005
action
New Construction
output
Meeting Place
implementation status
Hall Biult, & Plastic Chairs Bought
total cost
Ksh 1,100,000
estimate
Ksh 2,000,000

Mwanda School

location
Mwanda (in Wundanyi)
year first funded
2003
action
Renovations
output
Better Classrooms
implementation status
2 Classes Constructed
total cost
Ksh 1,050,000
estimate
Ksh 5,000,000

Funju School

location
Mwanda (in Wundanyi)
year first funded
2005
action
Construction Of 4 New Classroom
output
Increased Enrollment
implementation status
3 Incomplete Classrooms Constructed
total cost
Ksh 1,018,237
estimate
Ksh 2,500,000

Wumingu Cooling Plant

location
Wumingu (in Wundanyi)
year first funded
2008
action
Murram Access Road
output
Ensure Road Is Accessible Always
implementation status
Waiting For Project Approval By Cdf Board
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Mghange Nyika Dispensary

location
Mghange (in Wundanyi)
year first funded
2009
action
Biuld A Marternity Ward
output
Ouality Health Care
implementation status
Foundation Being Laid
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Werugha Dispensary

location
Mghange (in Wundanyi)
year first funded
2009
action
Biuld A Twin Staff House
output
Retention Of Government Health Workers
implementation status
Tendering Process Ongoing
total cost
Ksh 1,000,000
estimate
Ksh 1,500,000

Shanga-Msangarinyi

location
Werugha (in Wundanyi)
year first funded
2005
action
Tank, Intake Construction & Pipe Laying
output
Clean Water For Domestic Use
implementation status
Tank, Intake Construction & Pipes Laid
total cost
Ksh 1,000,000
estimate
Ksh 3,000,000

Mazizi-Safughi

location
Werugha (in Wundanyi)
year first funded
2005
action
Intake, Servey, Electricity Connection&Pipe Laying
output
Clean Water For Domestic Use
implementation status
Kplc Deposit Of 700,000/= Paid. Electricity Not Connected
total cost
Ksh 1,000,000
estimate
Ksh 5,000,000

Shagha School

location
Wumingu (in Wundanyi)
year first funded
2006
action
Renovations & Construction Of 1 New Classroom
output
Conducive Learning Environment
implementation status
Class Build But Without Windows & Door
total cost
Ksh 1,000,000
estimate
Ksh 0

Mwarombo School

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations & Desks Purchased
total cost
Ksh 1,000,000
estimate
Ksh 5,000,000

Mwarungu School

location
Wumingu (in Wundanyi)
year first funded
2004
action
Workshop Construction & Purchase Of Tools
output
Acquisition Of Technical Skills
implementation status
Ground Floor Complete
total cost
Ksh 1,000,000
estimate
Ksh 5,000,000

Maghimbinyi School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Renovations Of 8 Classes
output
Better Classrooms
implementation status
Renovations Done & Put Windows & Glasses
total cost
Ksh 900,000
estimate
Ksh 5,227,079

Kidule School

location
Mbale (in Wundanyi)
year first funded
2006
action
Construction Of 2 New Classroom
output
Conducive Learning Environment
implementation status
1 Class Complete. Materials For 2Nd Classroom Now On Site
total cost
Ksh 900,000
estimate
Ksh 5,000,000

Ngulu School

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovations
output
Better Classrooms
implementation status
Floors Of 8 Classes Done & Window Glasses For 6 Classes Bought
total cost
Ksh 900,000
estimate
Ksh 5,227,079

Mwakishimba School

location
Werugha (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations & Desks Purchased
total cost
Ksh 900,000
estimate
Ksh 5,000,000

St. Johns Secondary School

location
Mghange (in Wundanyi)
year first funded
2006
action
Construction Of New Toilet & Laboratory
output
Better Sanitary & Science Facilities
implementation status
Toilet Complete, Laboratory Works In Tendering Process
total cost
Ksh 900,000
estimate
Ksh 5,000,000

Mlechi School

location
Mbale (in Wundanyi)
year first funded
2005
action
Renovations Of 4 Classrooms
output
Better Classrooms
implementation status
Incomplete
total cost
Ksh 900,000
estimate
Ksh 5,227,079

Mghalu Secondary School

location
Mbale (in Wundanyi)
year first funded
2005
action
Furniture & Construction Of 2 New Classrooms
output
Better Learning Environment
implementation status
Chairs & Desks Bought, Construction Works In Tendering Stage.
total cost
Ksh 850,000
estimate
Ksh 3,000,000

Enviroment Project

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Plant Indigenous Trees
output
Enhance Our Water Catchments
implementation status
Prolonged Drought Caused Delayed Implementation
total cost
Ksh 828,296
estimate
Ksh 3,000,000

Mwandiria

location
Werugha (in Wundanyi)
year first funded
2009
action
Construction Of A Bridge
output
Easier Transport
implementation status
Tendering Process
total cost
Ksh 800,000
estimate
Ksh 1,200,000

Sungululu School

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation Of Computer Rooms
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 800,000
estimate
Ksh 5,000,000

Mwaroko School

location
Mghange (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Verandah Done Halfway, Desks & Cupboard Bought
total cost
Ksh 800,000
estimate
Ksh 5,000,000

Canon Kituri School

location
Werugha (in Wundanyi)
year first funded
2006
action
Dorm Construction
output
Better Environment
implementation status
Work In Progress
total cost
Ksh 800,000
estimate
Ksh 5,000,000

Mbanga Ngombe

location
Mghange (in Wundanyi)
year first funded
2005
action
Intake Construction & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Survey Done, Intake In Progress
total cost
Ksh 800,000
estimate
Ksh 4,000,000

Paranga School

location
Kishushe (in Wundanyi)
year first funded
2004
action
Renovations Of 4 Classrooms
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 800,000
estimate
Ksh 5,000,000

Mwafunja

location
Werugha (in Wundanyi)
year first funded
2007
action
Construction Of A Bridge
output
Easier Transport
implementation status
Bridge Constructed, To Build Gabions
total cost
Ksh 800,000
estimate
Ksh 1,000,000

MaynaRoad School

location
Mbale (in Wundanyi)
year first funded
2003
action
Renovations
output
Better Classrooms
implementation status
Renovations Complete
total cost
Ksh 750,000
estimate
Ksh 5,000,000

Maghimbinyi School

location
Wumingu (in Wundanyi)
year first funded
2006
action
Renovations Of 5 Classrooms
output
Better Classrooms
implementation status
Renovations Done & Furniture Bought
total cost
Ksh 700,000
estimate
Ksh 5,227,079

Mdundonyi-Mbale Line

location
Mbale (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laying
output
Access Water For Irrigation Use
implementation status
Intake Constructed.
total cost
Ksh 700,000
estimate
Ksh 1,000,000

Kitumbi School

location
Wumingu (in Wundanyi)
year first funded
2006
action
Construction Of 2 New Classrooms
output
Better Classrooms
implementation status
2 Classes Raised To Lintel, Roofing Material & Half Iron Sheets
total cost
Ksh 700,000
estimate
Ksh 7,880,590

Ngilinyi School

location
Mbale (in Wundanyi)
year first funded
2006
action
Construction Of 2 New Classroom
output
Conducive Learning Environment
implementation status
1 Classroom Complete, Materials For Other Classroom To Be Procured
total cost
Ksh 700,000
estimate
Ksh 5,000,000

Msangarinyi School

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovations
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 700,000
estimate
Ksh 5,227,079

Mdundonyi Mbal School

location
Mbale (in Wundanyi)
year first funded
2007
action
Construction Of A New Pre-School
output
Increased Enrollment
implementation status
1 Classroom Completed Without Doors And Toilet Dug.
total cost
Ksh 700,000
estimate
Ksh 500,000

Ngelenyi-Choke

location
Wumingu (in Wundanyi)
year first funded
2007
action
Purchase Of Piping Materials
output
Access Water For Domestic Use
implementation status
Tendering In Progress
total cost
Ksh 700,000
estimate
Ksh 2,000,000

Shanga-Mlondo

location
Werugha (in Wundanyi)
year first funded
2003
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Intake Constructed.
total cost
Ksh 650,000
estimate
Ksh 3,000,000

Mwanda

location
Mwanda (in Wundanyi)
year first funded
2005
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Kiwinda School

location
Wundanyi (in Wundanyi)
year first funded
2006
action
New Classroom Construction
output
Better Classrooms
implementation status
Work In Progress
total cost
Ksh 600,000
estimate
Ksh 2,000,000

Ngangao School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Dining Hall Construction & Purchase Of Text Books
output
Access Books, Good Results
implementation status
Text Books Purchased, Construction Materials On Site
total cost
Ksh 600,000
estimate
Ksh 3,000,000

Werugha School

location
Werugha (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations Completed
total cost
Ksh 600,000
estimate
Ksh 5,000,000

Ngongidinyi School

location
Kishushe (in Wundanyi)
year first funded
2007
action
Renovations Of 2 Classrooms
output
Better Classrooms
implementation status
Renovations Done
total cost
Ksh 600,000
estimate
Ksh 2,000,000

Irido/Irodo B

location
Wundanyi (in Wundanyi)
year first funded
2005
action
General Maintenance, Intake Construction & Pipe Laying
output
Clean Water For Domestic Use
implementation status
Intake Built, Maintenance Done & Pipe Laying In Progress
total cost
Ksh 600,000
estimate
Ksh 1,000,000

Tambaru

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Tank Construction & Pipe Laying
output
Water For Irrigation
implementation status
Pipes Laid
total cost
Ksh 600,000
estimate
Ksh 2,000,000

Tinde

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Intake, Tank & Pipes
output
Access Water For Domestic Use
implementation status
Intake Tank Complete
total cost
Ksh 600,000
estimate
Ksh 672,184

Mdundonyi-Mchorongonyi

location
Werugha (in Wundanyi)
year first funded
2005
action
Tank Construction & Pipe Laying
output
Clean Water For Domestic Use
implementation status
Tank Complete & Pipes Laying Complete
total cost
Ksh 550,000
estimate
Ksh 600,000

Sasenyi-Paranga

location
Kishushe (in Wundanyi)
year first funded
2003
action
Purchase Of Piping Materials
output
Access Water For Domestic Use
implementation status
Tendering In Progress
total cost
Ksh 520,000
estimate
Ksh 2,500,000

St. James School

location
Mghange (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations Complete
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Wumingu School

location
Wumingu (in Wundanyi)
year first funded
2006
action
Renovations Of 4 Classrooms
output
Better Classrooms
implementation status
Materials Purchased
total cost
Ksh 500,000
estimate
Ksh 5,227,079

Mlilo School

location
Kishushe (in Wundanyi)
year first funded
2005
action
Construction Of 2 New Classrooms
output
Conducive Learning Environment
implementation status
2 New Classes Constructed
total cost
Ksh 500,000
estimate
Ksh 5,277,079

Nyambu School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Renovations
output
Better Classrooms
implementation status
Roofing & Flooring Of 6 Classes, Nursery School Toilet Done
total cost
Ksh 500,000
estimate
Ksh 5,227,079

Lushangonyi School

location
Mghange (in Wundanyi)
year first funded
2006
action
Classroom Renovations & Build 1 Toilet
output
Better Classrooms
implementation status
Renovations Done, Toilet Sunk & Materials Procured
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Fighinyi School

location
Mbale (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Renovations Completed
total cost
Ksh 500,000
estimate
Ksh 5,000,000

St. Johns School

location
Mghange (in Wundanyi)
year first funded
2004
action
Renovations
output
Better Classrooms
implementation status
Classrooms Renovated
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Mlawa School

location
Wundanyi (in Wundanyi)
year first funded
2004
action
New Classroom Construction
output
Better Classrooms
implementation status
New Class Complete
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Ngonda School

location
Wumingu (in Wundanyi)
year first funded
2005
action
n/a
output
-
implementation status
inuse
total cost
Ksh 500,000
estimate
Ksh 0

Dalmas Moka Secondary School

location
Mwanda (in Wundanyi)
year first funded
2005
action
Purchase Of Text Books
output
Access Books For Better Results
implementation status
Books Purchased
total cost
Ksh 500,000
estimate
Ksh 3,000,000

Draggrey School

location
Wundanyi (in Wundanyi)
year first funded
2009
action
Construction Of 1 Classroom & Furniture
output
Offer More Form One Vacaces To Locals
implementation status
Waiting For Bill Of Quontites
total cost
Ksh 500,000
estimate
Ksh 2,000,000

St Marys Lushangonyi

location
Mghange (in Wundanyi)
year first funded
2009
action
Construction Of 1 Classroom & Furniture
output
Offer More Form One Vacaces To Locals
implementation status
Waiting For Bill Of Quontites
total cost
Ksh 500,000
estimate
Ksh 2,000,000

Mwanda School

location
Mwanda (in Wundanyi)
year first funded
2004
action
Renovation
output
Acquisition Of Technical Skills
implementation status
Renovations Done
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Mbale School

location
Mbale (in Wundanyi)
year first funded
2004
action
Renovation
output
Acquisition Of Technical Skills
implementation status
Renovations Done
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Mwangafwa School

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Renovation
output
Acquisition Of Technical Skills
implementation status
Workshop Complete
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Mwangoto

location
Mbale (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Intake Constructed.
total cost
Ksh 500,000
estimate
Ksh 5,000,000

Mbaramghondi

location
Kishushe (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 500,000
estimate
Ksh 500,000

Sungulu Kitukunyi

location
Wundanyi (in Wundanyi)
year first funded
2009
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 500,000
estimate
Ksh 700,000

Saghasa

location
Werugha (in Wundanyi)
year first funded
2006
action
Build A Hall
output
Meeting Place
implementation status
Hall Build, Plascic Chairs Bought, Next Time A Tv
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Wundanyi Disabled Persons

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Purchase Of Tools
output
Independency
implementation status
Amount Not Fully Utilized, Will Be Given Cidc Shed
total cost
Ksh 500,000
estimate
Ksh 1,000,000

Choke-Wanganga

location
Mbale (in Wundanyi)
year first funded
2007
action
Purchase Of Piping Materials
output
Access Water For Domestic Use
implementation status
Tendering In Progress
total cost
Ksh 450,000
estimate
Ksh 2,000,000

Mwanguwi

location
Mbale (in Wundanyi)
year first funded
2006
action
De-Silt A Dam
output
Access Water For Irrigation Use
implementation status
Dam De-Silted
total cost
Ksh 450,000
estimate
Ksh 600,000

Marumange-Nursery

location
Werugha (in Wundanyi)
year first funded
2005
action
Build A Hall
output
Meeting Place
implementation status
Renovations Done,Project On Church Land
total cost
Ksh 450,000
estimate
Ksh 1,000,000

Choke-Lushangonyi

location
Mghange (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Survey Done, Intake In Progress
total cost
Ksh 400,000
estimate
Ksh 10,694,772

Mwangola Girls

location
Mbale (in Wundanyi)
year first funded
2006
action
New Construction
output
Better Classrooms
implementation status
Foundation Done
total cost
Ksh 400,000
estimate
Ksh 5,000,000

Irienyi Dam

location
Werugha (in Wundanyi)
year first funded
2006
action
Desilting
output
Access Water For Domestic Use
implementation status
Dam Desilted
total cost
Ksh 400,000
estimate
Ksh 500,000

Mazizi-Mwakishamba

location
Werugha (in Wundanyi)
year first funded
2004
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Intake Constructed.
total cost
Ksh 390,000
estimate
Ksh 2,000,000

Mwamracha

location
Werugha (in Wundanyi)
year first funded
2003
action
Intake Construction & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Intake Construction & Pipes Laid
total cost
Ksh 350,000
estimate
Ksh 2,000,000

Mwanamsha

location
Werugha (in Wundanyi)
year first funded
2005
action
Intake Construction & Pipes Laying
output
Clean Water For Domestic Use
implementation status
Intake Construction & Pipes Laid
total cost
Ksh 300,000
estimate
Ksh 500,000

Solome

location
Mghange (in Wundanyi)
year first funded
2007
action
Intake Construction & Pipes Laying
output
Access Water For Domestic Use
implementation status
Tendering In Progress
total cost
Ksh 300,000
estimate
Ksh 2,000,000

Mdundonyi School

location
Mbale (in Wundanyi)
year first funded
2007
action
Construction Of 2 Classrooms
output
Better Classrooms
implementation status
1 Classroom Built Without Doors & Windows
total cost
Ksh 300,000
estimate
Ksh 5,000,000

Werugha Library

location
Werugha (in Wundanyi)
year first funded
2007
action
Electricity Connection & Wiring
output
Encourage Reading Culture In The Village
implementation status
Wiring Done, Waiting For Power Connection By Kplc
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Jipe Kishushe

location
Kishushe (in Wundanyi)
year first funded
2008
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 300,000
estimate
Ksh 600,000

Mwanguwi-Mogho-Mghamb

location
Mbale (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 300,000
estimate
Ksh 300,000

Kapp Project

location
Wundanyi (in Wundanyi)
year first funded
2008
action
Make Tables For Drying Macadamia Nuts
output
Support Agri-Business
implementation status
Waiting For Project Approval By Cdf Board
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kiwani

location
Wumingu (in Wundanyi)
year first funded
2006
action
Intake Construction & Pipes Laid
output
Access Water For Domestic Use
implementation status
Intake Constructed. Pipes Laid
total cost
Ksh 300,000
estimate
Ksh 2,000,000

Kisughusa Madima

location
Werugha (in Wundanyi)
year first funded
2006
action
Intake Pipes
output
Access Water For Irrigation
implementation status
Intake Rehabilitated, Pipes Laid
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Chome

location
Wundanyi (in Wundanyi)
year first funded
2004
action
Intake Construction & Pipes Laid
output
Clean Water For Domestic Use
implementation status
Intake & Pipes Laying Complete
total cost
Ksh 300,000
estimate
Ksh 1,000,000

Kitumbi School

location
Wumingu (in Wundanyi)
year first funded
2005
action
Construction Of Dormitory
output
Enhanced Boarding Facilities
implementation status
Materials Bought
total cost
Ksh 250,000
estimate
Ksh 4,000,000

Mshinyi

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Construction Of A Bridge
output
Easier Transport
implementation status
Bridge Constructed
total cost
Ksh 200,000
estimate
Ksh 300,000

Mwakiwiwi School

location
Mghange (in Wundanyi)
year first funded
2005
action
Purchase Of Text Books
output
Access Books For Better Results
implementation status
Books Purchased
total cost
Ksh 200,000
estimate
Ksh 3,000,000

Wesu School

location
Wundanyi (in Wundanyi)
year first funded
2007
action
Construction Of 1 Classroom & Furniture
output
Increased Enrollment
implementation status
1 Classroom Completed & Furnished
total cost
Ksh 200,000
estimate
Ksh 250,000

Dighare-Kitume

location
Werugha (in Wundanyi)
year first funded
2007
action
Pipes Laying
output
Clean Water For Domestic Use
implementation status
Pipes Tendering In Progress
total cost
Ksh 200,000
estimate
Ksh 2,000,000

Mlondo-Mraru-Mghambinyi

location
Werugha (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 250,000

Mwarangenyi-Mbula

location
Kishushe (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 500,000

Kituri-Ruma-Wesu

location
Werugha (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 300,000

Mnyuchi-Sirienyi

location
Wundanyi (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 400,000

Lushangonyi

location
Mghange (in Wundanyi)
year first funded
2009
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 500,000

Lashu

location
Mghange (in Wundanyi)
year first funded
2008
action
Stone Breaking & Bush Clearing
output
Build An Access Road
implementation status
Roads Maintained
total cost
Ksh 200,000
estimate
Ksh 500,000

Daku-Kishushe

location
Kishushe (in Wundanyi)
year first funded
2003
action
Survey & Intake
output
Access Water For Domestic Use
implementation status
Survey & Intake Done
total cost
Ksh 187,835
estimate
Ksh 2,000,000

Chale/Mkororo

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Construction Of A Bridge
output
Easier Transport
implementation status
Bridge Constructed
total cost
Ksh 182,000
estimate
Ksh 300,000

Kishenyi

location
Werugha (in Wundanyi)
year first funded
2007
action
Bridge Construction
output
Easier Transport
implementation status
Funds Inadequate
total cost
Ksh 150,000
estimate
Ksh 900,000

Kighala Nursery Hall

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovations
output
Meeting Place
implementation status
Renovations Done
total cost
Ksh 150,000
estimate
Ksh 200,000

Kighala Kipotonyi

location
Werugha (in Wundanyi)
year first funded
2005
action
Construction Of A Bridge
output
Easier Transport
implementation status
Bridge Constructed
total cost
Ksh 100,406
estimate
Ksh 200,000

Taita Youth Complex Mghange

location
Mghange (in Wundanyi)
year first funded
2006
action
New Construction
output
Meeting Place
implementation status
Architectural Plan Complete
total cost
Ksh 100,000
estimate
Ksh 10,000,000

Kilwala Mbenge Mrangi

location
Wundanyi (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 100,000
estimate
Ksh 300,000

Kitukunyi

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Construction of A Modern Community
output
Meeting Place
implementation status
Funding Insufficient, Money In Main Account
total cost
Ksh 100,000
estimate
Ksh 3,000,000

Chome School

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Purchase Of Furniture
output
Sufficient Furniture For The Students
implementation status
Furniture Purchased
total cost
Ksh 100,000
estimate
Ksh 200,000

Mrumenyi

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Intake Construction
output
Access Water For Domestic Use
implementation status
Intake Done
total cost
Ksh 100,000
estimate
Ksh 300,000

Mangalenyi

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Intake Construction
output
Access Water For Domestic Use
implementation status
Intake Done
total cost
Ksh 100,000
estimate
Ksh 300,000

Irido Intake

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Intake Construction
output
Access Water For Domestic Use
implementation status
Intake Done
total cost
Ksh 100,000
estimate
Ksh 500,000

Kidakiwi

location
Wundanyi (in Wundanyi)
year first funded
2006
action
Survey & Intake
output
Access Water For Domestic Use
implementation status
Intake Done
total cost
Ksh 100,000
estimate
Ksh 2,327,461

Ndonga Sungululu

location
Wundanyi (in Wundanyi)
year first funded
2003
action
Survey & Intake
output
Access Water For Domestic Use
implementation status
Survey & Intake Done
total cost
Ksh 100,000
estimate
Ksh 100,000

Kiangungu-Msidunyi

location
Wundanyi (in Wundanyi)
year first funded
2003
action
Survey & Intake
output
Access Water For Domestic Use
implementation status
Survey & Intake Done
total cost
Ksh 100,000
estimate
Ksh 3,000,000

Sangenyi

location
Wundanyi (in Wundanyi)
year first funded
2007
action
Bush Clearing & Road Shaping
output
Easier Transport
implementation status
Roads Maintained
total cost
Ksh 100,000
estimate
Ksh 400,000

Aringanga Sungulu

location
Wundanyi (in Wundanyi)
year first funded
2003
action
Survey & Intake
output
Access Water For Domestic Use
implementation status
Survey & Intake Done
total cost
Ksh 80,000
estimate
Ksh 800,000

Kishenyi

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 70,000
estimate
Ksh 100,000

Ngulu

location
Werugha (in Wundanyi)
year first funded
2005
action
Construction Of A Bridge
output
Easier Transport
implementation status
Bridge Constructed
total cost
Ksh 65,000
estimate
Ksh 120,000

Mghange Nyika

location
Mghange (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 50,000
estimate
Ksh 100,000

Iyale

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Masumbenyi

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mghange Dawinda

location
Mghange (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Sughululu

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mtukunyi

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mghambonyi

location
Wumingu (in Wundanyi)
year first funded
2005
action
n/a
output
-
implementation status
-
total cost
Ksh 20,000
estimate
Ksh 100,000

Lushangonyi

location
Mghange (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mwanda

location
Mwanda (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Malela

location
Werugha (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Ngilenyi

location
Wundanyi (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Nyache

location
Wumingu (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mwasungia

location
Wumingu (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Iriwa

location
Mbale (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000

Mwangorua

location
Wumingu (in Wundanyi)
year first funded
2005
action
Renovation & Purchase Of Dip Chemical
output
Healthy Animals
implementation status
Renovations Done, Dip Chemicals Purchased
total cost
Ksh 20,000
estimate
Ksh 100,000