Charity Ngilu

Full name

Charity Kaluki Ngilu

Born

28th January 1952

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Email

ckngilu@yahoo.com

Email

kituicentral@parliament.go.ke

Telephone

0721240042

All parliamentary appearances

Entries 141 to 150 of 806.

  • 15 Feb 2012 in National Assembly: On a point of order, Mr. Speaker, Sir. This morning, the Deputy Speaker sanctioned the Ministry of Water and Irrigation from transacting business in the House. The Assistant Minister for the Ministry gave an explanation as to why we were not here to answer the Question on time because we had some information that had not reached our office before we came here. So, I would like to apologise so that you can lift the sanction on us. view
  • 15 Feb 2012 in National Assembly: I thank you very much, Mr. Speaker, Sir. view
  • 21 Dec 2011 in National Assembly: On a point of order, Mr. Deputy Speaker, Sir. You have heard the Member saying ‘whatever it is’ after he has been told that we are obtaining resources from KFW. In other words, he is not even bothered whether we are getting the money or not. What is the point of us replying to him and giving them this if he has that attitude? view
  • 21 Dec 2011 in National Assembly: On a point of order, Mr. Deputy Speaker, Sir. You have heard the Member saying ‘whatever it is’ after he has been told that we are obtaining resources from KFW. In other words, he is not even bothered whether we are getting the money or not. What is the point of us replying to him and giving them this if he has that attitude? view
  • 21 Dec 2011 in National Assembly: On a point of order, Mr. Deputy Speaker, Sir. You have heard the Member saying ‘whatever it is’ after he has been told that we are obtaining resources from KFW. In other words, he is not even bothered whether we are getting the money or not. What is the point of us replying to him and giving them this if he has that attitude? view
  • 21 Dec 2011 in National Assembly: On a point of order, Mr. Deputy Speaker, Sir. You have heard the Member saying ‘whatever it is’ after he has been told that we are obtaining resources from KFW. In other words, he is not even bothered whether we are getting the money or not. What is the point of us replying to him and giving them this if he has that attitude? view
  • 30 Nov 2011 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I am sure they are on the way. view
  • 30 Nov 2011 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I beg to reply. view
  • 30 Nov 2011 in National Assembly: The programme that will include construction of six irrigation dams is currently under feasibility study which is being funded by the Arab Bank for Economic Development in Africa through a grant aid of US$400,000 which is equivalent to about Kshs40 million. The feasibility study will be completed by May, 2012 and a detailed design is programmed to start thereafter and be completed in February 2013. Construction of dams will then start in May, 2013 and is expected to be completed within two years, that is, by May 2015, the expected cost of all the works is about Kshs5 billion. view
  • 30 Nov 2011 in National Assembly: Mr. Temporary Deputy Speaker, Sir, it is not possible to design dams of this size and get them through the tender processes. The funding has already been obtained and, therefore, it is not possible for this to be done earlier than May, 2015, with all the designs and the construction work having been done. view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus