All parliamentary appearances
Entries 221 to 230 of 1050.
-
30 Nov 2011 in National Assembly:
Madam Temporary Deputy Chairlady, I support.
view
-
30 Nov 2011 in National Assembly:
Madam Temporary Deputy Chairlady, I beg to move that the Committee doth report to the House its consideration of The Engineers Bill (Bill No.25 of 2011) and its approval thereof with amendment.
view
-
30 Nov 2011 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I beg to move that the House doth agree with the Committee in the said Report.
view
-
30 Nov 2011 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I beg to move that The Engineers Bill (Bill No.25 of 2011) be now read the Third Time.
view
-
23 Nov 2011 in National Assembly:
Mr. Speaker, Sir, I beg to reply. (a) I am aware of the frequent snarl-ups on Outering Road and especially at Donholm and Kariobangi roundabouts. To address the problem, my Ministry through the Kenya Urban Roads Authority (KURA) has procured a consultant to undertake the designs for expansion of Outer Ring Road, including improvement of the junctions into interchanges. The designs are expected to be completed by March, 2012. (b) According to statistics available to me from Japan International Corporation (JICA) on transport master plan for Nairobi Metropolitan, Outer Ring Road is one of the roads that have the highest ...
view
-
23 Nov 2011 in National Assembly:
Mr. Speaker, Sir, I want to thank the hon. Member for the compliments that he has given to my Ministry and my officers. The consultant is due to conclude his work on March, 2012. Soon after that, we are already engaging in discussions with a possible financier, that is, the African Development Bank (ADB), and they have already indicated that they are willing to put aside Kshs3 billion for the expansion of that road into a dual carriageway. I want to indicate that it will be a dual carriageway to all the places the hon. Member has listed.
view
-
23 Nov 2011 in National Assembly:
Yes, Mr. Speaker, Sir. We are alive to that situation; that as we improve one road, the congestion increases on another road. In view of the limited financial resources available to us, we cannot do all the roads at the same time. So, we have to go by way of priority, taking into account the volume of traffic on each road. As I indicated the other day, the traffic on Thika Road is the highest compared to any other road. The next is Uhuru Highway and Outer Ring Road.
view
-
23 Nov 2011 in National Assembly:
Mr. Speaker, Sir, the drainages are done by the Ministry of Roads and the management of the drainages after we have done them is the responsibility of the Ministry of Local Government, that is, the City Council of Nairobi. They are the ones who as supposed to manage waste in their locality. I want to urge the Ministry concerned to assist me in that regard. By the way, I also want to add that even members of the public contribute in stock piling waste in our drainage by throwing litter anyhow. I want to urge members of the public that ...
view
-
23 Nov 2011 in National Assembly:
Mr. Speaker, Sir, that is a very good question. Every road, on completion and before it is handed over, the engineer in charge has to make sure that the road furniture is in place. I want to assure this House that, that is always the case. As soon as we have cleared away some “animals” - and allow me to say so - come and take them away as scrap metal.
view
-
23 Nov 2011 in National Assembly:
Mr. Speaker, Sir, I wish to withdraw!
view