8 Nov 2011 in National Assembly:
A consultant has been identified, that is M/s Bundia Associates Consulting Engineers, to undertake preliminary design and detailed engineering design for improvement of roads in Eastleigh that will include 1st and 2nd Avenues. In the Financial Year 2010/2011, my Ministry, through the Kenya Urban Roads Authority (KURA), implemented routine maintenance works totaling to Kshs20,817,134. The works done included base repair, pothole patching, drainage clearing, foot path repair, ditch and gully cleaning on a number of roads in Eastleigh that included 1st and 2nd Avenues, Gen. Waruinge, 18th Street, Munyema Road, Sgt. Kahenda Street and access to Kiambui Street. M/s. Northern ...
view
-
8 Nov 2011 in National Assembly:
(c) To ensure that roads are build to acceptable standards, my Ministry has put in place the following measures. One, is to procure works through competitive bidding. Two, the supervision of road projects is undertaken by registered engineers and consultant; three, use of inspection and acceptance committee to ensure that the contractors build roads as per technical specifications. Four, the provision of adequate defect liability period after construction when the contractor is expected to maintain the road to required standards. Lastly, my Ministry, together with the Ministry of Public Works, is also carrying out institutional reforms in order to establish ...
view
-
8 Nov 2011 in National Assembly:
Thank you, Mr. Deputy Speaker, Sir.
view
-
8 Nov 2011 in National Assembly:
Mr. Deputy Speaker, Sir, I appreciate the concerns raised by the hon. Member. I want to appreciate the various economic activities that take place in Eastleigh and the neighbouring areas. In recognition of that, we have come up with a package that will restore the roads in Eastleigh, so that business people can be able to undertake their business activities without fear of the infrastructure collapsing. Therefore, in connection to that, the Government has engaged Northern Construction Company, as I said, to rehabilitate Second Avenue and Fifteenth Street at a contract sum of Kshs173,360,000. The contract period is 12 months. ...
view
-
8 Nov 2011 in National Assembly:
On the second question, we also engaged a consultant, M/s Bundia Associates Engineering Company, to undertake preliminary design and detailed engineering design for improvement of the following 11 roads in Eastleigh: General Waruinge Road, which is two kilometres; Hombe Road, one kilometre; First Avenue, three kilometres; Second Avenue, two kilometres; Second Street, one kilometre; Third Street, 0.5 kilometres; Seventh Street, 0.5 kilometres; Fifteenth Street, 0.2 kilometres; Karongo Road, 0.25 kilometres; Wood Street, 0.25 kilometres; and part of Juja Road, measuring 5.5 kilometres.
view
-
8 Nov 2011 in National Assembly:
The consultancy for the design has been allocated a total of Kshs30 million and it has already commenced.
view
-
8 Nov 2011 in National Assembly:
Thank you.
view
-
8 Nov 2011 in National Assembly:
Mr. Deputy Speaker, Sir, that would never be the intention of my Ministry. I wish to also confirm that until about two years ago, the responsibility of maintaining roads in urban centres lay with the municipal council and the city councils. The Ministry would forward the funds to the local authorities and then the local authorities would undertake the work but since we took up roads in urban centres under the Kenya Urban Roads Authority (KURA), I have already detailed what we have done in only two years. I am sure that within three years, we will have corrected all ...
view
-
8 Nov 2011 in National Assembly:
Mr. Deputy Speaker, Sir, the roads in Nairobi today are in a very despicable condition. In fact, even as we speak, the main street in Westlands is completely worn out. We have requested Treasury to allocate sufficient funds for us to improve especially the business areas, which include Eastleigh, among others. Once those funds are allocated, we will put them into proper use and address the roads that have been mentioned.
view
-
8 Nov 2011 in National Assembly:
Mr. Deputy Speaker, Sir, that particular question was not covered under the main Question that had been presented to us, which was specific to Eastleigh. However, if the hon. Member wants me to provide him with all the information about all roads within Kamkunji Constituency, I will provide the same and give him a work plan that indicates which road is allocated what amount and at what stage we are in the procurement process.