Magerer Kiprono Langat

Parties & Coalitions

Born

1973

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Email

jonnykip@yahoo.com

Email

Kipkelion@parliament.go.ke

Telephone

0722714648

All parliamentary appearances

Entries 181 to 190 of 254.

  • 1 Mar 2011 in National Assembly: four components. The board endorsed the tender committee’s recommendation on splitting of the project into four components in order to increase competition. (c) Petroleum India International/Sapamo Consultants were involved and prepared a functional specification of EPC contracts and tender documents, including vetting of designs done by EPC contractors. They also supervised the construction of the entire project. Thank you, Mr. Deputy Speaker, Sir. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, the point that the hon. Member is making is that the increase in the size of the pipeline was to allow the flow rate to be faster and move bigger volume. The initial flow rate was at 440 cubic metres of diesel per hour, and it took about four days to Nairobi. It was increased to 550 cubic metres, and now stands at 810 cubic metres per hour. That was achieved in August 2009; this is expected to reduce the travel period to 2.2 days. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, I said the flow rate was increased to 550, and later in August 2009 we were able to achieve 810 cubic metres per hour in terms of the flow rate. We were at the peak performance of the project expecting to operate at 840 cubic metres per hour in terms of the flow rate. However, in terms of the real versus the expected, we have been able to achieve 810. I know we are still working hard to ensure that this flow rate is achieved according to the design that was intended. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, hon. Karua did not, probably, hear what I said when I answered the Question. I said that there was no original design of the project as it was implemented through an EPC type of contract. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, in terms of the Question that was asked there was no original design as it was given at first. However, procurement of a consultant who was supposed to do the engineering, procurement and construction was, therefore, done later. An expression of interest (EOI) for the engineering consultancy services was advertised on May 19th 2005. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, as far as I know, there was no original design. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, I undertake to bring the same; I will get back to the Ministry and if these documents are available, then I should be able to table them here. view
  • 1 Mar 2011 in National Assembly: Thank you, Mr. Deputy Speaker, Sir. view
  • 1 Mar 2011 in National Assembly: Mr. Deputy Speaker, Sir, I seek your indulgence to be given a little more time, so that I do not fall into trouble, as my colleague is saying. view
  • 24 Feb 2011 in National Assembly: Mr. Speaker, Sir, I beg to reply. (a) The KPLC and the REA signed a service level agreement dated 30th April, 2010 which clearly describes the roles of each party with respect to implementation, operation and maintenance of projects implemented by REA. Under this agreement, REA is responsible for design and construction of rural electrification projects on the basis of annual budget approved by this House. Once rural electrification projects are completed, they are inspected by the KPLC to ensure synchronization with the rest of the power distribution grid after which the lines are energized and consumers connected upon payment ... view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus