Wilfred Machage

Full name

Wilfred Gisuka Machage

Born

10th August 1956

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Post

P. O. Box 15292 00509 Nairobi

Post

P.O. Box 41842, 00100 Nairobi, Kenya

Email

gmachage@gmail.com

Telephone

0710442712

Link

@gmachage on Twitter

Link

@gmachage on Twitter

Dr. Wilfred Machage

Wanjiku’s Best Representative – Health (Senate), 2014

All parliamentary appearances

Entries 1301 to 1310 of 2209.

  • 3 Oct 2012 in National Assembly: Mr. Speaker, Sir, I do not have that information, and if it were so, I would be one of the happiest people, because I come from the same County; I will follow up that information. view
  • 2 Oct 2012 in National Assembly: Mr. Speaker, Sir, I beg to reply. I believe that most of the answer was given on Wednesday 12th as per the HANSARD Report. The only information I was to give was the names of the directors. The directors of M/s Decotec Enterprises are Mr. Damins Ojwang and Valeria Anyango. The directors of M/s Willys (K) Limited are John Mwaniki Kabui, Michael Kimiri Mwaniki and Grace Katakaa Mwaniki. view
  • 2 Oct 2012 in National Assembly: Mr. Speaker, Sir, the Ministry advertised the tender with the most appropriate method that was available. I believe that it was well advertised. view
  • 2 Oct 2012 in National Assembly: Mr. Speaker, Sir, to my knowledge, I am satisfied that these directors have no relationship with any member of staff in the Ministry of Roads. If the hon. Member has information to the contrary, I will be very glad to receive that and prosecute it. Otherwise, I am satisfied that the contract was well advertised. view
  • 26 Sep 2012 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) Yes, I am aware that bicycles and motorbikes are causing jam along KANU and Oginga Odinga Street in Nakuru Town. (b) I will put into consideration provision of facilities for non- motorized traffic in Nakuru, but at the moment, I am not able to tell exactly, when the construction of this above mentioned facilities will commence due to financial constraints. view
  • 26 Sep 2012 in National Assembly: Mr. Temporary Deputy Speaker, Sir, the hon. Member should be one of the luckiest in the House and actually I expected him to thank the Ministry for building a new road in his constituency in the name of Oginga Odinga Street. Indeed, other Kenyans are suffering. They have no basic roads. What the hon. Member is asking for is extra building of road paths for bicycles, when other Members in this House do not even have roads for vehicles. Just be fair to other Members. I will consider it when I think I have funds. For now, no! view
  • 26 Sep 2012 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I am very much in order, taking cognizance of the fact that some parts of this country have got more infrastructure development than others. That is painful for a Minister to think about. We have to consider other parts of this country which have no roads instead of considering giving extra funds to roads which have already been built. I am very much in order to consider other parts of this country. view
  • 26 Sep 2012 in National Assembly: On a point of order, Mr. Speaker, Sir. You must have heard what the hon. Member on the Floor said. He implied that part of the duties of an Assistant Minister is to pass water to the Prime Minister. Is he in order? view
  • 25 Sep 2012 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) Unfortunately, one person died when the vehicle they were travelling in was swept away by flood waters while crossing the Gotu Bridge. Six others are still missing. (b) Construction of this bridge has not commenced due to budgetary constraints. Thank you, Mr. Temporary Deputy Speaker, Sir. view
  • 25 Sep 2012 in National Assembly: Mr. Temporary Deputy Speaker, Sir, I have made no contradictions. Actually, the hon. Member has stated the truth. What I have done towards this end is to ensure that a design consultancy has been awarded to M/s Maltiscope Consulting Engineers. This was done on 27th August, this year at a cost of Kshs8.1 million and I expect the design to be over very soon. The construction of this bridge will cost about Kshs1.2 billion and I will only be able to allocate funds once the consultant has produced his report. I am also made to understand that the Constituencies Development ... view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus