Entries 1681 to 1690 of 2209.

  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, I beg to reply. view
  • 10 Sep 2009 in National Assembly: (a) The construction of Mosoriot-Kapsabet Road has not commenced because the design for the same is not complete; view
  • 10 Sep 2009 in National Assembly: (b) The construction of Kapsabet-Sirwa-Yala Road has not commenced because the design of the same road has not been completed. view
  • 10 Sep 2009 in National Assembly: (c) the construction works for that section of Eldoret-Kapsabet Road will commence as soon as the design is complete. view
  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, the Mosoriot-Kapsabet-Yala Road is part of the Eldoret-Kapsabet Road, otherwise referred to as C36. The design for Eldoret-Chavakali Road was awarded to M/s Vavas Engineering Consultants with Sogare Limited Consulting Engineers at a tender sum of Kshs51, 933,200. The design started on 6th April, 2009 and it will take nine months. Therefore, we expect completion of the same on 6th January, 2010. As soon as it is completed, the road project shall be procured and my view
  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, to the contrary, I think the communication is not complete to the hon. Member. I am aware of all that. Let me continue to satisfy the hon. Member that I have actually allocated Kshs400 million for this development from the Development Budget in this year’s budget and a Fuel Levy budget of Kshs150 million. I know that these roads are impassable. I have started a repair programme for this section and I am sure the hon. Member will soon see work on this section. I am using Kshs199,250,000 for the same view
  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, I am yet to prove that the machines that were brought to the site are for the purposes of my work. view
  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, I have clearly said that I have started repair of the road for the purposes of making it motorable. I have clearly said that I have not started constructing this road for the purpose of fully building it. view
  • 10 Sep 2009 in National Assembly: Mr. Speaker, Sir, I beg, to reply but before that, I beg for your indulgence because I had answered all of these Questions except for more information that I was to give to the House today as follows:- view
  • 10 Sep 2009 in National Assembly: The total money allocated to the Ministry of Roads for the implementation of the view

Comments