17 Feb 2009 in National Assembly:
Mr. Speaker, Sir, I beg to reply.
view
17 Feb 2009 in National Assembly:
(a) Construction work between Syomakanda in Kitui West Constituency and River Athi at Syotuvali has not commenced because the bridge across the river at Syotuvali and the approach roads on both sides of the bridge are under design by a consultant.
view
17 Feb 2009 in National Assembly:
(b) It is planned to complete the design of the bridge and the approach roads before the end of March, 2009, following which the work will be prioritized among others for tendering.
view
17 Feb 2009 in National Assembly:
(c) There are no immediate plans to construct two bridges on River Athi to connect Kitui West Constituency and Makueni Constituency at the confluence of Thwake River and Athi River. However, that request will be considered once the works under design are completed.
view
17 Feb 2009 in National Assembly:
Mr. Speaker, Sir, the design of Syotuvali Bridge and the approach road is under design by M/s Howard/Humphrey Consulting Engineers at Kshs15.9 million. The designing work started in September, 2008.
view
17 Feb 2009 in National Assembly:
Mr. Speaker, Sir, they will be considered once the designs of the current work are completed. I am aware that this is a different bridge altogether.
view
12 Feb 2009 in National Assembly:
Mr. Speaker, Sir, I beg to reply.
view
12 Feb 2009 in National Assembly:
Mr. Speaker, Sir, in June, 2008, the tender for the repair and rehabilitation of the road was advertised by the Ministry and the procurement process is on-going.
view
12 Feb 2009 in National Assembly:
Mr. Speaker, Sir, in the current financial year 2008/2009, I have allocated a total of Kshs12,705,000 for routine maintenance of this road as I procure for a more comprehensive management of this road, which is very important. I agree that it is a very important economic network
view
12 Feb 2009 in National Assembly:
4934 PARLIAMENTARY DEBATES February 12. 2009