Magarini

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (71)

There are 71 CDF projects in Magarini. These are the most expensive:

  • Bursary For Bright And Needy Students (2003): Ksh 29,440,287 spent on Helping Bright And Needy Students. (more)
  • Mijikenda-Galana Water Project (2003): Ksh 26,000,000 spent on Piping Water From Sabaki To Galana Sec. School (12Km). (more)
  • Grader Project (2004): Ksh 19,150,000 spent on Purchase Of Grader. (more)
  • Bore-Koromi Culverts (2005): Ksh 15,100,000 spent on Construction Of 2 Box Culverts. (more)
  • Emergency Fund (2004): Ksh 9,990,352 spent on For Emergency/Disaster Mgt. (more)
  • Baricho-Marafa Water Project (2004): Ksh 8,000,000 spent on Purchase Of Still 8 Inch Pipes For 2Km. (more)
  • Baricho-Koromi Box Culvert (2006): Ksh 8,000,000 spent on Construction Of A Box Culvert. (more)
  • Administrative Costs (2003): Ksh 7,671,544 spent on Office Administration. (more)
  • Construction Of Cdf Office (2008): Ksh 7,150,000 spent on Purchase Of Land; Survey; Preparation Of Deed Plan, Structures And Designs. . (more)
  • Marafa Secondary School Boys Hostel (2004): Ksh 6,000,000 spent on Construction Of A Boys Domitory. (more)