9 Dec 2009 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) My Ministry has finalized plans to supply electricity to Morpus Primary School and Morpus Trading Centre in the current Financial Year, 2009/2010. Morpus Girls Secondary School will be considered for supply once the construction of the school has been completed. (b) Orolwo Centre and Samor Primary School will also be supplied with electricity this financial year as these are the priority projects which were given by the hon. Member of Parliament. The first case of Morpus Trading Centre was passed on the
view
-
9 Dec 2009 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I want to confirm to the hon. Member that it will be done by June this year. In fact the transformer will be installed by January. The others, as I am talking right now are on survey and the design works are almost complete. So, I am certain that by June, it will be over. With regard to the first one, I am guaranteeing that even by January, it should be installed. The second one may be done even before June.
view
-
9 Dec 2009 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, we are trying to extend the grid as much as possible to areas which had been left behind. So, I want to assure the hon. Member that we are working on that. We are providing the areas that are off grid with solar systems. For Lodwar, we are going to work on that.
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, before I ask my Question, I would like to bring to the attention of the Chair that I have not received a written answer.
view
-
8 Dec 2009 in National Assembly:
asked the Minister for Water and Irrigation:_ (a) if there are any water resources and development projects initiated by the Ministry in Kuresoi Constituency in the year 2008/2009 and what the cost of each project was; and, (b) what plans the Ministry has for the construction of urban water supply and sewerage system for Keringet Town and the new district headquarters.
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, the Minister has given a fairly good answer and I would like to invite her to the constituency to see for herself why we need these water services.
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, I think the lady mesmerized me!
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, I beg to reply. (a) There has been a delay in completing Chemalal- Kapset and Cheptabach- Chemelet power lines as a result of some challenges encountered by the contractor in procuring imported materials. However, these lines are complete, except for some defects noted during the inspection which are currently being rectified. But I want to say that as per now this has been done. On 29th October, they energised the lines and two transformers were placed. (b) Chemalal-Kapset and Cheptabach power lines will be fully completed and energised by mid of this month. Otherwise, as I am ...
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, it will be fully operational or energized by mid of this month. In our records, there are only two transformers which are missing unless the hon. Member is saying they are three. If they are three, so long as they are serving public utility, I want to guarantee him that they will be installed by then.
view
-
8 Dec 2009 in National Assembly:
Mr. Speaker, Sir, the only reason we know is the delay in some small materials such as transformers. The poles are there. The only area in Coast Province where there was a delay is in swampy areas where we will use concrete polls instead of wooden polls. We already have about 16,000 concrete poles with KPLC. We have arrangements between KPLC and the REA. Yesterday, we had a meeting with the KPLC and they will send some of the poles to REA, so that they can start those projects.
view