  • 11 Apr 2007 in National Assembly: On a point of order, Mr. Temporary Deputy Speaker, Sir. Kenya got her Independence in 1963. Could the hon. Member tell this House if Kacheliba was not part of this country when Kenya got her Independence? He cannot get away with this! view
  • 4 Apr 2007 in National Assembly: Thank you, Mr. Deputy Speaker, Sir. I beg to reply. (a) The contract sum for the Kericho Bus Park is Kshs58,797,427.50. (b) No, the project had not stalled. However, the progress had slowed as the contractor waited for re-design of a major retaining wall within the bus park. (c) There are no immediate plans to build a bus park at Litein. However, this may be considered in future development plans by the Ministry of Local Government. view
  • 4 Apr 2007 in National Assembly: Mr. Deputy Speaker, Sir, the designing of the wall is complete. The re- design was necessitated because there were mud slides within the market area and there was a need to re-design the project so that we have a retaining wall which can stop the mudslides from coming into the market. The design is complete and the project is on course. view
  • 4 Apr 2007 in National Assembly: Mr. Deputy Speaker, Sir, it is not true that 90 per cent of the bus park projects that have been started by this Ministry have stalled. Many of them have been completed and if the hon. Member wants to know, we will show him where they are. However, for those projects which have been slowed down as a result of the re-design as a necessity, like in the case of Kericho Bus Park, we will ensure that they are completed within the shortest time possible. view
  • 4 Apr 2007 in National Assembly: Mr. Deputy Speaker, Sir, the contractor for this project is M/s Njuka Consolidated Ltd and the contract sum, as I have said before, is Kshs58,797,427.50. view
  • 4 Apr 2007 in National Assembly: Mr. Deputy Speaker, Sir, we have instructed the local authority of that area to provide land before the Ministry of Local Government can initiate the provision of more funds in order to start a bus park in Litein. So, we have instructed the local authority of that area to provide land first before we can allocate funds. view
  • 3 Apr 2007 in National Assembly: Mr. Speaker, Sir, I have not received some important information regarding this Question. I seek the indulgence of the House so that I can answer this Question either tomorrow afternoon or on Thursday. view
  • 3 Apr 2007 in National Assembly: Mr. Speaker, Sir, I prefer to answer it on Thursday afternoon. view
  • 28 Nov 2006 in National Assembly: Mr. Deputy Speaker, Sir, I beg to reply. Already there are traffic lights within the major townships namely: Nairobi, Kisumu, November 28, 2006 PARLIAMENTARY DEBATES 3961 Mombasa, Nakuru and Eldoret. There are plans to install new traffic lights while at the same time renovation of the non-functional ones within the urban centres is continuing in order to enhance the smooth flow of vehicles. This year, 2006, within Nairobi Municipal Council, new traffic lights have been installed on two extra junctions namely, Uhuru Highway - Bunyala Road Junction and Uhuru Highway along Museum Hill Roundabout. In order to improve some of ... view
  • 28 Nov 2006 in National Assembly: Mr. Deputy Speaker, Sir, I want to give a comprehensive answer. view