14 Aug 2018 in National Assembly:
THAT, Article 42 of the Constitution affords every person the right to a clean and healthy environment;
view
14 Aug 2018 in National Assembly:
THAT, Article 42 of the Constitution affords every person the right to a clean and healthy environment;
view
14 Aug 2018 in National Assembly:
THAT, under sections 111 and 120(1) of the Land Act, 2012 the National Lands Commission (NLC) can only take formal possession of the affected lands after an award for compensation has been made and the amount paid in full to the affected persons;
view
14 Aug 2018 in National Assembly:
THAT, under sections 111 and 120(1) of the Land Act, 2012 the National Lands Commission (NLC) can only take formal possession of the affected lands after an award for compensation has been made and the amount paid in full to the affected persons;
view
14 Aug 2018 in National Assembly:
THAT, in early 2017, the Government of Kenya through the Kenya Railways Corporation (KRC) embarked construction of the second phase of the Standard Gauge Railway (SGR) Project which starts at the Nairobi Railway Terminal to Enoosurutia in Naivasha. Kenya Railways identified the Nairobi National Park and parcels of lands in Empaash, Tuala, Rongai and Oloorsikon areas within Kajiado East Constituency to be affected by the SGR Phase 2A;
view
14 Aug 2018 in National Assembly:
THAT, in early 2017, the Government of Kenya through the Kenya Railways Corporation (KRC) embarked construction of the second phase of the Standard Gauge Railway (SGR) Project which starts at the Nairobi Railway Terminal to Enoosurutia in Naivasha. Kenya Railways identified the Nairobi National Park and parcels of lands in Empaash, Tuala, Rongai and Oloorsikon areas within Kajiado East Constituency to be affected by the SGR Phase 2A;
view
14 Aug 2018 in National Assembly:
THAT, for this purpose, the Government of Kenya commissioned an Environmental and Social Impact Assessment (ESIA) study on the proposed railway corridor in October, 2016. The ESIA required the KRC and the contractor to employ certain measures to ensure that the environmental and social impacts of the SGR Phase 2A project are either mitigated or eliminated;
view
14 Aug 2018 in National Assembly:
THAT, for this purpose, the Government of Kenya commissioned an Environmental and Social Impact Assessment (ESIA) study on the proposed railway corridor in October, 2016. The ESIA required the KRC and the contractor to employ certain measures to ensure that the environmental and social impacts of the SGR Phase 2A project are either mitigated or eliminated;
view
14 Aug 2018 in National Assembly:
THAT, some of the measures include the corporate social responsibility (CSR) projects on roads, water projects and other infrastructure projects;
view
14 Aug 2018 in National Assembly:
THAT, some of the measures include the corporate social responsibility (CSR) projects on roads, water projects and other infrastructure projects;
view