Wilfred Machage

Full name

Wilfred Gisuka Machage

Born

10th August 1956

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Post

P. O. Box 15292 00509 Nairobi

Post

P.O. Box 41842, 00100 Nairobi, Kenya

Email

gmachage@gmail.com

Telephone

0710442712

Link

@gmachage on Twitter

Link

@gmachage on Twitter

Dr. Wilfred Machage

Wanjiku’s Best Representative – Health (Senate), 2014

All parliamentary appearances

Entries 1951 to 1960 of 2209.

  • 14 Oct 2008 in National Assembly: Mr. Deputy Speaker, Sir, it is true that the road network in this country is in a pathetic condition. There is nothing to be proud of. This House may stand accused of giving less funds to the Ministry of Roads for the maintenance of roads. But I am happy that this year, you have given us slightly over Kshs65 billion. I think Kshs70 billion would be enough for the Ministry 2670 PARLIAMENTARY DEBATES October 14, 2008 to attend to most of the needs as raised on the Floor of the House by the Members of Parliament. I take your sentiments ... view
  • 14 Oct 2008 in National Assembly: Mr. Deputy Speaker, Sir, I, indeed, confirm that I will look at the road when funds are available. view
  • 8 Oct 2008 in National Assembly: Mr. Speaker, Sir, I beg to reply. (a) Yes, I am aware that the road is damaged by heavy traffic and becomes impassable during the rainy season. Because of that, the design and tender documents are ready. (b) The Ministry plans to upgrade the road to bitumen standard in the next financial year, Godwilling. Thank you, Mr. Speaker, Sir. view
  • 8 Oct 2008 in National Assembly: Mr. Speaker, Sir, my apologies sincerely, if the hon. Member has not yet received the written answer. But I think I have good tidings for him; a good message for him! view
  • 7 Aug 2008 in National Assembly: Mr. Deputy Speaker, Sir, I beg to reply. (a) I am aware that the condition of Isiolo-Modogashe Road, which is B9 by classification, has severely deteriorated following the November/December rains. It is made impassable during the rainy season. (b) My Ministry will improve and maintain the road within the current financial year and remove all the bottlenecks. (c) The Ministry plans to improve the road to bitumen standards. The design, plans and tender documentation of the road were completed in April, 2008, and the Ministry, in conjunction with Treasury, is in the process of sourcing for funds to upgrade the ... view
  • 7 Aug 2008 in National Assembly: Mr. Deputy Speaker, Sir, while I politely take your warning to my Ministry, 2438 PARLIAMENTARY DEBATES August 7, 2008 your office and the Office of the Clerk have the responsibility to dispatch the answers that I have already dispatched to Parliament. The proposed allocation for routine and periodic maintenance of that road is Kshs44 million and the following works will be carried out:- (i) Bush clearing. (ii) Patching of potholes. (iii) Reinstating sections which are washed out. view
  • 7 Aug 2008 in National Assembly: Mr. Deputy Speaker, Sir, yes, I am aware that the Isiolo-Modogashe Road B9 traverses Igembe, Tigania and Garbatulla districts of Eastern Province. That road is about 195 kilometres long. I am serious about that project and I have already used Kshs29,589,551 on carrying out the design work. That was done by Otieno Odongo and Partners. It was completed in April this year. It is the duty of this House to allocate money that I have requested for, so that I can raise the Kshs8 billion to build that road. I am also looking for other development partners. Let me say ... view
  • 7 Aug 2008 in National Assembly: Mr. Deputy Speaker, Sir, I will definitely not clear bushes where there are no bushes. That money will be utilised for patching potholes and other works. I take his sentiments very seriously and no mistakes will be done. view
  • 30 Jul 2008 in National Assembly: Naibu Spika wa Muda, shukran kwa kunipa wasaa huu kuunga Hoja hii mkono. Ingawa nimechelewa, ninafikiria ni Hoja ya maana na 2210 PARLIAMENTARY DEBATES July 30, 2008 lazima izingatiwe kusudi tuwe na msingi kamili wa kuiongoza nchi hii. Wazee wa nyumba kumi kumi huko vijijini wana kazi ya kuwasaidia machifu ama naibu wa machifu kwa daraja hilo. Kama vile wanavyoitwa, kazi zao zimepanuka na wakati huu sio nyumba kumi kumi tena. Wanaangaza kazi zao kwa nyumba zaidi ya 100 hata 1,000 kwa wakati mwingine, bila malipo. Naibu Spika wa Muda, nafikiria ni kunyanyaswa kwa hali ya juu kwa kutowalipa marupurupu ... view
  • 23 Jul 2008 in National Assembly: Mr. Speaker, Sir, I beg to reply. (a) I am not aware that contractors gravelling Nyahururu-Boiman-Charagita Road are using soil instead of the required murram. (b) The contractor has completed 9.6 kilometres, which is about 76 per cent, to gravel standards, which has been certified for payment. (c) The section in question covers only 50 metres, starting at Chanainje, on which the contractor use materials from an approved source. The contractor has been instructed to remove the offending materials, reshape and gravel this section using the approved materials. view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)