19 Sep 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I beg that the hon. Member repeat his question because hon. Mwakwere was loudly consulting. Therefore, I did not hear his question. I beg for protection.
view
19 Sep 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, engineers in my Ministry took a lot of cognisance of this fact and everything was done in order.
view
19 Sep 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, it is true it is a different question, but I have taken note of the concern of the hon. Member.
view
19 Sep 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, those are Ministerial logistics on financing. I thought the Member will be happy that we are considering and actually starting phase two. But if he so wishes, I will stop it.
view
30 Aug 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, in the opening remarks of the Chairman, he did refer to hon. Members in this House who are turning this Report into a personality contest. Would I be in order, therefore, to demand that he expounds on that remark or withdraws because it is holding us in bad taste? Substantiate!
view
30 Aug 2012 in National Assembly:
On a point of order, Mr. Temporary Deputy Speaker, Sir. With all due respect to the Chairman - we know that he has done a very good job on this Report – is he in order to continue imputing improper motive on hon. Kimunya; that he connived for spoils without any proof? Whatever he has read does not prove anything.
view
30 Aug 2012 in National Assembly:
On a point of order, Mr. Temporary Deputy Speaker, Sir. There are some procedures and precedents that must be observed in this House. A report is being referred to by the Chairman from the Controller and Auditor-General’s report, which by tradition is supposed to have been tabled in this House to be adopted. I need the guidance of the Chair. Is it proper for the Chairman to use that report, which has not been tabled in this House?
view
29 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, I beg to reply. (a) I am aware that the works on the rehabilitation of Ngondi-Maiella-Nkorianto- Suswa-Didi-Narok Road, otherwise, referred to as E445, has temporarily stalled due to continous rainfall which hindered the progress of repair. (b) The two firms which were awarded the contract are Messrs. Willys Kenya Ltd and Messrs. Decotec Enterprise. (c) The works resumed after the weather conditions became favourable and were completed in early August, 2012. Reinstatement of sections damaged by the rains was first carried out to make the roads motorable. Upgrading of Roads E445/D331/D322/E446 to bitumen standards will be ...
view
29 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, I answer Questions as directed to me from the Speaker’s Office. This is the Question I received. If the hon. Member so wishes to ask the Questions he is putting on the Floor, he can also file it, which I will answer on another day. But I have answered what I received from the House.
view
29 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, any time next week is okay. But allow me to make the following statements. The Member is erroneously accusing the Ministry of adulterating the Questions. He is also accusing the Chair. To me, this is not proper and warranted. What I have brought to the House is the Question I was directed from your office to answer. This is the Question on the Order Paper. So, what I would like to state is that this Question has been adequately answered. Therefore, direct the Member to ask a different Question because I have adequately answered the Question ...
view