Parties & Coalitions

Full name

Lee Maiyani Kinyanjui

Born

1976

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Email

leekinyanjui@yahoo.com

Email

nakurutown@parliament.go.ke

Link

Facebook

Telephone

0722842653

Telephone

0722842653

All parliamentary appearances

Entries 451 to 460 of 1318.

  • 9 Aug 2011 in National Assembly: Mr. Speaker, Sir, I had spoken with the Member and agreed that after he has interrogated the answer, we will be able to respond. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, I beg to reply. view
  • 4 Aug 2011 in National Assembly: (a) My Ministry, through the Kenya National Highways Authority spent Kshs5,932,979 for the maintenance of Chepterit-Baraton-Kaibon-Kipkarren-Turbo Road. view
  • 4 Aug 2011 in National Assembly: (b) My Ministry has completed the design for upgrading of Chepterit-Baraton- Kaibon-Kipkarren-Turbo Road (C37) at a cost of Kshs35 million. We have also set aside Kshs90 million to commence procurement for bituminization of the road later this year. In the meantime, we have provided Kshs18 million for the maintenance for the purpose of ensuring that the road is in a motorable state. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, as I have indicated, we have already completed the design. We are in the process of preparing the advertisement to invite tenderers who are interested in this particular road. Within the next 90 days, we should be able to have the tender out. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, I want to confirm that what the hon. Member has said is, indeed, correct. I would like to assure him that we will start with the worst section. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, I beg to reply. (a) I am aware that the re-carpeting of Nyaru-Eldama Ravine Road was not completed due to exhaustion of funds. (b) This was occasioned by an increase in the quantities due to the severe deterioration of the road, which was used as an alternative road to Eldoret from Nakuru during the reconstruction of the Nakuru-Timboroa Road. My Ministry has allocated a total of Kshs129,500,000 through the Kenya National Highways Authority in this financial year to carry out the remaining works. Thank you, Mr. Speaker, Sir. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, this was based on the quantities that were given to us. I am confident that we will be able to finish the work with the amounts allocated. view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, as I have indicated, we have already set aside the amount. In due course, we will advertise the tender and ensure that we give it to competent contractors to start the works. Allow me to also say that the reason as to why we have had severe deterioration on this road is that we had heavy trucks using it whereas the road had not been designed for that kind of load. We are considering putting a weighbridge on that road to ensure that we do not have a massive deterioration as a result of overloading on that ... view
  • 4 Aug 2011 in National Assembly: Mr. Speaker, Sir, as I have indicated, we are in the process of introducing a mobile weighbridge on that road, and we will be targeting some of those notorious companies, which have been overloading their trucks, especially the trucks belonging to companies that extract raw materials like fluorspar and those of timber merchants, which have also been doing the same. I also want to take this opportunity to sound a serious warning to other road users, who also overload, that we will have weighbridges on all the key roads, including sections of the Malindi-Mombasa Road, where we have had the ... view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus